Louisville Elementary Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=45https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=45{28e838a4-8015-4177-ac17-2576b5d1e514}Louisville Elementary School400 Hutchinson Street Louisville, CO 80027http://schools.bvsd.org/p12/les720.561.7200Phase 31964<img alt="" src="/projects/Project%20Profile%20Images/LouisvilleES-photo-300x300.JPG" style="BORDER:0px solid;" />$8,509,560$200,000 included in budget

Latest Updates

 

 

May 13, 2019https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=20https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=20{28e838a4-8015-4177-ac17-2576b5d1e514}May 13, 2019Things are beginning to ramp up here at Louisville Elementary School as the bond-funded construction project gets ready to launch in the coming weeks. You will see an increased presence of construction personnel in the coming days, including materials like fencing, additional container(s) and other items arrive. Movers will be at the school Friday, May 24 to clear out classrooms, etc. so work can begin on Tuesday, May 28. The LES front office staff and administration will relocate to Fireside Elementary for the summer beginning 5/28. As you can imagine, a LOT of planning/coordination has gone into making this project run smoothly, and we are excited for the many changes coming to LES! Please note the entire LES campus, including playground areas, will be off-limits to the public during the coming summer. This is to keep both the workers and the public, safe during the project and allows the maximum amount of work to be done in this short period of time. Thanks for your understanding with this temporary restriction! https://docs.google.com/document/d/1Wp5pEW8AZeOIiA4KkpiyVarzOiVfetjFYw9UvogrL18/edit?usp=sharing, https://docs.google.com/document/d/1Wp5pEW8AZeOIiA4KkpiyVarzOiVfetjFYw9UvogrL18/edit?usp=sharing
Construction Kick-off Postcard to Neighborshttps://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=18https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Postcard to Neighborshttps://bond.bvsd.org/projects/LouisvilleElem/Documents/Louisville%20El%20Construction%20Kick-off%20Neighbor%20Postcard.pdf, https://bond.bvsd.org/projects/LouisvilleElem/Documents/Louisville%20El%20Construction%20Kick-off%20Neighbor%20Postcard.pdf
Construction Kick-off Letter to Families and Staffhttps://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=17https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Letter to Families and Staffhttps://docs.google.com/document/d/1edN3egz994GOkFRELbZr39TMri2B-D8gtOWVCzK31nE/edit?usp=sharing, https://docs.google.com/document/d/1edN3egz994GOkFRELbZr39TMri2B-D8gtOWVCzK31nE/edit?usp=sharing

 

 

November 2018https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=15https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=15{28e838a4-8015-4177-ac17-2576b5d1e514}November 2018The project team is working on construction documents. Roche Construction has been selected as the general contractor. Follow the DAT link for project details.
March 2019https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=16https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}March 2019Planning and preparations are underway for construction of our $7.4 million building improvement project to take place this summer. To prepare for construction, asbestos abatement will be conducted in the library over Spring Break. Please note, the building will be closed over Spring Break and the building and site will be closed to the public over the summer. https://docs.google.com/document/d/1cY6K0gTNZVJ6GUGyLk6xH6aTM5ssc4MxDRfocwVx4SQ/edit?usp=sharing, https://docs.google.com/document/d/1cY6K0gTNZVJ6GUGyLk6xH6aTM5ssc4MxDRfocwVx4SQ/edit?usp=sharing
September 2018https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=14https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}September 2018The project team is working on design development.
April 2019https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=19https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}April 2019To get a head start on the project, some work was completed in the school over Spring Break. Construction will resume when students and staff leave for the summer.
Project Kick-off Letter to Parentshttps://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=12https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}Project Kick-off Letter to Parentshttps://docs.google.com/document/d/1nRlQsrucjYB6O49golu_YQjNfNpNab21zMp7Zl0e01U/edit?usp=sharing, https://docs.google.com/document/d/1nRlQsrucjYB6O49golu_YQjNfNpNab21zMp7Zl0e01U/edit?usp=sharing
August 2018https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=11https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}August 2018The architects are working with the Design Advisory Team (DAT) to develop the schematic design. Follow the DAT link for meeting dates and minutes.
June 2018https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=10https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}June 2018Design work for this project will begin this summer.
Project Kick-off Postcard to Neighborshttps://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=13https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}Project Kick-off Postcard to Neighborshttps://bond.bvsd.org/projects/LouisvilleElem/Documents/Louisville%20Elementary%20Neighbor%20DAT%20Start%20Notification%20Postcard%20web.pdf, https://bond.bvsd.org/projects/LouisvilleElem/Documents/Louisville%20Elementary%20Neighbor%20DAT%20Start%20Notification%20Postcard%20web.pdf
This project is scheduled to begin in Phase 3. https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=8https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}This project is scheduled to begin in Phase 3.
There are no previsous updates. https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=9https://bond.bvsd.org/projects/LouisvilleElem/Lists/Latest Updates/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}There are no previsous updates.

