Escuela Bilingüe Pioneer
101 East Baseline Road Lafayette, CO 80026 | 720.561.7800
Original Construction Date | 1928
PHASE
Phase 2
PROJECT BUDGET
$4,052,003*
*Final budget will be determined during the design phase.
View Project Expenditures
PROJECT TEAM
PROJECT MANAGER: Stephen Henry
ARCHITECT: LOA Architecture
CONTRACTOR: Bryan Construction
ARCHITECT: LOA Architecture
CONTRACTOR: Bryan Construction

COMMUNITY ENGAGEMENT PROCESS
Community Engagement
To ensure the school community is engaged in the project, the project manager (PM) will work directly with the school principal to discuss the identified renovations, meet with the architect, and coordinate the construction schedule. The principal will decide which school staff or parents might need to be involved with the design process depending on the scope of work. The project manager will share information with the entire school staff at key milestones through the design process.
UPDATES
September 2025
Construction is substantially complete and the project team is working with the contractor to finish final task list items and close out the project. Students and staff are enjoying the updated spaces and improvements! This and other construction work around BVSD could not be possible without the generous support from our voters and the entire BVSD community. We are extremely grateful for this support and are thrilled for the Escuela Bilingüe Pioneer community and its students!
Previous Updates
- August 2025
- July 2025
- June 2025
- May 2025
- April 2025
- February 2025
- January 2025
- November 2024
- September 2024
- May 2024
- April 2024
- February 2024
- November 2023
- September 2023
- January 2023
August 2025
August 2025
Welcome to the August Construction Update for Escuela Bilingüe Pioneer! We are extremely excited to report that the summer 2025 Bond construction project is now substantially complete. While there are a few final items being addressed during the month of August, the bulk of the work is now completed and the school is up and running as usual. As a reminder, here are some of the major items that were completed over the summer here at Escuela Bilingüe Pioneer ES:
- Replacement of HVAC system for the library (Due to delays with equipment, the library will be offline until September. Media specialists will host library lessons in other areas of the school in the meantime.)
- Repairs to areas of roof and roof components
- Upgrades to lighting in classrooms and corridors
- Extensive playground renovations, including new equipment and solid surface areas
- Addressing various ADA issues in select areas of the school
- Installed a lift to the 2nd floor, located in the atrium area
- Completed replacement of north playing field, including irrigation and new sod
- Re-paving of the staff parking lot on the north side of the school
- Miscellaneous site improvements around the school
Overall, the entire school site looks amazing, and we are thrilled about the work that has been completed. We are sincerely grateful for all of your patience as the school site was off-limits to the community during this important work. As always, this and other facility improvements around BVSD could not be possible without the support and generosity of the entire BVSD community and we sincerely thank you for your support. Have a great start to the 2025-26 school year!
July 2025
July 2025
Welcome to the July Construction Update for Escuela Bilingüe Pioneer! We have passed the halfway point for the summer construction project, with plenty of work to be completed before students return to school on August 13th. As with any project of this magnitude, there have been some unexpected challenges but nothing that has put the project schedule behind in an impactful way. With that being said, please see below for the tasks that are to be completed during the month of July:
- Installation of sod on the north field and begin watering/establishing phase
- Repaving and striping of north parking lots
- Ongoing installation of new playground equipment and playground surfacing
- Installation of new lift in the atrium
- Ongoing installation of light replacement
- Ongoing painting in select areas
- Begin installation of new roof top HVAC unit for the library
As a reminder the library will be temporarily closed for the first few weeks of the school year as we complete the HVAC work which will add centralized air conditioning to this space.
We are very excited about the work that has been done so far at Pioneer, and we believe you will be too! As always, we thank you for both your support in making this project possible as well as your patience as we work through the latter stages of this summer’s bond construction project and hope your summer break has been a good one!
June 2025
June 2025
Welcome to the June Construction Update for Escuela Bilingüe Pioneer! With school officially over for the year and students and staff off for a well-earned summer break, construction at Pioneer is well underway. While only select areas will be impacted by construction work inside the school, there is a lot of activity taking place around the campus. As such, the school building, along with the vast majority of the surrounding campus, are currently off limits to anyone besides construction related personnel. This will be the case for the duration of the summer. Below is an overview of construction activities planned for the month of June:
- Site improvements at the playing fields including, turf removal, grading, irrigation and sod installation
- Playground equipment additions (select areas), shade shelters, begin repairs to existing surfacing and installation of new surfacing
- Landscaping improvements in select areas of the campus
- Begin walkway and gymnasium stucco repairs
- Begin removal of parking lot surfacing and replacement
- Demo and replacement of exterior and interior lighting and skylights in gymnasium
- Demo and replacement of roof (select areas)
- Begin installation of ADA accessible lift in the atrium
May 2025
May 2025
We hope this message finds you and your student(s) well as we quickly approach the end of the school year! We are excited for the upcoming kick-off of construction for renovations coming to Escuela Bilingüe Pioneer this summer. These improvements are the result of the support from the entire BVSD community through passage of the 2022 BVSD Bond Referendum.
Our $3.5M project will begin immediately after Memorial Day weekend (with some site mobilization taking place in the days leading up to the end of school) and will be substantially complete by early August. Highlights of the project include:
- Repairs to areas of roof and roof components
- Upgrades to lighting to LED
- Replacement and addition of select playground equipment
- Improved playground surfacing
- Address various ADA issues
- Install lift to 2nd floor
- Improvements to the North play field
- Re-paving of the staff parking lot on the north side of the school
- Miscellaneous site improvements around the school
- Replacement of select HVAC Systems
April 2025
February 2025
January 2025
November 2024
September 2024
September 2024
- Last spring, the design team met several times with school leaders and staff members to gain a better understanding of the needs at the school. Design work continued over the summer. Highlights of the improvements being planned include providing second floor ADA access with a mechanical lift to be installed in the atrium, as well as renovations for all three playgrounds. The playground improvements aim to increase accessibility for students with mobility differences with large areas of rubberized solid surface material. In addition, some existing swings will be replaced with adaptive models. You can learn more about the design intent behind the playground renovations here.
- The design is proceeding on schedule and bidding will occur in November/December.
- Construction for Phase 2 projects will begin in the spring/summer of 2025.
May 2024
May 2024
The design team will meet with school leadership and some staff members this spring to get a better understanding of the school's needs. The design team will continue to develop project plans through the summer with construction bidding planned for late fall. Project announcements will be sent to neighbors this month.

April 2024
February 2024
November 2023
September 2023
January 2023
SCOPE OF WORK
BUILDING ENVELOPE
- Repair/replace deteriorating areas of roof and roof components
-
Repair/replace skylights as needed
BUILDING SYSTEMS
-
Upgrade deteriorated fluorescent lighting to LED
-
Replace deteriorated HVAC and electrical system components to avoid potential systems failures
-
Update obsolete HVAC controls
INFRASTRUCTURE/SITE
- Replace select playground equipment
SAFETY/CODE
-
Address various ADA issues
-
Install lift to 2nd floor to address accessibility