Kohl Elementary Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=42https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=42{28e838a4-8015-4177-ac17-2576b5d1e514}Kohl Elementary School1000 West 10th Avenue Broomfield, CO 80020https://sites.google.com/a/bvsd.org/kohl/720.561.8600Phase 21959<img alt="" src="/projects/Project%20Profile%20Images/KohlES-photo-300x300.JPG" style="BORDER:0px solid;" />$7,691,023$200,000 included in budget

Latest Updates

 

 

November 2, 2018https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=25https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=25{28e838a4-8015-4177-ac17-2576b5d1e514}November 2, 2018Activity in the building and on the grounds, with the exception of the Kindergarten addition, is winding down. The project team is still on track to have all items (except Kindergarten) finished by the end of Thanksgiving Break. The Nanawall (the movable wall between the Maker Space and the cafe) will be installed in the coming days. Project team members are working on creating the final list of items to be completed. Roof installation is underway on the Kindergarten addition. These new classrooms are still on target to be completed in December. https://docs.google.com/document/d/1K-i-301rv2yYBphAu2kPZH2MsueUWME0ejlQvbz3BcE/edit?usp=sharing, https://docs.google.com/document/d/1K-i-301rv2yYBphAu2kPZH2MsueUWME0ejlQvbz3BcE/edit?usp=sharing

​    

 

 

