Heatherwood Elementary Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=38https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=38{28e838a4-8015-4177-ac17-2576b5d1e514}Heatherwood Elementary School7750 Concord Drive Boulder, CO 80301http://schools.bvsd.org/p12/heatherwood720.561.5586Phase 31971<img alt="" src="/projects/Project%20Profile%20Images/HeatherwoodES-photo-300x300.JPG" style="BORDER:0px solid;" />$7,136,412$200,000 included in budget

Latest Updates

 

 

June 2019https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=26https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=26{28e838a4-8015-4177-ac17-2576b5d1e514}June 2019Adolfson & Peterson (A&P) Construction has been very productive this month. Inside the school, crews are busy reconfiguring the front vestibule and office space, installing new windows, constructing walls for the preschool and kindergarten rooms and in the open space areas, and renovating restrooms. Carpet has been removed from the gym, and walls are being painted. A significant amount of work is occurring above the ceiling, including new wiring and ductwork. Modifications are underway in the Den to improve ADA accessibility and reconfigure other spaces for small group rooms and a maker space. The rooftop is a busy place with demolition occurring, soon to be followed by new roof installation. New roof-top HVAC units will be installed in the coming weeks. Playground renovation is on-going. Construction progress continues to move along on schedule.
Construction Kick-off Letter to Families and Staffhttps://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=19https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Letter to Families and Staffhttp://https://docs.google.com/document/d/1iVgco2OQn0Q7xZh97Ne_pimkPnI4ob7q6Z66fSKyN3E/edit?usp=sharing, http://https://docs.google.com/document/d/1iVgco2OQn0Q7xZh97Ne_pimkPnI4ob7q6Z66fSKyN3E/edit?usp=sharing
Construction kick-off postcard to neighborshttps://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=18https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}Construction kick-off postcard to neighborshttps://docs.google.com/document/d/1vLckylMzY9ceZXWG4wz_Syt8HoIpSuO_rVSLKy_7GVM/edit?usp=sharing, https://docs.google.com/document/d/1vLckylMzY9ceZXWG4wz_Syt8HoIpSuO_rVSLKy_7GVM/edit?usp=sharing

 

 

