Platt Middle Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=56https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=56{28e838a4-8015-4177-ac17-2576b5d1e514}Platt Middle School6096 Baseline Road Boulder, CO 80303http://npm.bvsd.org720.561.5536Phase 21958<img alt="" src="/projects/Project%20Profile%20Images/PlattMS-photo-300x300.JPG" style="BORDER:0px solid;" />$16,880,131$400,000 included in budget

Latest Updates

 

 

June 2018https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=39https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=39{28e838a4-8015-4177-ac17-2576b5d1e514}June 2018The month of June will see an extensive amount of construction work around the entire facility here at Platt Middle School. Most areas of the school have currently been moved to the large gym for storage. Very few areas will be left untouched, at least on some level, and as such the school will be closed to all staff throughout the summer. Follow the link for more information.https://docs.google.com/document/d/1BCSxjbSPJm6HAKXvF8tDMwRXbci20CO3AWWU4i08kmM/edit?usp=sharing, https://docs.google.com/document/d/1BCSxjbSPJm6HAKXvF8tDMwRXbci20CO3AWWU4i08kmM/edit?usp=sharing
Progress Report from Turner Constructionhttps://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=34https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=34{28e838a4-8015-4177-ac17-2576b5d1e514}Progress Report from Turner Constructionhttps://bond.bvsd.org/projects/Platt/Documents/Progress%20Report%202018.04.10.pdf, http://bond.bvsd.org/projects/Platt/Documents/Progress%20Report%202018.04.20.pdf
Construction Kick-off Postcard to Neighborshttps://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=23https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Postcard to Neighborshttps://bond.bvsd.org/projects/Platt/Documents/Platt%20construction%20start%20notification%20postcard%20text%20-%20neighbor%20WEB.pdf, http://bond.bvsd.org/projects/Platt/Documents/Platt%20construction%20start%20notification%20postcard%20text%20-%20neighbor%20WEB.pdf
Construction Kick-off Letter to Parentshttps://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=22https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=22{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Letter to Parentshttps://docs.google.com/document/d/1o0H2nOg89It3rVA6_vkoK8cd5UjWHCddhbbloYb1hn0/edit?usp=sharing, https://docs.google.com/document/d/1o0H2nOg89It3rVA6_vkoK8cd5UjWHCddhbbloYb1hn0/edit?usp=sharing



 

 