September 21, 2018https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=22https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=22{28e838a4-8015-4177-ac17-2576b5d1e514}September 21, 2018Construction crews have made progress in several areas of the school over the past couple of weeks. The secure entrance vestibule is finished, with the exception of the ADA automatic door opener which technicians anticipate finishing next week. Drywall, tile, and plumbing fixtures will be installed in the central restrooms over the next week with scheduled turnover to the school the first week of October. Landscape crews will begin preparing areas of the site for sod installation which will occur in the coming weeks. The permanent playground shade structure should be delivered next week. Concrete for the foundation for the kindergarten addition has been poured with steel erection to begin shortly. The addition is scheduled to be finished by the end of December. Furniture has been installed in the new makerspace, and it is ready for student use. A glass wall with sliding doors out to the cafeteria will be installed in the space in December.
August 24, 2018https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=20https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=20{28e838a4-8015-4177-ac17-2576b5d1e514}August 24, 2018With the return of staff and students, construction work inside the school has shifted to evenings and weekends. Work is continuing on the interior restrooms with foundations in place and plumbing roughed-in. The intermediate playground and ball court have been the completed. All play areas are now open to students, although there is still some construction fencing around areas where the landscaping needs to be repaired. Staff and students are enjoying the new air conditioning(!), and the technicians continue to work to get the settings dialed in and functioning properly. The new makerspace next to the cafeteria is almost ready for students. Workers continue to address miscellaneous items in various areas around the school. We are deeply grateful for all the additional time and effort put in by Kohl teachers, staff, and volunteers to start the year.
September 10, 2018https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=21https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=21{28e838a4-8015-4177-ac17-2576b5d1e514}September 10, 2018Construction of the kindergarten addition and central restrooms continues. The contractor is working to address maintenance issues with the temporary restrooms as they arise. Wiring installation at the front entrance is wrapping up, which will complete construction of the secure entry vestibule. A security guard is stationed at the front entrance to assist with identifying visitors until the Aiphone is fully functional. Furniture will be installed in the new makerspace in the coming days, and the room will soon be ready for students. Thank you for your support and ongoing patience and understanding.
June 2018https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=17https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}June 2018Himmelman Construction has been busily mobilizing at Kohl Elementary to begin the summer renovation work. Workers have started the exterior work on the roof and playgrounds with the kindergarten addition starting this month. The interior work will start with restroom renovations and classroom remodeling to include upgraded HVAC system, windows, and casework. Renovations in the cafeteria include adding moveable glass walls and adjustable furniture that will allow the room to be used in a variety of ways. Just as a reminder, the school and school grounds will be closed for the summer. In addition, the office has been temporarily relocated to Broomfield Heights Middle school until August. The interior and exterior renovations will be substantially complete by the start of school with work on the Kindergarten addition continuing into the fall.
October 5, 2018https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=23https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}October 5, 2018The temporary restrooms are gone! This week the project reached an eagerly anticipated milestone with the completion of the central restroom! Other accomplishments include a fully functional secure entrance vestibule, including repairs to the ADA compliant door, new basketball hoops and tetherball pole, and sod installation around the site. The preschool playground shade structure is on site and ready for installation, with the footings in the process of being poured. The final pieces of cafeteria furniture--fun new booths--were installed. The project team is making progress on the “punch list” of final items to be completed throughout the building. On the kindergarten addition, the foundation is finished, and we will soon see the structure come out of the ground. The framing process is beginning next week, weather permitting. The addition is still on target to be completed in December.
October 22, 2018https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=24https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=24{28e838a4-8015-4177-ac17-2576b5d1e514}October 22, 2018Construction crews continue to make steady progress toward completing final items in and around the school and on the kindergarten addition. We anticipate all items, exclusive of the kindergarten addition, will be finished by the end of Thanksgiving Break. This includes installation of new marker boards in classrooms. The final touches will be put on the Maker Space at the beginning of November with the installation of the Nanawall, the movable wall between that space and the cafe. Hardware and software have also been purchased for the digital kiosk in the vestibule at the front entrance. The storage container on the south side of the west wing was moved to the location of the other containers late last week. Window wall assemblies will be stored in these containers until they are installed next summer. The preschool shade structure has been installed and will be ready for student use on Monday (10/22). On the Kindergarten addition, the steel structure and roof are in place and the concrete slab will be poured soon. Crews are working on exterior stud framing. The addition is still on target to be completed in December.
August 2018https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=19https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}August 2018The construction crews have made tremendous progress and accomplished a significant amount of work over the summer. The building will be ready for students on Aug. 15. Although construction will be substantially complete in most areas of the school, there will still be ongoing construction in the kindergarten addition (as planned) and the central, multi-user restroom. Temporary restroom facilities will be set up in a fenced location outside the school. Student trips to the facility will be supervised by a para-educator. The restroom renovations are expected to be complete by the end of September. The kindergarten addition is on the northeast corner of the building and will be inside a construction zone. New windows will be installed in the west wing over breaks during the school year. In addition to the work mentioned above, there will be construction workers addressing minor work items throughout the building. All work will occur outside of school hours. Areas under construction will be separated from the rest of the school with barriers and warning signs. We will do all we can to minimize the impact to the school from construction activity.
July 2018https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=18https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}July 2018Himmelman Construction continues to make progress on the renovation work at Kohl. Work outside the building during June included demolition and site work on the playgrounds, roofing, and excavation of foundational trenches for the new kindergarten addition. The interior work entailed removal of existing unit ventilators, demolition of areas to be renovated, installation of electrical rough-ins, and completion of the asbestos abatement work. During July, Himmelman will be working to complete the roof repair, installing new unit ventilators and windows, renovating the preschool area, reconfiguring the new main entry vestibule, converting the computer lab into a makerspace and installing new casework (cabinets) throughout the building. The renovation work is on schedule to be substantially complete for the start of school in August. Construction of the kindergarten addition will continue into the fall.
September 2017https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=10https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}September 2017Design work for this project will begin in September. Follow the DAT link for information about the Design Advisory Team as well as meeting schedules and minutes. https://bond.bvsd.org/projects/kohl/Pages/default.aspx#dat, http://bond.bvsd.org/projects/kohl/Pages/default.aspx#dat
Project Kick-off Postcard to Neighborshttps://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=11https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}Project Kick-off Postcard to Neighborshttps://bond.bvsd.org/projects/kohl/Documents/Kohl%20neighbor%20notification%20postcard%20web.pdf, http://bond.bvsd.org/projects/kohl/Documents/Kohl%20neighbor%20notification%20postcard%20web.pdf
Project Kick-off Letter to Parentshttps://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=12https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}Project Kick-off Letter to Parentshttps://bond.bvsd.org/projects/kohl/Documents/Kohl%20Parent%20DAT%20Kick%20Off%20Letter.pdf, http://bond.bvsd.org/projects/kohl/Documents/Kohl%20Parent%20DAT%20Kick%20Off%20Letter.pdf
October 2017https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=13https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}October 2017The project team is working with the Design Advisory Team (DAT) on schematic design. Follow the DAT link above for meeting schedule and minutes.
December 2017https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=14https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}December 2017The project team is working on design development. Follow the DAT link above for meeting schedule and minutes. ​
January 2018https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=15https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=15{28e838a4-8015-4177-ac17-2576b5d1e514}January 2018The project team is working on construction documents and preparing for bidding in February. Construction is anticipated to begin in April.
March 2018https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=16https://bond.bvsd.org/projects/kohl/Lists/Latest Updates/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}March 2018The project will bid this month with construction anticipated to begin in April.

Project Details

Project Team
Project Manager

 

 

Doug Hagenhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}Doug Hagendoug.hagen@bvsd.org720-561-5952mailto:doug.hagen@bvsd.org, mailto:doug.hagen@bvsd.org

Architect

 

 

Hord Coplan Machthttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=20{28e838a4-8015-4177-ac17-2576b5d1e514}Hord Coplan Machthttp://www.slaterpaull.com/, http://www.slaterpaull.com/

Contractor

 

 

Himmelman Constructionhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=47{28e838a4-8015-4177-ac17-2576b5d1e514}Himmelman Construction

Related Resources

 

 

Educational Facilities Master Planhttps://bond.bvsd.org/projects/kohl/Lists/Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/kohl/Lists/Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttps://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=55, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=55page

Details
Project Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=42https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=42{28e838a4-8015-4177-ac17-2576b5d1e514}$7,691,023

Innovation Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=42https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=42{28e838a4-8015-4177-ac17-2576b5d1e514}$200,000 included in budget

Bond Expenditures

 

 

Kohl Elementary Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=42https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=42{28e838a4-8015-4177-ac17-2576b5d1e514}Kohl Elementary Schoolhttps://bond.bvsd.org/financial/Documents/CurrentProgramExpenditures.pdf, Bond Program Expenditures

