Lafayette Elementary Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=44https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=44{28e838a4-8015-4177-ac17-2576b5d1e514}Lafayette Elementary School101 North Bermont Avenue Lafayette, CO 80026http://schools.bvsd.org/p12/Lafayette720.561.8900Phase 31964<img alt="" src="/projects/Project%20Profile%20Images/LafayetteES-photo-300x300.JPG" style="BORDER:0px solid;" />$10,203,807$200,000 included in budget

Latest Updates

 

 

May 23, 2019https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=28https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=28{28e838a4-8015-4177-ac17-2576b5d1e514}May 23, 2019Turner Construction continues to work on the intermediate playground. They recently completed a storm drain installation on the playground and are now starting to form and pour concrete for the foundation of the new playground. Inside the building, crews are working evenings to install above ceiling electrical wiring and are scheduled to install new gym lighting in the coming days. We appreciate the opportunity to start the construction work early to help us meet the August school start date. Just a reminder, the school building and grounds will be closed for the summer. Lafayette administrative staff will move to Pioneer Elementary during construction.
24 de mayo de 2019https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=27https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=27{28e838a4-8015-4177-ac17-2576b5d1e514}24 de mayo de 2019Turner Construction sigue trabajando en el patio de recreo intermedio. Hace poco terminaron de instalar el alcantarillado del nuevo patio de recreo y están empezando a formar y verter el concreto para los cimientos. Dentro del edificio, los equipos han estado trabajando durante las tardes para instalar el cableado eléctrico dentro del techo y durante los próximos días instalarán las luces en el nuevo gimnasio. Estamos agradecidos de la oportunidad de comenzar la construcción temprano, ya que nos ayudará a terminar antes de que las clases comiencen en agosto. Les recordamos que la escuela y los espacios exteriores estarán cerrados durante el verano. El personal administrativo de Lafayette se trasladará a la primaria Pioneer durante la construcción. https://docs.google.com/document/d/1sM-98Lg7BjRH9b9JMeBT7CIXm1DqU-s7KSeLnjoF0E4/edit?usp=sharing, https://docs.google.com/document/d/1sM-98Lg7BjRH9b9JMeBT7CIXm1DqU-s7KSeLnjoF0E4/edit?usp=sharing
Lafayette Elementary 2019-20 School Year Start Date Changehttps://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=23https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}Lafayette Elementary 2019-20 School Year Start Date ChangeFollowing extensive consideration of the amount of work to be completed and the time available with students and staff out of the building over the summer, we have made the decision to delay the start of the 2019-20 school year by three days. This decision is largely driven by the considerable amount of asbestos in the school. The construction project creates the opportunity to remove most of it. While this work will start as soon as school is out, it will take some time to complete – plus, the rest of the construction cannot start until asbestos abatement is complete. Delaying the start of school will provide the necessary additional time to complete the work and allow for a smoother start of school. Follow the link for more information. https://docs.google.com/document/d/1Sst-FW0cEoz4CsM8T5OQidyIjiC7nAy-XumFqDns_WU/edit?usp=sharing, https://docs.google.com/document/d/1Sst-FW0cEoz4CsM8T5OQidyIjiC7nAy-XumFqDns_WU/edit?usp=sharing
Nueva fecha de inicio del año escolar 2019-20 de la Primaria Lafayettehttps://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=22https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=22{28e838a4-8015-4177-ac17-2576b5d1e514}Nueva fecha de inicio del año escolar 2019-20 de la Primaria LafayetteDespués de considerar detenidamente la cantidad de trabajo que hay que terminar y el tiempo que tendremos disponible para hacerlo mientras que los estudiantes y empleados están fuera del edificio durante el verano, decidimos demorar el inicio del año escolar 2019-20 por tres días. Un factor grande detrás de esta decisión es la gran cantidad de asbesto que se eliminará durante el proyecto de construcción. Aunque el trabajo comenzará el momento que termina el año escolar, tomará bastante tiempo completarlo. Además, no se podrá hacer más construcción hasta que termine la eliminación de asbesto. Al demorar el inicio del nuevo año escolar, podremos disponer del tiempo adicional necesario para terminar el trabajo y permitir un comienzo más tranquilo del nuevo año. https://docs.google.com/document/d/1w6n-t74CyOhgGY_4tyf2J7ikrgXSCJwSvwX3YFOmShI/edit?usp=sharing, https://docs.google.com/document/d/1w6n-t74CyOhgGY_4tyf2J7ikrgXSCJwSvwX3YFOmShI/edit?usp=sharing
Construction Kick-off Postcard to Neighborshttps://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=20https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=20{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Postcard to Neighborshttps://bond.bvsd.org/projects/Lafayette/Documents/Lafayette%20El%20Construction%20Kick-off%20Neighbor%20Postcard%20(1).pdf, https://bond.bvsd.org/projects/Lafayette/Documents/Lafayette%20El%20Construction%20Kick-off%20Neighbor%20Postcard%20(1).pdf
Carta de Inicio de Construcciónhttps://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=19https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}Carta de Inicio de Construcciónhttps://docs.google.com/document/d/1jUf5TBz59KG9XiX-5h6XMvq5tUiSqluU9VLKnHx2ZGI/edit?usp=sharing, https://docs.google.com/document/d/1jUf5TBz59KG9XiX-5h6XMvq5tUiSqluU9VLKnHx2ZGI/edit?usp=sharing
Construction Kick-off Letter to Families and Staffhttps://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=18https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Letter to Families and Staffhttps://docs.google.com/document/d/1I8KxR_3JeXMjtAR5JXGwfhW48gl8IPr9CeXG2v-q0qo/edit?usp=sharing, https://docs.google.com/document/d/1I8KxR_3JeXMjtAR5JXGwfhW48gl8IPr9CeXG2v-q0qo/edit?usp=sharing

