University Hill Elementary Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=17https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}University Hill Elementary School956 16th Street Boulder, CO 80302http://schools.bvsd.org/p12/unihill720.561.5416Phase 11905 (Intermediate)<img alt="" src="/projects/Project%20Profile%20Images/UniHillES-photo-300x300.JPG" style="BORDER:0px solid;" />$11,177,926$200,000 included in budget

Latest Updates

 

 

May 2019https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=26https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=26{28e838a4-8015-4177-ac17-2576b5d1e514}May 2019The project team has met with the DAT twice and held a focus group meeting. The team is working to incorporate input from the DAT into the design and acquire updated construction cost estimates. Construction is anticipated next year.
DAT Restart Postcard for Neighborshttps://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=25https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=25{28e838a4-8015-4177-ac17-2576b5d1e514}DAT Restart Postcard for Neighborshttps://bond.bvsd.org/projects/University-Hill/Documents/Uni%20Hill%20Neighbor%20DAT%20Restart%20Notification%20Postcard%20web.pdf, https://bond.bvsd.org/projects/University-Hill/Documents/Uni%20Hill%20Neighbor%20DAT%20Restart%20Notification%20Postcard%20web.pdf

 

 

Conversación del Consejo de Educación acerca del bonohttps://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=20https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=20{28e838a4-8015-4177-ac17-2576b5d1e514}Conversación del Consejo de Educación acerca del bonohttps://docs.google.com/document/d/1Lh9n2N2jdHgFP7JDOeCNWHgwsNebeH_jX5w_ewnfExg/edit?usp=sharing, https://docs.google.com/document/d/1Lh9n2N2jdHgFP7JDOeCNWHgwsNebeH_jX5w_ewnfExg/edit?usp=sharing
April 2019https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=24https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=24{28e838a4-8015-4177-ac17-2576b5d1e514}April 2019 At its February 26 work session, the BVSD board of education indicated its support for expanding the project scope of work to include a two-story addition that will enlarge the cafeteria (second floor) and provide additional learning space and offices (ground floor). In addition, the project will include much-needed repair and maintenance to building systems and finishes, playground improvements, energy efficiency upgrades, security improvements, and renovations to support 21st Century learning. When the project was put on hold in 2016, the design was approximately 90% complete. This spring, the design advisory team (DAT) will meet with the project architects and BVSD bond staff to review the existing design plans and provide input regarding the expanded scope. DAT meetings will be held on April 10 and May 7 at 3 p.m. Drawing upon the DAT input and additional cost estimating, staff will make a request to the Citizens’ Bond Oversight Committee to take action on additional funding. Construction is anticipated to begin next spring/summer and be substantially complete by August 2021.https://docs.google.com/document/d/1tKkbx2UYwTGJKbTuKBS_oaH3Ivbc4HtgsRxmnOxp6LQ/edit?usp=sharing, https://docs.google.com/document/d/1tKkbx2UYwTGJKbTuKBS_oaH3Ivbc4HtgsRxmnOxp6LQ/edit?usp=sharing
January 2019https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=23https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}January 2019The DAT will reconvene Jan. 22 at 3:30 p.m. to discuss the pros and cons of the design options. A board work session is scheduled for Feb. 12 at 6 p.m. to discuss priorities for spending Bond premium which is a possible funding source for the project.
Board of Education Bond Discussionhttps://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=21https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=21{28e838a4-8015-4177-ac17-2576b5d1e514}Board of Education Bond Discussionhttps://docs.google.com/document/d/1goQFC0WpkcePXxcZjBZrqCkSH5d7kPmMKTQjCmNirbU/edit?usp=sharing, https://docs.google.com/document/d/1goQFC0WpkcePXxcZjBZrqCkSH5d7kPmMKTQjCmNirbU/edit?usp=sharing
October 2018https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=22https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=22{28e838a4-8015-4177-ac17-2576b5d1e514}October 2018The project is on hold until the district can identify additional funding to expand the scope of work to include either a two-story classroom addition on the intermediate building or a cafeteria addition. If additional funding cannot be secured, the project will move forward with the current scope of work.
BVSD/CU Partnership Update | October 2016 (Letter to Parents)https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=10https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}BVSD/CU Partnership Update | October 2016 (Letter to Parents)https://bond.bvsd.org/projects/University-Hill/Documents/BVSD%20-%20CU%20Partnership%20October%20Update.pdf, http://bond.bvsd.org/projects/University-Hill/Documents/BVSD%20-%20CU%20Partnership%20October%20Update.pdf
Últimas noticias del trabajo en colaboración del BVSD y CU en octubre de 2016https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=11https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}Últimas noticias del trabajo en colaboración del BVSD y CU en octubre de 2016https://bond.bvsd.org/projects/University-Hill/Documents/BVSD%20-%20CU%20Partnership%20October%20Update%20-%20SPANISH.pdf, http://bond.bvsd.org/projects/University-Hill/Documents/BVSD%20-%20CU%20Partnership%20October%20Update%20-%20SPANISH.pdf
February 2017https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=12https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}February 2017Boulder Valley School District has decided not to sell the 1905 University Hill building. Staff will move forward with implementing the work in the master plan and identifying supplementary funding to support construction of an addition to the school to house early childhood education and a larger cafeteria. Construction is anticipated to begin in 2018 and occur over two years (2018 - 2019).
New Vista/University Hill Feasibility Studyhttps://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=13https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}New Vista/University Hill Feasibility Studyhttps://bond.bvsd.org/projects/University-Hill/Documents/New%20Vista%20Feasibility%20Study%20Full%20Set%202017%2001%2016%20FINAL%20DRAFT%20Reduced.pdf, http://bond.bvsd.org/projects/University-Hill/Documents/New%20Vista%20Feasibility%20Study%20Full%20Set%202017%2001%2016%20FINAL%20DRAFT%20Reduced.pdf
Últimas noticias sobre la planificación de las instalaciones de University Hill y New Vista, 1 de marzo de 2017https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=14https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}Últimas noticias sobre la planificación de las instalaciones de University Hill y New Vista, 1 de marzo de 2017https://bond.bvsd.org/projects/University-Hill/Documents/Uni%20Hill%20New%20Vista%20Facilities%20Update%20to%20Staff%20Parents%20-%20March%201,,%202017%20SPANISH.pdf, http://bond.bvsd.org/projects/University-Hill/Documents/BVSD%20-%20CU%20Partnership%20October%20Update%20-%20SPANISH.pdf
Universtiy Hill/New Vista Facility Planning Update | March 1, 2017 (Letter to staff and parents)https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=15https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=15{28e838a4-8015-4177-ac17-2576b5d1e514}Universtiy Hill/New Vista Facility Planning Update | March 1, 2017 (Letter to staff and parents)https://bond.bvsd.org/projects/University-Hill/Documents/Uni%20Hill%20New%20Vista%20Facilities%20Update%20to%20Staff%20Parents%20-%20March%201,,%202017.pdf, http://bond.bvsd.org/projects/University-Hill/Documents/Uni%20Hill%20New%20Vista%20Facilities%20Update%20to%20Staff%20Parents%20-%20March%201,%202017.pdf
October 2017https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=16https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}October 2017Staff is moving forward with implementing the work in the master plan and working to identify supplementary funding to support the construction of an addition to the school to house early childhood education and a larger cafeteria. Construction is anticipated to begin in 2018 and occur over two years (2018 - 2019). ​​​​​
December 2017https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=17https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}December 2017The renovation project is moving forward and is on track to begin construction of the work in the master plan next summer (2018). Whether a classroom addition will be included in the project has not been determined. The project team is evaluating construction cost estimates received this fall and will provide more information about the construction timeline in the spring.
March 2018https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=18https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}March 2018Since last spring, district staff have been working with the project team to get cost estimates for a possible addition to the intermediate building which would replace the primary building. The Board of Education is supportive of expanding the scope of work for this purpose provided the funding can be found. To allow more time to identify additional funding, construction of the original scope of work will be put on hold until next year.
Update Letter to University Hill Families and Staff | February 2018https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=19https://bond.bvsd.org/projects/University-Hill/Lists/Latest Updates/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}Update Letter to University Hill Families and Staff | February 2018https://docs.google.com/document/d/1olBqcVVetfg2pmLP54rMq1ApsawCM4Y9vE4cz_IYmhs/edit?usp=sharing, https://docs.google.com/document/d/1olBqcVVetfg2pmLP54rMq1ApsawCM4Y9vE4cz_IYmhs/edit?usp=sharing