Project Expenditures

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=42https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=42{28e838a4-8015-4177-ac17-2576b5d1e514}https://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=42https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=42{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Energy Efficiency/Green Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=42https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=42{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Educational Innovation Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=42https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=42{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClassF570DCC2576F4081B77E66DB3BFF37A6"><p>The Kohl Elementary School Innovation project will expand the use of the cafeteria and computer lab by adding moveable glass walls and adjustable furniture that will allow for flexible use of the spaces. In addition, the library will be reorganized to create an inquiry space.<br></p><a href="/educational-innovation/Pages/Kohl-Elementary-Innovation-Project.aspx"><p><strong>Learn more</strong></p></a><p><br></p></div>

Design Advisory Team

​The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.

Staff 
Mike Lowe, Principal
Jacqueline Howard
Therese Luftkus
Adele Bravo
Parents

Valeri Baye

  
​​Community​
Related Resources

 

 

Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/kohl/Lists/DAT Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/kohl/Lists/DAT Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf, http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdfpage

DAT Meeting Schedule

DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting. ​​

 

 

September 11 | 3 - 5 p.m.https://bond.bvsd.org/projects/kohl/Lists/DAT Meetings List/DispForm.aspx?ID=1https://bond.bvsd.org/projects/kohl/Lists/DAT Meetings List/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}September 11 | 3 - 5 p.m.https://bond.bvsd.org/projects/kohl/DATMeetingDocs/DAT%201%20meeting%20minutes.pdf, /projects/kohl/DATMeetingDocs/DAT%201%20meeting%20minutes.pdf
October 2 | 3 - 5 p.m.https://bond.bvsd.org/projects/kohl/Lists/DAT Meetings List/DispForm.aspx?ID=2https://bond.bvsd.org/projects/kohl/Lists/DAT Meetings List/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}October 2 | 3 - 5 p.m.https://bond.bvsd.org/projects/kohl/DATMeetingDocs/DAT%202%20meeting%20minutes.pdf, http://bond.bvsd.org/projects/kohl/DATMeetingDocs/DAT%202%20meeting%20minutes.pdf
October 16 | 3 - 5 p.m.https://bond.bvsd.org/projects/kohl/Lists/DAT Meetings List/DispForm.aspx?ID=3https://bond.bvsd.org/projects/kohl/Lists/DAT Meetings List/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}October 16 | 3 - 5 p.m.https://bond.bvsd.org/projects/kohl/DATMeetingDocs/DAT%203%20meeting%20minutes.pdf, http://bond.bvsd.org/projects/kohl/DATMeetingDocs/DAT%203%20meeting%20minutes.pdf
November 6 | 3-5 p.m.https://bond.bvsd.org/projects/kohl/Lists/DAT Meetings List/DispForm.aspx?ID=4https://bond.bvsd.org/projects/kohl/Lists/DAT Meetings List/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}November 6 | 3-5 p.m.

Timeline

 

 

Constructionhttps://bond.bvsd.org/projects/kohl/Lists/Project Timeline/DispForm.aspx?ID=3https://bond.bvsd.org/projects/kohl/Lists/Project Timeline/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}ConstructionApril - October 2018In Progresssuccess
Construction Bid Openinghttps://bond.bvsd.org/projects/kohl/Lists/Project Timeline/DispForm.aspx?ID=2https://bond.bvsd.org/projects/kohl/Lists/Project Timeline/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Bid OpeningFebruary 2018Completewarning
Construction Documentshttps://bond.bvsd.org/projects/kohl/Lists/Project Timeline/DispForm.aspx?ID=1https://bond.bvsd.org/projects/kohl/Lists/Project Timeline/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}Construction DocumentsJanuary 2018Completeinfo

Images

    There are no items to show in this view of the "Construction Images" list.

    Scope of Work

    Facility Condition

    • Exterior building improvements such as repair/replace windows and doors, clean and paint
    • Repair/replace roof
    • Restroom renovations including staff facilities
    • Replace interior doors
    • Improvements to interior finishes such as carpet, flooring, ceiling tile, paint and white boards
    • Intercom system improvements
    • Electrical system upgrades including emergency generator
    • Repair/replace fixtures such as casework
    • Site improvements such as paving, irrigation, and fencing
    • Audio enhancement in every classroom

    Program Compatibility 

    • Provide adequate space for full-day kindergarten
    • Provide adequate space for preschool
    • Provide adequate Special Education space

    Health and Physical Development

    • Provide preschool playground
    • Upgrade playground equipment and surface material

    Safety and Security

    • Redesign main entry to provide more control over visitor access
    • Install electronic security controls
    • Install security partitions
    • Install camera/intercom security system
    • Upgrade parking lighting

    Sustainability

    • Conduct retro-commissioning and repairs
    • Upgrade HVAC controls
    • Upgrade lighting

    Innovation

    Kohl Elementary School is eligible to receive up to $200,000 in additional funds to implement facility improvements that support innovative teaching methods