Semanas del 17 al 31 de mayo de 2018https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=38https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=38{28e838a4-8015-4177-ac17-2576b5d1e514}Semanas del 17 al 31 de mayo de 2018Durante las últimas dos semanas de mayo se verá mucha actividad “redoblada” relacionada con la construcción aquí en Platt. Con un horario extremadamente apretado este verano, todos los días son valiosos así que verán a más personas en el lugar a partir de esta semana. En el nuevo gimnasio auxiliar, se instalará acero comenzando con la instalación del techo que está programado para fines de mayo. También se verterá el concreto en el nuevo entresuelo. En el interior, las nuevas luces se han instalado en los pasillos y se está preparando el auditorio para nueva iluminación y trabajo eléctrico. En los próximos días también comenzará el trabajo de demolición en la biblioteca y en la cafetería. Finalmente, el trabajo en los baños comenzará una vez que el ciclo escolar termine. Tengan en cuenta que todo el sitio de Platt está fuera del alcance de los estudiantes y del personal a partir del 25 de mayo. Las actividades de las Escuelas Comunitarias en los campos del sur todavía se llevarán a cabo, pero sepan que el estacionamiento será extremadamente limitado alrededor del sitio a partir del 25 de mayo. Como siempre, gracias por su apoyo y les deseamos a todos un verano maravilloso y relajante. ¡Arriba los lobos!https://docs.google.com/document/d/1Ov8DE57lr7WhJY_xxo3IcrLQw2w9SMoeDs2U7jhpR08/edit?usp=sharing, https://docs.google.com/document/d/1Ov8DE57lr7WhJY_xxo3IcrLQw2w9SMoeDs2U7jhpR08/edit?usp=sharing
Semanas del 8 - 21 de febrero de 2018https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=25https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=25{28e838a4-8015-4177-ac17-2576b5d1e514}Semanas del 8 - 21 de febrero de 2018¡Bienvenidos a la primera (de muchas) comunicaciones sobre la construcción de la Escuela Intermedia Platt! Esta comunicación les llegará aproximadamente cada dos semanas para mantenerlos al tanto de lo que está sucediendo, en lo que respecta a la construcción, a lo largo del proyecto. El horario de construcción será de 7:00 a 3:30, con un turno de noche a partir de las 4:00 p.m. a las 2:30 a.m. (de lunes a jueves) durante el resto del año escolar. Estas horas se ajustarán durante el verano, pero basta con decir que habrá mucha actividad por aquí en los próximos meses. Actualmente, nuestro contratista general, Turner Construction, ha organizado su área de construcción en el lado suroeste de la escuela (en las antiguas canchas de baloncesto) y ha colocado letreros en todo el sitio. El trabajo preliminar en el nuevo gimnasio auxiliar ha comenzado, con la demolición de concreto y asfalto. La ingeniería de tierra y el muestreo de suelos también se están llevando a cabo. Dentro de la escuela, ha comenzado el trabajo en el espacio debajo del gimnasio con la instalación de un desagüe. El equipo nocturno realizará trabajos de exploración en toda la escuela con respecto a las ubicaciones de tuberías para el nuevo sistema de calefacción, ventilación y aire acondicionado (HVAC). Como siempre, el bienestar y seguridad de los estudiantes y del personal son de suma importancia. Con esto en mente, vean la sección “Lo que necesita saber” a continuación para detalles específicos sobre lo que afectará a usted y a su estudiante aquí en la escuela intermedia Platt. Estamos muy contentos con los nuevos cambios por toda nuestra escuela y apreciamos el apoyo de nuestra comunidad… ¡Arriba los Lobos! https://docs.google.com/document/d/1CL1MOD373Hqzazx_n3pFXtL66JlBYFdIDQ8L3Ok1Z60/edit?usp=sharing_eil&ts=5a81df3f, https://docs.google.com/document/d/1CL1MOD373Hqzazx_n3pFXtL66JlBYFdIDQ8L3Ok1Z60/edit?usp=sharing_eil&ts=5a81df3f
Semanas del 21 de febrero - 7 de marzo de 2018https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=28https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=28{28e838a4-8015-4177-ac17-2576b5d1e514}Semanas del 21 de febrero - 7 de marzo de 2018Las obras han empezado de verdad en Platt Middle: Turner Construction ha comenzado a preparar la tierra para la nueva ampliación del gimnasio. Han finalizado las perforaciones para los pilares y zapatas y empezado la excavación para los cimientos. Dentro y alrededor del lugar dedicado al nuevo gimnasio auxiliar hay también unas pocas tareas menores en marcha. Les iremos informando sobre el progreso de estas. En el interior, el estudio de las rutas de tuberías está a punto de terminar y la instalación empezará lo antes posible. En general, el proyecto ha empezado con energía y estamos contentos con el nivel de actividad durante la mañana y la tarde. https://docs.google.com/document/d/1qlr4gGq9f8xwUmKr8UKVk7Gm671aplEj30dd5UNdLbY/edit?usp=sharing, https://docs.google.com/document/d/1qlr4gGq9f8xwUmKr8UKVk7Gm671aplEj30dd5UNdLbY/edit?usp=sharing