 

 

29 de abril de 2019https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=25https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=25{28e838a4-8015-4177-ac17-2576b5d1e514}29 de abril de 2019Turner Construction se ha trasladado al sitio y ha establecido una zona de construcción alrededor del patio de recreo para estudiantes mayores. A lo largo de las últimas semanas, los equipos se han mantenido ocupados sacando el equipo de recreo existente y el asfalto viejo. El trabajo ha disminuido recientemente para limitar interrupciones a los exámenes de CMAS. Durante las próximas semanas, los trabajadores cavarán pequeñas zanjas en el asfalto cerca del patio de recreo para facilitar el drenaje. Las zanjas se taparán temporalmente con tableros de madera, hasta que se puedan volver a llenar con asfalto en el verano. https://docs.google.com/document/d/1Q5880TsuAQHmDcrq0zghTVC-UJaY05mvuTCiPt_CMkQ/edit?usp=sharing, https://docs.google.com/document/d/1Q5880TsuAQHmDcrq0zghTVC-UJaY05mvuTCiPt_CMkQ/edit?usp=sharing
November 2018https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=16https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}November 2018The project team is working to have construction documents ready in December. Turner Construction has been selected as the contractor for the project. Follow the DAT link to meeting minutes for project details.
October 2018https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=15https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=15{28e838a4-8015-4177-ac17-2576b5d1e514}October 2018The project team is working on design development. Follow the DAT link for design advisory team meeting minutes and dates. ​
March 2019https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=17https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}March 2019Turner Construction will mobilize to the site over Spring Break. Read the Construction Kick-off Letter for more information about what to expect.
April 29, 2019https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=26https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=26{28e838a4-8015-4177-ac17-2576b5d1e514}April 29, 2019Turner Construction has mobilized to the site and established a construction area around the intermediate playground. Over the past few weeks, crews have been busy removing the existing playground equipment and old asphalt. Due to recent CMAS testing, work has slowed to minimize disruption. In the coming weeks, crews will dig small trenches in the asphalt by the intermediate playground for drainage. The trenches will be covered temporarily with plywood until asphalt can be poured back this summer. https://docs.google.com/document/d/1vDujeyzkziduK-wpEA0_-Us8ThFyR-YjYDatEElZZ9U/edit?usp=sharing, https://docs.google.com/document/d/1vDujeyzkziduK-wpEA0_-Us8ThFyR-YjYDatEElZZ9U/edit?usp=sharing
April 2019https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=21https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=21{28e838a4-8015-4177-ac17-2576b5d1e514}April 2019Construction is underway at Lafayette Elementary! Turner Construction has mobilized to the site and established a construction area on the south side of the site. The intermediate playground is being demolished to make way for new equipment and surfacing.
September 2018https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=14https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}September 2018The project team is working on design development. Follow the DAT link for design advisory team meeting minutes and dates.
August 2018https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=13https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}August 2018The project architects are meeting with the Design Advisory Team (DAT) to develop the schematic design for the project. Follow the DAT link for meeting dates and minutes. These meetings are open to the public and there is an opportunity for public comment at each meeting.
June 2018https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=10https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}June 2018Pre-design for the project will begin in June. The Design Advisory Team will have its first meeting June 19, 1-3 p.m.
Project Kick-off Letter to Parentshttps://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=11https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}Project Kick-off Letter to Parentshttps://docs.google.com/document/d/1DTLAJB8xMRpn0n4wZDnVa2cbnMbtJWIi4HfJIVqO44s/edit?usp=sharing, https://docs.google.com/document/d/1DTLAJB8xMRpn0n4wZDnVa2cbnMbtJWIi4HfJIVqO44s/edit?usp=sharing
Project Kick-off Postcard to Neighborshttps://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=12https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}Project Kick-off Postcard to Neighborshttps://bond.bvsd.org/projects/Lafayette/Documents/Lafayette%20Neighbor%20DAT%20Start%20Notification%20Postcard%20Web.pdf, https://bond.bvsd.org/projects/Lafayette/Documents/Lafayette%20Neighbor%20DAT%20Start%20Notification%20Postcard%20Web.pdf
This project is scheduled to begin in Phase 3. https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=8https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}This project is scheduled to begin in Phase 3.
There are no previsous updates. https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=9https://bond.bvsd.org/projects/Lafayette/Lists/Latest Updates/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}There are no previsous updates.

