Aspen Creek PK-8
5500 Aspen Creek Drive Broomfield, CO 80020 | 720.561.8000
Original Construction Date | 2000
PROJECT TEAM
PROJECT MANAGER: Matt Johnson
ARCHITECT: BVH Architects
CONTRACTOR: Alliance Construction Solutions

UPDATES
August 2026
Welcome to the August Construction Update for Aspen Creek PK8! As we wrap up the final odds/ends of the summer Bond Project work for Aspen Creek, we hope that you are as excited with the changes as we are. A great deal of work took place over a very short period of time (approximately 10 weeks), and like all summer projects, required complex coordination and cooperation between many entities. Below are a few of the tasks being completed (or have been completed) as your students return to school here in August:
- Parking lots repaved and seal coated (including playground areas)
- Completed new flooring, stair treads in select areas throughout the school
- New dust collector
- New furniture being installed in a few select classrooms
- Painting and other finishes completed in select areas around the school
- Punch list items being addressed
As always, we cannot thank you enough for all of your patience during this past summer here at Aspen Creek. The 2022 BVSD Bond Project would not be possible without your generosity and we are grateful to be a part of a community that always steps up to support our students and the facilities that enhance their educational experience. We hope you and your student(s) have a wonderful start to the 2026 - 27 school year!
Previous Updates
- July 2026
- June 2026
- May 2026
- April 2026
- January 2026
- September 2025
- April 2025
- February 2025
- January 2025
- November 2024
- September 2024
- December 2023
- July 2023
- June 2023
July 2026
July 2026
Welcome to the July Construction Update for Aspen Creek PK8! We hope summer is in full swing for you and your family, as it certainly is from our side of the fence, with plenty of work ahead from now to August. With a good portion of the summer behind us, we are pleased to report that the Aspen Creek project is rolling along smoothly as we work toward substantial completion on Aug. 1 in time to welcome staff and students back to the building. We will be wrapping up final items outside of school hours, with final completion anticipated in early fall. Construction activity planned for the month of July is detailed below:
- Complete paving and striping of front parking lot
- Complete switch gear replacement in electrical room
- Finish all flooring and walls in wood shop along with installation of new dust collector system
- Replace large skylights in the second floor hallway
- Complete all painting and touch-up work in select areas of the school
There are exciting changes coming to Aspen Creek PK-8, and we sincerely appreciate your patience as we work through the end of this summer project. Note that the school, and parts of the grounds, are still an active construction site. Thus, for the safety of everyone, we ask that you avoid coming to the campus unless absolutely necessary. The Boulder Valley School District is extremely grateful for the support given to us by the voters, and we strive to be good stewards in providing the best academic environments possible to support our students. Go Coyotes!
June 2026
June 2026
Welcome to the June Construction Update for Aspen Creek K8! With school officially over for the year and students and staff off for a well-earned summer break, construction at Aspen Creek K-8 is well underway. To allow the contractor to make the most of the summer “down time” the school building, along with select spots around the campus, are off limits to anyone besides construction personnel. This will be the case for the duration of the summer. Below is an overview of the construction activities that will be taking place throughout the Aspen Creek campus during the month of June:
- Demo of existing flooring throughout the school (carpeted areas)
- Demo of switchgear and begin electrical upgrades (note: there will be no power on the site from 6/5 through 7/7 2026)
- Begin demo of main parking lot on the east side of the school
- Begin demo of CTE area (woodshop)
- Cement treatment of the subgrade of east parking lot
While the majority of the surrounding campus is accessible to the public, we ask that you and your students avoid coming to the school building itself unless specifically authorized to do so. We are very excited about the changes in store for Aspen Creek and sincerely appreciate your patience and support as we work our way through this busy summer of construction. We hope you are having a wonderful and relaxing start to your summer break!
May 2026
May 2026
Dear Aspen Creek PK8 School Parents and Staff,
We hope this has been a successful school year for you and your student(s)! The BVSD Bond team is excited to let you know construction will be starting soon for renovations provided by the Building for Student Success program. These improvements are coming to Aspen Creek PK8 School thanks to support from the entire BVSD community through passage of the 2022 Bond measure.