Semanas del 8 al 21 de marzo de 2018https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=30https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=30{28e838a4-8015-4177-ac17-2576b5d1e514}Semanas del 8 al 21 de marzo de 2018¡El trabajo de construcción visible y menos visible va muy en marcha aquí en la Escuela Intermedia Platt! Por fuera de la escuela, el gimnasio auxiliar está comenzando a "brotar" ya se han colocado los cimientos y las paredes se continúan construyendo. Los residuos (basura, asfalto, etc.) se eliminarán a medida que se acumulen y el material como grava, hormigón y mampostería se entregarán al sitio a medida que las paredes del nuevo gimnasio comiencen a erigirse. Por esta razón, habrá más tráfico de camiones llegando y saliendo del sitio durante varias semanas, trayendo concreto y mampostería. Tenga esto en cuenta si necesita venir a la escuela durante el día. Dentro de la escuela, el trabajo eléctrico, principalmente en los techos, continúa mientras el contratista se mueve a través del corredor norte y comienza en el pasillo este de la escuela. Se están instalando conductos y bastidores en toda la escuela, y este trabajo se realizará a última hora de la tarde para evitar conflictos con otros eventos por la tarde-noche. Finalmente, el jueves 1 de marzo se realizó una presentación de seguridad en la construcción al personal de la escuela para garantizar que los estudiantes y el personal estén al tanto del trabajo y cómo pueden ayudar a que todos estén seguros durante el proyecto. ¡Los estudiantes estuvieron geniales y están claramente emocionados por los nuevos espacios que tendrán en el futuro cercano! https://docs.google.com/document/d/1xBq9xIPBcErUoTX6CpTfV7G2dhpz9uo3VMEQieByvRg/edit?usp=sharing, https://docs.google.com/document/d/1xBq9xIPBcErUoTX6CpTfV7G2dhpz9uo3VMEQieByvRg/edit?usp=sharing
Semanas del 22 de marzo al 4 de abril de 2018https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=32https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=32{28e838a4-8015-4177-ac17-2576b5d1e514}Semanas del 22 de marzo al 4 de abril de 2018El trabajo de construcción continúa a un ritmo muy rápido aquí en la Escuela Intermedia Platt ya que el nuevo gimnasio auxiliar comienza a tomar forma. Durante las dos semanas de este informe, comenzarán a ver que las paredes del nuevo gimnasio comienzan a "brotar" ya que comenzará la colocación de la mampostería (bloques grises) en su lugar. Durante esta fase, veremos más entregas de material en el sitio y Turner continuará teniendo obreros con banderas y otras precauciones de seguridad a medida que aumente el tráfico de camiones. Dentro de la escuela, el trabajo eléctrico continúa con el reemplazo de lámparas y el trabajo de preparación para los accesorios, así como el reemplazo de las luces estroboscópicas de emergencia. Además, se llevará a cabo una reducción de materiales en lugares seleccionados en el pasillo, por lo tanto, los estudiantes y el personal regresarán a encontrar los pisos descubiertos después de sus vacaciones. Aviso: En el transcurso de las vacaciones de primavera, el contratista trabajando en el sitio aproximadamente de 7 am a 5 pm. Regresarán a sus turnos regulares de día y noche cuando la escuela se reanude el lunes 2 de abril de 2018. https://docs.google.com/document/d/17hxEB9_xKpBYPV71jA2stFsDcPQXpOaBWEcr8uzhbfk/edit?usp=sharing, https://docs.google.com/document/d/17hxEB9_xKpBYPV71jA2stFsDcPQXpOaBWEcr8uzhbfk/edit?usp=sharing
Semanas del 19 de abril al 2 de mayo de 2018https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=35https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=35{28e838a4-8015-4177-ac17-2576b5d1e514}Semanas del 19 de abril al 2 de mayo de 2018Se están erigiendo las paredes aquí en Platt ¡mientras el nuevo gimnasio auxiliar continúa tomando forma! A pesar de los días de fuertes vientos que impidieron el trabajo de la instalación de bloques, Turner se ha mantenido al día del horario semanal que han diseñado para el proyecto. Durante las próximas dos semanas, se completará el trabajo de albañilería y comenzará el trabajo de nivelar para asegurar los cimientos. También, la próxima semana, cortarán la entrada que conecta al gimnasio existente. Dentro de la escuela, el trabajo eléctrico normal (instalación de conductos, bastidores e iluminación) se lleva a cabo a lo largo de los corredores y aulas selectas. Finalmente, finalizará la instalación del generador (lado sur de la escuela, fuera de los vestidores del gimnasio) y estará en funcionamiento en las próximas semanas. Tenga en cuenta que a medida que avanzamos hacia el último mes de la escuela habrá una mayor actividad de construcción en todo el lugar. Como siempre, ¡lo mantendremos informado si alguna de estas actividades le afectará a usted y/o a sus estudiantes!https://docs.google.com/document/d/1UveLPUlQ64zOm_gSP-0DUvM8QSoicJnJhSWKs0HuEaw/edit?usp=sharing, https://docs.google.com/document/d/1UveLPUlQ64zOm_gSP-0DUvM8QSoicJnJhSWKs0HuEaw/edit?usp=sharing