Project Details

Project Team
Project Manager

 

 

Gene Temansonhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=55{28e838a4-8015-4177-ac17-2576b5d1e514}Gene Temanson

Architect

 

 

Wold Architects and Engineershttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=31{28e838a4-8015-4177-ac17-2576b5d1e514}Wold Architects and Engineershttp://www.woldae.com/, http://www.woldae.com/

Contractor

 

 

Turnerhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=40{28e838a4-8015-4177-ac17-2576b5d1e514}Turner

Related Resources

 

 

Educational Facilities Master Planhttps://bond.bvsd.org/projects/Lafayette/Lists/Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Lafayette/Lists/Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttps://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=57, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=57page

Details
Project Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=44https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=44{28e838a4-8015-4177-ac17-2576b5d1e514}$10,203,807

Innovation Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=44https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=44{28e838a4-8015-4177-ac17-2576b5d1e514}$200,000 included in budget

Bond Expenditures

 

 

Lafayette Elementary Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=44https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=44{28e838a4-8015-4177-ac17-2576b5d1e514}Lafayette Elementary Schoolhttps://bond.bvsd.org/financial/Documents/CurrentProgramExpenditures.pdf, Bond Program Expenditures

Project Expenditures

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=44https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=44{28e838a4-8015-4177-ac17-2576b5d1e514}https://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=44https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=44{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Energy Efficiency/Green Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=44https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=44{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Educational Innovation Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=44https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=44{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Design Advisory Team

​The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.​ The design advisory team will be created when the project begins. 

Staff 
Stephanie Jackman, Principal
Jennifer Weaver, ILC Teacher
Parents

Alison Fischer, parent and 17-18 instructional para
Keenan Albenberg, parent
Tanner Dayhoff, parent and BVSD Principal

  
​​Community​
Related Resources

 

 

Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/Lafayette/Lists/DAT Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Lafayette/Lists/DAT Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf, http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdfpage

DAT Meeting Schedule

DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting. ​​

 

 