In addition to much-needed repair and upgrades to building systems and finishes, highlights of the improvements coming to Aspen Creek include:
- Concrete and paving repairs in the west parking lot and full replacement in the east parking lot
- Replacing large pyramidal skylights
- Repairing/replacing soffits
- Replacing the building electrical distribution equipment (switchgear)
- Replacing the emergency generator
- Interior finish improvements such as flooring, paint, and ceilings
- Renovations to expand opportunities for Career and Technical Education
The full scope of work can be found on the BVSD Building for Student Success website on the Aspen Creek PK8 School Project page.
Our $6.5 million project will begin after the students leave in May and is scheduled to be completed by the time students return in August.
Student and staff safety is our top priority at Aspen Creek PK8 School and in the Boulder Valley School District. During the summer months, there will be no access to the building and school grounds. For everyone’s safety, please comply with all posted signage and temporary barriers.
All workers who are authorized to be on-site will have numbered project stickers on their hard hats and will have background checks. Generally, there should be no reason for workers to interact with school staff or community members during this project.
We want to keep you informed as the project progresses. We will meet weekly with the architect(s) and construction company and will update you regularly about construction progress during the summer months. Project information, including monthly construction updates can be found on the Aspen Creek PK8 School project website. Specific questions should be directed to me, Matt Johnson at 720-561-6043 or matthew.johnson@bvsd.org.
As always, we are extremely grateful to BVSD taxpayers for this project and to you for your continued support of Aspen Creek PK8 School. We hope you share our excitement for the great changes happening here.
Sincerely,
Matt Johnson
BVSD Project Manager
-----------------------------------------------------------------------------------------------------------------------
May 2026
Project postcards were sent to neighbors this month.

April 2026
January 2026
September 2025
September 2025
The project teams are in the final stages of design for the Phase 3 projects. Construction documents will be issued in the fall and the contractor’s guaranteed maximum price (GMP) will go to the Board for approval in November. Construction is expected to kick off in May 2026 after the students leave for summer break.
April 2025
February 2025
January 2025
November 2024
September 2024
December 2023
July 2023
July 2023
The roof replacement project is approximately 90% complete. The new membrane roof is being installed over the worn-out, leaky roofs, reducing the amount of material that would have been sent to a landfill if the old roofs were removed. Bonus - some ballast material was removed from the old roofs and reused as a road base on another BVSD site. The project is on schedule to be complete by the end of July.
June 2023
June 2023
Thanks to the generous voters of Boulder Valley School District, Aspen Creek PK-8 will receive over $5.1M in building renovations. This work includes much-needed repair and maintenance, such as roof repair; replacing deteriorating components of the HVAC and plumbing systems; repairing damaged asphalt and concrete; and installing new flooring and paint among other important work. We are particularly excited about renovations that will allow us to offer our students more opportunities for Career and Technical Education (CTE) classes.
Much of this work is several years away. However, because of the urgency, roof repair is happening this summer. This work is currently underway and will continue through July.
DESIGN ADVISORY TEAM
Design Advisory Team
The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.
Members
Andrew Bilder, Parent
Jason Cole, Teacher
Driss Collaso, Teacher
Andrew Cook, Parent
Mandi Erichson, Office Manager
Brian Gonzales, Assistant Principal
Adrianna Huff, Parent
Amanda Jones, Assistant Principal
Rebecca Lavezzary, Parent
Anne Mechling, Teacher
Jen Plants, Teacher
Lori Retta, Teacher
Jessie Trezise, Head Custodian
Nick Vanderpol, Principal
SCOPE OF WORK
BUILDING ENVELOPE
- Repair/replace deteriorating areas of roof and roof components (completed in 2023)
- Apply water repellent sealant to exterior masonry
-
Re-caulk exterior masonry control joints
-
Repair/replace select skylights
BUILDING SYSTEMS
- Replace emergency generator
-
Replace deteriorating HVAC and plumbing systems components to avoid potential system failure
-
Update obsolete HVAC controls
-
Repair/replace elevator
INFRASTRUCTURE/SITE
-
Repair/replace parking lot and pedestrian pavement
-
Repair/replace exterior concrete
-
Address stormwater issues
SAFETY/CODE
-
Address various building code and ADA needs
-
Install safety railings
-
Update fire protection system
INTERIOR SPACE IMPROVEMENT
- Interior finish improvements such as flooring, paint, and ceilings
CAREER & TECHNICAL EDUCATION IMPROVEMENTS
The Aspen Creek PK-8 budget includes $455,000 to invest in creating learning environments to support career & technical education.
PROJECT PHOTOS