May 17 - 31, 2018https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=37https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=37{28e838a4-8015-4177-ac17-2576b5d1e514}May 17 - 31, 2018The final two weeks of May will see a lot of “ramping up” construction related activity here at Platt Middle School. With an extremely packed schedule this summer, every day is valuable so you well see more people on site beginning this week. At the new auxiliary gym, steel will be installed with the beginning of roof installation slated for the end of May. Concrete will be poured at the new mezzanine as well. Inside, the new lights have been installed in the hallways and the auditorium will be prepared for new lighting and electrical work. Early demo work in the library and the cafeteria will also begin in the coming days. Finally, work in the bathrooms will also begin once school is out. Please note that the entire Platt site is off limits to students and staff beginning the end of the day, May 25th. Community Schools activities on the south fields will still take place but please be aware that parking will be extremely limited around the site beginning May 25th. As always, thanks for your support and we wish all of you a wonderful and relaxing Summer Break. Go Wolves!https://docs.google.com/document/d/1Ov8DE57lr7WhJY_xxo3IcrLQw2w9SMoeDs2U7jhpR08/edit?usp=sharing, https://docs.google.com/document/d/1Ov8DE57lr7WhJY_xxo3IcrLQw2w9SMoeDs2U7jhpR08/edit?usp=sharing
Field Construction Underwayhttps://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=10https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}Field Construction UnderwayPlatt Middle School is a phase 2 project, however installation of the new synthetic field and track has been fast-tracked and began this spring with anticipated completion by August. The timeline for the rest of the project has not been determined, although we anticipate planning could begin in the spring of 2017 or 2018.
Field Construction Kick-off Letter to Familieshttps://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=11https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}Field Construction Kick-off Letter to Familieshttps://bond.bvsd.org/projects/Platt/Documents/Platt%20Field%20Construction%20Kick-off%20Letter%20to%20Families.pdf, http://bond.bvsd.org/projects/Platt/Documents/Platt%20Field%20Construction%20Kick-off%20Letter%20to%20Families.pdf
August 2016https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=12https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}August 2016An artificial turf field and new track were installed during summer 2016. The rest of the project is scheduled for Phase 2.
January 2017https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=13https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}January 2017Design work for Platt's bond-funded building renovations will begin in February. Minutes from Design Advisory Team meetings will be posted in the DAT section of this webpage. Construction is anticipated to begin in spring 2018. Check back here for updates.
Project Start Neighbor Notification Postcardhttps://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=14https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}Project Start Neighbor Notification Postcardhttps://bond.bvsd.org/projects/Platt/Documents/Platt%20DAT%20Neighbor%20Notification%20Postcard%20web.pdf, http://bond.bvsd.org/projects/Platt/Documents/Platt%20DAT%20Neighbor%20Notification%20Postcard%20web.pdf
Project Start Letter to Parentshttps://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=15https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=15{28e838a4-8015-4177-ac17-2576b5d1e514}Project Start Letter to Parentshttps://bond.bvsd.org/projects/Platt/Documents/Platt%20Parent%20Kick%20Off%20Letter.pdf, http://bond.bvsd.org/projects/Platt/Documents/Platt%20Parent%20Kick%20Off%20Letter.pdf
Project Update | February 2017https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=16https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}Project Update | February 2017Design work for Platt's bond-funded building improvements will begin in February. A Design Advisory Team (DAT) is being convened to work with the architect to develop plans for the renovations. Go to the DAT section for meeting schedule and minutes. Construction is anticipated to begin in spring 2018. Check back here for updates.
March 2017https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=17https://bond.bvsd.org/projects/Platt/Lists/Latest Updates/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}March 2017The project team is working with the Design Advisory Team (DAT) to develop the Schematic Design. Follow the DAT link for meeting schedule and minutes.