Project Details

Project Team
Project Manager

 

 

Katheryn Zeebhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=44{28e838a4-8015-4177-ac17-2576b5d1e514}Katheryn Zeebkatheryn.zeeb@bvsd.org720.561.5109

Architect

 

 

RB+Bhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=38{28e838a4-8015-4177-ac17-2576b5d1e514}RB+Bhttp://www.rbbarchitects.com/, http://www.rbbarchitects.com/

Contractor

 

 

Roche Constructionhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=50{28e838a4-8015-4177-ac17-2576b5d1e514}Roche Construction303-920-5555

Related Resources

 

 

Educational Facilities Master Planhttps://bond.bvsd.org/projects/LouisvilleElem/Lists/Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/LouisvilleElem/Lists/Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttps://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlahttp://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=58n.pdf#page=63, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=58page

Details
Project Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=45https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=45{28e838a4-8015-4177-ac17-2576b5d1e514}$8,509,560

Innovation Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=45https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=45{28e838a4-8015-4177-ac17-2576b5d1e514}$200,000 included in budget

Bond Expenditures

 

 

Louisville Elementary Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=45https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=45{28e838a4-8015-4177-ac17-2576b5d1e514}Louisville Elementary Schoolhttps://bond.bvsd.org/financial/Documents/CurrentProgramExpenditures.pdf, Bond Program Expenditures

Project Expenditures

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=45https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=45{28e838a4-8015-4177-ac17-2576b5d1e514}https://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=45https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=45{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Energy Efficiency/Green Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=45https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=45{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Educational Innovation Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=45https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=45{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Design Advisory Team

​The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.​ The design advisory team will be created when the project begins. 

Staff 

Jeff Miller, Principal
Jil Thomason
Jessica Jungman
Ann Godby


Parents

  
​​Community​
Related Resources

 

 

Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/LouisvilleElem/Lists/DAT Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/LouisvilleElem/Lists/DAT Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf, http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdfpage

DAT Meeting Schedule

DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting. ​​

 

 

August 22, 2018 | 2: 45 p.m.https://bond.bvsd.org/projects/LouisvilleElem/Lists/DAT Meetings List/DispForm.aspx?ID=1https://bond.bvsd.org/projects/LouisvilleElem/Lists/DAT Meetings List/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}August 22, 2018 | 2: 45 p.m.https://bond.bvsd.org/projects/LouisvilleElem/DATMeetingDocs/2018-08-22%20DAT%201%20Minutes.pdf, https://bond.bvsd.org/projects/LouisvilleElem/DATMeetingDocs/2018-08-22%20DAT%201%20Minutes.pdf
August 29, 2018 | 3 p.m.https://bond.bvsd.org/projects/LouisvilleElem/Lists/DAT Meetings List/DispForm.aspx?ID=2https://bond.bvsd.org/projects/LouisvilleElem/Lists/DAT Meetings List/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}August 29, 2018 | 3 p.m.https://bond.bvsd.org/projects/LouisvilleElem/DATMeetingDocs/2018-08-29%20DAT%202%20Minutes.pdf, https://bond.bvsd.org/projects/LouisvilleElem/DATMeetingDocs/2018-08-29%20DAT%202%20Minutes.pdf
September 5, 2018 | 3 p.m.https://bond.bvsd.org/projects/LouisvilleElem/Lists/DAT Meetings List/DispForm.aspx?ID=3https://bond.bvsd.org/projects/LouisvilleElem/Lists/DAT Meetings List/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}September 5, 2018 | 3 p.m.https://bond.bvsd.org/projects/LouisvilleElem/DATMeetingDocs/2018-09-05%20DAT%203%20Minutes%20web.pdf, https://bond.bvsd.org/projects/LouisvilleElem/DATMeetingDocs/2018-09-05%20DAT%203%20Minutes%20web.pdf

Timeline

 

 

Design Development | October 2018https://bond.bvsd.org/projects/LouisvilleElem/Lists/Project Timeline/DispForm.aspx?ID=2https://bond.bvsd.org/projects/LouisvilleElem/Lists/Project Timeline/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Design Development | October 2018Completesuccess
Construction Documents | November 2018https://bond.bvsd.org/projects/LouisvilleElem/Lists/Project Timeline/DispForm.aspx?ID=3https://bond.bvsd.org/projects/LouisvilleElem/Lists/Project Timeline/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Documents | November 2018In Progressinfo
Schematic Design | September 2018https://bond.bvsd.org/projects/LouisvilleElem/Lists/Project Timeline/DispForm.aspx?ID=1https://bond.bvsd.org/projects/LouisvilleElem/Lists/Project Timeline/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}Schematic Design | September 2018Completesuccess

Images

​​    Check back here for photos of the project!
    There are no items to show in this view of the "Construction Images" list.

    Scope of Work

    Facility Condition

    • Exterior building improvements such as repair/replace windows and doors
    • Repair roof
    • Replace interior doors
    • Improvements to interior finishes such as carpet and paint
    • Asbestos abatement
    • Replace intercom
    • Fire protection system improvements
    • Electrical system upgrades including emergency generator
    • Repair/replace fixtures such as casework
    • Site improvements such as paving and drainage
    • Restroom renovations
    • Audio enhancement in every classroom

    Program Compatibility 

    • Provide adequate space for full-day kindergarten
    • Provide adequate space for preschool
    • Provide adequate Special Education space

    Health and Physical Development

    • Upgrade playground equipment and surface material

    Safety and Security

    • Install camera/intercom security system
    • Install electronic security controls
    • Install security partitions

    Sustainability

    • Conduct retro-commissioning and repairs
    • Upgrade lighting
    • Upgrade HVAC controls

    Innovation

    Louisville Elementary School is eligible to receive up to $200,000 in additional funds to implement facility improvements that support innovative teaching methods.