Project Details

Project Team
Project Manager

 

 

Gene Temansonhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=55{28e838a4-8015-4177-ac17-2576b5d1e514}Gene Temanson

Architect

 

 

Larson Incittihttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=30{28e838a4-8015-4177-ac17-2576b5d1e514}Larson Incittihttp://www.li-architects.com/, http://www.li-architects.com/

Contractor

 

 

Related Resources

 

 

Educational Facilities Master Planhttps://bond.bvsd.org/projects/University-Hill/Lists/Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/University-Hill/Lists/Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttps://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=77, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=77page

Details
Project Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=17https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}$11,177,926

Innovation Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=17https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}$200,000 included in budget

Bond Expenditures

 

 

University Hill Elementary Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=17https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}University Hill Elementary Schoolhttps://bond.bvsd.org/financial/Documents/CurrentProgramExpenditures.pdf, Bond Program Expenditures

Project Expenditures

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=17https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}https://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=17https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Energy Efficiency/Green Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=17https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Educational Innovation Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=17https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Design Advisory Team

​The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.​

Staff
Ina Rodriguez-Meyer, Principal
Sarah Chesnutt (also a parent)
Celeste Landry
Queta Martinez
Mary Powell
Steve Kless, Media Center/Library
Marina Orozco
Martha Anderson (also a parent)
Parents
Kerry White
Eileen Krenzel Rojas
Steve Kelton
 
Related Resources

 

 

Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/University-Hill/Lists/DAT Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/University-Hill/Lists/DAT Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf, http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdfpage

DAT Meeting Schedule

DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting. ​​

 

