Aspen Creek PK-8
5500 Aspen Creek Drive Broomfield, CO 80020 | 720.561.8000
Original Construction Date | 2000
PROJECT TEAM
PROJECT MANAGER: Matt Johnson
ARCHITECT: BVH Architects
CONTRACTOR: Alliance Construction Solutions

UPDATES
April 2026
The Contractors are gearing up to start work on the building updates and improvements in our Critical Needs Plan. Construction for the Phase 3 projects will begin after the students leave in May for summer break.
Previous Updates
- January 2026
- September 2025
- April 2025
- February 2025
- January 2025
- November 2024
- September 2024
- December 2023
- July 2023
- June 2023
January 2026
September 2025
September 2025
The project teams are in the final stages of design for the Phase 3 projects. Construction documents will be issued in the fall and the contractor’s guaranteed maximum price (GMP) will go to the Board for approval in November. Construction is expected to kick off in May 2026 after the students leave for summer break.
April 2025
February 2025
January 2025
November 2024
September 2024
December 2023
July 2023
July 2023
The roof replacement project is approximately 90% complete. The new membrane roof is being installed over the worn-out, leaky roofs, reducing the amount of material that would have been sent to a landfill if the old roofs were removed. Bonus - some ballast material was removed from the old roofs and reused as a road base on another BVSD site. The project is on schedule to be complete by the end of July.
June 2023
June 2023
Thanks to the generous voters of Boulder Valley School District, Aspen Creek PK-8 will receive over $5.1M in building renovations. This work includes much-needed repair and maintenance, such as roof repair; replacing deteriorating components of the HVAC and plumbing systems; repairing damaged asphalt and concrete; and installing new flooring and paint among other important work. We are particularly excited about renovations that will allow us to offer our students more opportunities for Career and Technical Education (CTE) classes.
Much of this work is several years away. However, because of the urgency, roof repair is happening this summer. This work is currently underway and will continue through July.
DESIGN ADVISORY TEAM
Design Advisory Team
The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.
Members
Andrew Bilder, Parent
Jason Cole, Teacher
Driss Collaso, Teacher
Andrew Cook, Parent
Mandi Erichson, Office Manager
Brian Gonzales, Assistant Principal
Adrianna Huff, Parent
Amanda Jones, Assistant Principal
Rebecca Lavezzary, Parent
Anne Mechling, Teacher
Jen Plants, Teacher
Lori Retta, Teacher
Jessie Trezise, Head Custodian
Nick Vanderpol, Principal
SCOPE OF WORK
BUILDING ENVELOPE
- Repair/replace deteriorating areas of roof and roof components
- Apply water repellent sealant to exterior masonry
-
Re-caulk exterior masonry control joints
-
Repair/replace select skylights
BUILDING SYSTEMS
- Replace emergency generator
-
Replace deteriorating HVAC and plumbing systems components to avoid potential system failure
-
Update obsolete HVAC controls
-
Repair/replace elevator
INFRASTRUCTURE/SITE
-
Repair/replace parking lot and pedestrian pavement
-
Repair/replace exterior concrete
-
Address stormwater issues
SAFETY/CODE
-
Address various building code and ADA needs
-
Install safety railings
-
Update fire protection system
INTERIOR SPACE IMPROVEMENT
- Interior finish improvements such as flooring, paint, and ceilings
CAREER & TECHNICAL EDUCATION IMPROVEMENTS
The Aspen Creek PK-8 budget includes $455,000 to invest in creating learning environments to support career & technical education.
PROJECT PHOTOS