Project Details

Project Team
Project Manager

 

 

Tom Blahakhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}Tom Blahaktom.blahak@bvsd.org720-561-5791mailto:tom.blahak@bvsd.org, mailto:tom.blahak@bvsd.org

Architect

 

 

MOA Architecturehttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=43{28e838a4-8015-4177-ac17-2576b5d1e514}MOA Architecture303-308-1190http://www.moaarch.com, http://www.moaarch.com

Contractor

 

 

Turnerhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=40{28e838a4-8015-4177-ac17-2576b5d1e514}Turner

Related Resources

 

 

Educational Facilities Master Planhttps://bond.bvsd.org/projects/Platt/Lists/Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Platt/Lists/Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttps://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=70, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=70page

Details
Project Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=56https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=56{28e838a4-8015-4177-ac17-2576b5d1e514}$16,880,131

Innovation Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=56https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=56{28e838a4-8015-4177-ac17-2576b5d1e514}$400,000 included in budget

Bond Expenditures

 

 

Platt Middle Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=56https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=56{28e838a4-8015-4177-ac17-2576b5d1e514}Platt Middle Schoolhttps://bond.bvsd.org/financial/Documents/CurrentProgramExpenditures.pdf, Bond Program Expenditures

Project Expenditures

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=56https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=56{28e838a4-8015-4177-ac17-2576b5d1e514}https://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=56https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=56{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Energy Efficiency/Green Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=56https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=56{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Educational Innovation Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=56https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=56{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClassE00FCA561DCF41B389610342B6D67265"><div>Platt Middle School's project will involve creating a Maker Space and renovating the library. The Maker Space will include areas for small and large group collaboration as well as tools and materials to help teachers integrate technology in meaningful ways.The objective of the library renovation is to create a  space that provides flexibility in learning zones and instructional use to support different modalities of learning.<br></div><div><br></div><a href="/educational-innovation/Pages/Platt-Middle-School.aspx"><div><strong>Learn more</strong></div></a><div><br></div></div>

Design Advisory Team

​The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.​ 

Staff 

Emily Rundell, CHOICE teacher
Erin Greenwood, Platt Science teacher
Caleb Starbuck, Band teacher
Kent Kneipp, P.E. and Technology teacher
Andrew Johnson, P.E. teacher
Cheyne Keith, Librarian
Traci Zajaczkowski, Art teacher
Brooke Daerr, Assistant Principal
Dawn Suitts, Counselor
Patty Patterson, Counselor
Anni Berry, Head Custodian
Theo Robison, Principal
Star Rader, Principal's Assistant

Parents

Stephanie Hein, Platt 6th grade parent
Christopher Limpus, Platt 6th grade parent

Students
Renne Limpus, Elle Hein, 6th grade
Ari Velasco, 7th grade
Grace Callahan, 8th grade


  
​​Community​
Related Resources

 

 

Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/Platt/Lists/DAT Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Platt/Lists/DAT Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf, http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdfpage

DAT Meeting Schedule

DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting. ​​

 

 

February 13, 2017 | Site Visit - no minuteshttps://bond.bvsd.org/projects/Platt/Lists/DAT Meetings List/DispForm.aspx?ID=8https://bond.bvsd.org/projects/Platt/Lists/DAT Meetings List/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}February 13, 2017 | Site Visit - no minutes
February 27, 2017https://bond.bvsd.org/projects/Platt/Lists/DAT Meetings List/DispForm.aspx?ID=7https://bond.bvsd.org/projects/Platt/Lists/DAT Meetings List/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}February 27, 2017https://bond.bvsd.org/projects/Platt/DATMeetingDocs/17102.00%20%20Meeting%20Minutes%20DAT%202%20REV.PDF, http://bond.bvsd.org/projects/Platt/DATMeetingDocs/17102.00%20%20Meeting%20Minutes%20DAT%202%20REV.PDF
March 13, 2017https://bond.bvsd.org/projects/Platt/Lists/DAT Meetings List/DispForm.aspx?ID=6https://bond.bvsd.org/projects/Platt/Lists/DAT Meetings List/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}March 13, 2017https://bond.bvsd.org/projects/Platt/DATMeetingDocs/17102.00%20%20Meeting%20Minutes%20DAT%203.pdf, http://bond.bvsd.org/projects/Platt/DATMeetingDocs/17102.00%20%20Meeting%20Minutes%20DAT%203.pdf
March 20, 2017 | 7 - 8:40 a.m.https://bond.bvsd.org/projects/Platt/Lists/DAT Meetings List/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Platt/Lists/DAT Meetings List/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}March 20, 2017 | 7 - 8:40 a.m.https://bond.bvsd.org/projects/Platt/DATMeetingDocs/17102.00%20%20Meeting%20Minutes%20DAT%204.pdf, http://bond.bvsd.org/projects/Platt/DATMeetingDocs/17102.00%20%20Meeting%20Minutes%20DAT%204.pdf
April 10, 2017 | 3:45 - 5:45 p.m.https://bond.bvsd.org/projects/Platt/Lists/DAT Meetings List/DispForm.aspx?ID=4https://bond.bvsd.org/projects/Platt/Lists/DAT Meetings List/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}April 10, 2017 | 3:45 - 5:45 p.m.https://bond.bvsd.org/projects/Platt/DATMeetingDocs/17102.00%20%20Meeting%20Minutes%20DAT%205.pdf, http://bond.bvsd.org/projects/Platt/DATMeetingDocs/17102.00%20%20Meeting%20Minutes%20DAT%205.pdf
April 24, 2017 | 7 - 8:40 a.m.https://bond.bvsd.org/projects/Platt/Lists/DAT Meetings List/DispForm.aspx?ID=3https://bond.bvsd.org/projects/Platt/Lists/DAT Meetings List/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}April 24, 2017 | 7 - 8:40 a.m.https://bond.bvsd.org/projects/Platt/DATMeetingDocs/17102.00%20%20Meeting%20Minutes%20DAT%206.pdf, http://bond.bvsd.org/projects/Platt/DATMeetingDocs/17102.00%20%20Meeting%20Minutes%20DAT%206.pdf
May 8, 2017 | 7 - 8:40 a.m.https://bond.bvsd.org/projects/Platt/Lists/DAT Meetings List/DispForm.aspx?ID=2https://bond.bvsd.org/projects/Platt/Lists/DAT Meetings List/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}May 8, 2017 | 7 - 8:40 a.m.https://bond.bvsd.org/projects/Platt/DATMeetingDocs/17102.00%20%20Meeting%20Minutes%20DAT%207.pdf, http://bond.bvsd.org/projects/Platt/DATMeetingDocs/17102.00%20%20Meeting%20Minutes%20DAT%207.pdf
May 22, 2017 | 7 - 8:40 a.m.https://bond.bvsd.org/projects/Platt/Lists/DAT Meetings List/DispForm.aspx?ID=1https://bond.bvsd.org/projects/Platt/Lists/DAT Meetings List/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}May 22, 2017 | 7 - 8:40 a.m.https://bond.bvsd.org/projects/Platt/DATMeetingDocs/17102.00%20%20Meeting%20Minutes%20DAT%20Final.pdf, http://bond.bvsd.org/projects/Platt/DATMeetingDocs/17102.00%20%20Meeting%20Minutes%20DAT%20Final.pdf