 

Focus Group Meeting | May 6, 2019https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=11https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}Focus Group Meeting | May 6, 2019https://bond.bvsd.org/projects/University-Hill/DATMeetingDocs/050619%20UHES%20Meeting%20Minutes%20-Focus%20Groups%20web.pdf, https://bond.bvsd.org/projects/University-Hill/DATMeetingDocs/050619%20UHES%20Meeting%20Minutes%20-Focus%20Groups%20web.pdf
May 7, 2019 | 3-5 p.m. https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=10https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}May 7, 2019 | 3-5 p.m.
April 10, 2019 | 3-5 p.m.https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=9https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}April 10, 2019 | 3-5 p.m.https://bond.bvsd.org/projects/University-Hill/DATMeetingDocs/041019%20UHES%20DAT%201%20Meeting%20Minutes%20web.pdf, https://bond.bvsd.org/projects/University-Hill/DATMeetingDocs/041019%20UHES%20DAT%201%20Meeting%20Minutes%20web.pdf
January 22, 2019 | 3:30 - 5 p.m.https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=8https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}January 22, 2019 | 3:30 - 5 p.m.
Jan. 26, 2016https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=7https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}Jan. 26, 2016https://bond.bvsd.org/projects/University-Hill/DATMeetingDocs/012616%20Meeting%20Minutes%20for%20Publication-DAT%20Meeting%207.pdf, http://bond.bvsd.org/projects/University-Hill/DATMeetingDocs/012616%20Meeting%20Minutes%20for%20Publication-DAT%20Meeting%207.pdf
DEC. 2, 2015https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=6https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}DEC. 2, 2015https://bond.bvsd.org/projects/University-Hill/DATMeetingDocs/120215%20Meeting%20Minutes%20DAT%20Mtg%206.pdf, http://bond.bvsd.org/projects/University-Hill/DATMeetingDocs/2015-1112-UniHillDAT5Minutes.pdf
NOV. 12, 2015https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=5https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}NOV. 12, 2015https://bond.bvsd.org/projects/University-Hill/DATMeetingDocs/2015-1112-UniHillDAT5Minutes.pdf, http://bond.bvsd.org/projects/University-Hill/DATMeetingDocs/2015-1112-UniHillDAT5Minutes.pdf
OCT. 28, 2015https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=4https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}OCT. 28, 2015https://bond.bvsd.org/projects/University-Hill/DATMeetingDocs/2015-1028-UniHillDAT4Minutes.pdf, http://bond.bvsd.org/projects/University-Hill/DATMeetingDocs/2015-1028-UniHillDAT4Minutes.pdf
OCT. 13, 2015https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=3https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}OCT. 13, 2015https://bond.bvsd.org/projects/University-Hill/DATMeetingDocs/2015-1013-UniHillDAT3Minutes.pdf, http://bond.bvsd.org/projects/University-Hill/DATMeetingDocs/2015-1013-UniHillDAT3Minutes.pdf
SEPT. 8, 2015https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=2https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}SEPT. 8, 2015https://bond.bvsd.org/projects/University-Hill/DATMeetingDocs/2015-0908-UniHillDAT2Minutes.pdf, http://bond.bvsd.org/projects/University-Hill/DATMeetingDocs/2015-0908-UniHillDAT2Minutes.pdf
JUNE 1, 2015https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=1https://bond.bvsd.org/projects/University-Hill/Lists/DAT Meetings List/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}JUNE 1, 2015https://bond.bvsd.org/projects/University-Hill/DATMeetingDocs/2015-0601UniHillDAT1Minutes.pdf, http://bond.bvsd.org/projects/University-Hill/DATMeetingDocs/2015-0601UniHillDAT1Minutes.pdf

Timeline

​​A timeline will be developed during the design phase.

 

 

Images

​​    Check back here for photos of the project!
    There are no items to show in this view of the "Construction Images" list.

    Scope of Work

    Facility Condition

    • Exterior building improvements such as repair/replace windows and doors, clean masonry and paint
    • Replace roof
    • Replace interior doors
    • Improvements to interior finishes such as carpet, flooring, ceiling tile, and paint
    • Restroom renovations
    • Asbestos abatement
    • Communication system improvements
    • Plumbing improvements
    • HVAC system improvements
    • Fire protection system improvements
    • Electrical system upgrades
    • Repair/replace fixtures and equipment such as casework and gym equipment
    • Site improvements such as paving and fencing
    • Install building-wide air conditioning in intermediate bldg.
    • Audio enhancement in every classroom

    Program Compatibility Assessment

    • Provide additional storage
    • Provide adequate space for full-day kindergarten
    • Provide adequate space for preschool

    Health and Physical Development

    •  Upgrade playground equipment and surface material

    Safety and Security

    • Redesign main entry to provide more control over visitor access
    • Install camera/intercom security system
    • Install security partitions
    Sustainability
    • Conduct retro-commissioning and repairs
    • Upgrade lighting
    Innovation

    • University Hill Elementary School is eligible to receive up to $200,000 in additional funds to implement facility improvements that support innovative teaching methods.