June 19, 2018 | 1 - 3 p.m.https://bond.bvsd.org/projects/Lafayette/Lists/DAT Meetings List/DispForm.aspx?ID=1https://bond.bvsd.org/projects/Lafayette/Lists/DAT Meetings List/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}June 19, 2018 | 1 - 3 p.m.https://bond.bvsd.org/projects/Lafayette/DATMeetingDocs/6.19.18%20DAT%201.pdf, https://bond.bvsd.org/projects/Lafayette/DATMeetingDocs/6.19.18%20DAT%201.pdf
August 14, 2018 | 2 - 4 p.m.https://bond.bvsd.org/projects/Lafayette/Lists/DAT Meetings List/DispForm.aspx?ID=2https://bond.bvsd.org/projects/Lafayette/Lists/DAT Meetings List/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}August 14, 2018 | 2 - 4 p.m.https://bond.bvsd.org/projects/Lafayette/DATMeetingDocs/LES%208.14.18%20DAT%202.pdf, https://bond.bvsd.org/projects/Lafayette/DATMeetingDocs/LES%208.14.18%20DAT%202.pdf
September 11, 2018 | 2:45 - 4:45 p.m.https://bond.bvsd.org/projects/Lafayette/Lists/DAT Meetings List/DispForm.aspx?ID=3https://bond.bvsd.org/projects/Lafayette/Lists/DAT Meetings List/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}September 11, 2018 | 2:45 - 4:45 p.m.https://bond.bvsd.org/projects/Lafayette/DATMeetingDocs/9.11.18%20DAT%203.pdf, https://bond.bvsd.org/projects/Lafayette/DATMeetingDocs/9.11.18%20DAT%203.pdf
October 3, 2018 | 2:45 - 4:45 p.m.https://bond.bvsd.org/projects/Lafayette/Lists/DAT Meetings List/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Lafayette/Lists/DAT Meetings List/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}October 3, 2018 | 2:45 - 4:45 p.m.https://bond.bvsd.org/projects/Lafayette/DATMeetingDocs/10.3.18%20DAT%204.pdf, https://bond.bvsd.org/projects/Lafayette/DATMeetingDocs/10.3.18%20DAT%204.pdf
November 13, 2018 | 2:45 - 4:45 p.m.https://bond.bvsd.org/projects/Lafayette/Lists/DAT Meetings List/DispForm.aspx?ID=4https://bond.bvsd.org/projects/Lafayette/Lists/DAT Meetings List/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}November 13, 2018 | 2:45 - 4:45 p.m.

Timeline

 

 

Schematic Design | September 2018https://bond.bvsd.org/projects/Lafayette/Lists/Project Timeline/DispForm.aspx?ID=1https://bond.bvsd.org/projects/Lafayette/Lists/Project Timeline/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}Schematic Design | September 2018Completesuccess
Design Development | October 2018https://bond.bvsd.org/projects/Lafayette/Lists/Project Timeline/DispForm.aspx?ID=2https://bond.bvsd.org/projects/Lafayette/Lists/Project Timeline/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Design Development | October 2018Completesuccess
Construction Documents | December 2018https://bond.bvsd.org/projects/Lafayette/Lists/Project Timeline/DispForm.aspx?ID=3https://bond.bvsd.org/projects/Lafayette/Lists/Project Timeline/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Documents | December 2018Completesuccess
Construction Start | March 2018https://bond.bvsd.org/projects/Lafayette/Lists/Project Timeline/DispForm.aspx?ID=4https://bond.bvsd.org/projects/Lafayette/Lists/Project Timeline/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Start | March 2018In Progressinfo

Images

​​    Check back here for photos of the project!
    There are no items to show in this view of the "Construction Images" list.

    Scope of Work

    Facility Condition

    • Exterior building improvements such as repair/replace windows and doors
    • Repair roof
    • Restroom renovations
    • Replace interior doors
    • Asbestos abatement
    • Electrical system upgrades including emergency generator
    • Communications and clock system improvements
    • HVAC system improvements
    • Site improvements such as paving and drainage
    • Audio enhancement in every classroom
    • Building-wide air conditioning (amended Feb. 27, 2019)

    Program Compatibility 

    • Provide adequate space for full-day kindergarten
    • Provide adequate space for preschool
    • Provide adequate Special Education space

    Health and Physical Development

    • Upgrade playground equipment and surface material

    Safety and Security

    • Install electronic security controls
    • Install security partitions
    • Install camera/intercom security system
    • Redesign main entry to provide more control over visitor access
    • Improve parking lot and exterior lighting

    Sustainability

    • Conduct retro-commissioning and repairs
    • Upgrade lighting

    Innovation

    Lafayette Elementary School is eligible to receive up to $200,000 in additional funds to implement facility improvements that support innovative teaching methods.