Timeline

 

 

Schematic Design | March 2017https://bond.bvsd.org/projects/Platt/Lists/Project Timeline/DispForm.aspx?ID=4https://bond.bvsd.org/projects/Platt/Lists/Project Timeline/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}Schematic Design | March 2017Completesuccess
Design Development | May 2017https://bond.bvsd.org/projects/Platt/Lists/Project Timeline/DispForm.aspx?ID=3https://bond.bvsd.org/projects/Platt/Lists/Project Timeline/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Design Development | May 2017Completesuccess
Construction Documents | Sept. 2017https://bond.bvsd.org/projects/Platt/Lists/Project Timeline/DispForm.aspx?ID=2https://bond.bvsd.org/projects/Platt/Lists/Project Timeline/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Documents | Sept. 2017Completesuccess
Construction | Jan. 2018 - Aug. 2018https://bond.bvsd.org/projects/Platt/Lists/Project Timeline/DispForm.aspx?ID=1https://bond.bvsd.org/projects/Platt/Lists/Project Timeline/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}Construction | Jan. 2018 - Aug. 2018In Progressinfo

Images

    There are no items to show in this view of the "Construction Images" list.

    Scope of Work

    ​Facility Condition

    • ​Exterior building improvements such as repair/replace windows and doors, repair masonry and paint
    • Restroom renovations
    • Remodel kitchen and cafeteria and repair replace kitchen equipment
    • Replace interior doors
    • Improvements to interior finishes such as carpet, flooring, ceiling tiles and paint
    • Asbestos abatement
    • Plumbing improvements
    • HVAC repair/replacement
    • Electrical system repair/replacement
    • Repair replace fixtures such as casework
    • Site improvements such as drainage irrigation and paving
    • Audio enhancement in every classroom**

    Program Compatibility 

    • Provide auxiliary gym
    • Provide shop space​

    Health and Physical Development

    • Provide synthetic turf field and track

    Safety and Security

    • Install camera/intercom security system
    • Install security partitions
    • Install electronic security controls
    • Install exterior cameras

    Sustainability​

    • Upgrade lighting
    • Conduct retro-commissioning and repairs
    • Replace aged boiler with more efficient condensing type

    Innovation​

    Platt Middle School is eligible to receive up to $400,000 in additional funds to implement facility improvements that support innovative teaching methods.​

    ** Not included in project budget​​​