October 2018https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=15https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=15{28e838a4-8015-4177-ac17-2576b5d1e514}October 2018The project team is working on construction documents. Follow the DAT link for meeting minutes.
November 2018https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=16https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}November 2018The project team is working on construction documents. Adolfson and Peterson has been selected as the general contractor. Follow the DAT link for project details.
March 22, 2019https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=21https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=21{28e838a4-8015-4177-ac17-2576b5d1e514}March 22, 2019Adolfson and Peterson (A&P) Construction has been working evenings Monday through Thursday in the interior of the building replacing drinking fountains and working above ceilings running fire alarm wiring. In the west parking lot, A&P has been busy installing underground electrical wiring and pouring the curbs and gutters. Over Spring Break, crews will pour concrete for the light bases and sidewalks in the west parking lot. On the interior of the building, they will level the concrete slab in the kitchen and surrounding classrooms. In addition, drinking fountain installation will continue, along with asbestos removal in various locations. The team has made great progress over the past couple of weeks! https://docs.google.com/document/d/18m0UazmZ4hPfRfAg2TcLKRpqCD8wDe6wE5Lmm3sBiI8/edit?usp=sharing, https://docs.google.com/document/d/18m0UazmZ4hPfRfAg2TcLKRpqCD8wDe6wE5Lmm3sBiI8/edit?usp=sharing
May 3, 2019https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=24https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=24{28e838a4-8015-4177-ac17-2576b5d1e514}May 3, 2019Adolfson and Peterson (A&P) Construction has shifted the focus of their work to the interior of the building. In addition to continued above-ceiling investigations of the HVAC, mechanical and electrical routings and caulk removal around the windows, A&P has started to renovate the restroom adjacent to the cafeteria. The restroom remodel during May will give crews a head start on the completion of the project. All interior work is still being conducted after hours. As the weather gets warmer, the current heating system will be shut down and the boilers removed in preparation for installing new high-efficiency boilers this summer. Thank you for your patience during our construction work ahead of the summer schedule.https://docs.google.com/document/d/1cdV9VSYRVeaBMtBfKV88aw-u5AB26wysQPPwvyC1HhY/edit?usp=sharing, https://docs.google.com/document/d/1cdV9VSYRVeaBMtBfKV88aw-u5AB26wysQPPwvyC1HhY/edit?usp=sharing
April 5, 2019https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=22https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=22{28e838a4-8015-4177-ac17-2576b5d1e514}April 5, 2019Adolfson and Peterson (A&P) Construction accomplished a great deal of work over the Spring Break week. Crews poured new concrete sidewalks and parking lot curbing at the front and west of the school. They also installed new drinking fountains and completed asbestos abatement in various locations. Additional work in the cafeteria area evened out the floors. In the coming weeks, A&P will be working on the west parking lot grading and compacting to prepare for the first layer of asphalt. Inside the school, crews will continue working evenings Monday through Thursday to replace the old drinking fountains and install wiring above the ceiling grid for the new fire alarm system.https://docs.google.com/document/d/1_JuEwRJpWOlvkOe3c3LhWUO8P4PZIwDBPlufIh5UYjc/edit?usp=sharing, https://docs.google.com/document/d/1_JuEwRJpWOlvkOe3c3LhWUO8P4PZIwDBPlufIh5UYjc/edit?usp=sharing
March 2019https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=20https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=20{28e838a4-8015-4177-ac17-2576b5d1e514}March 2019Adolfson and Peterson (A & P) Construction has started work on the exterior site and interior of the building. Exterior work this week included the demolition and site grading for the west parking lot expansion. The east parking lot has been expanded temporarily to accommodate school parking displaced from the west lot. Interior activity (which occurs M-Th., 3 p.m. to 1:30 a.m.) included initial work to replace drinking fountains in the school and investigation of the mechanical, electrical, and plumbing systems above the ceiling grid. In the coming weeks, A & P will complete the demo of the west parking lot and begin to form curbs and gutters. Interior work will focus on the continued removal of drinking fountains in the building. Temporary water coolers will be placed in various locations until new water fountains are installed. https://docs.google.com/document/d/1V9Kmdp00qC4XQ2H5KmyGSdd201jSe4FyahRDZKezcPE/edit?usp=sharing, https://docs.google.com/document/d/1V9Kmdp00qC4XQ2H5KmyGSdd201jSe4FyahRDZKezcPE/edit?usp=sharing
April 19, 2019https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=23https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}April 19, 2019Adolfson and Peterson (A&P) Construction continues to work on both the exterior site and interior portions of the building. On the exterior, they are working on rerouting irrigation lines due to the west parking lot expansion. The first layer of asphalt in the west parking lot was laid down today. The interior night work will continue to focus on investigations of the HVAC mechanical and electrical routings above ceilings and caulking removal around the windows. In the coming weeks, they will continue to conduct night work above ceiling work and as the weather gets warmer in May, will work in the boiler room in preparation for installing new boilers this summer.https://docs.google.com/document/d/16DFpg3wfxSiZe303Ej2Lf2clwMWv-SNIHNKkJJMiWKk/edit?usp=sharing, https://docs.google.com/document/d/16DFpg3wfxSiZe303Ej2Lf2clwMWv-SNIHNKkJJMiWKk/edit?usp=sharing
Project Kick-off Letter to Parentshttps://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=12https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}Project Kick-off Letter to Parentshttps://docs.google.com/document/d/1Su_EcFX_5b_m7qMTCb7dmUAFvt0u-c6M6K2M1PfmUhk/edit?usp=sharing, https://docs.google.com/document/d/1Su_EcFX_5b_m7qMTCb7dmUAFvt0u-c6M6K2M1PfmUhk/edit?usp=sharing
Project Kick-off Postcard to Neighborshttps://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=13https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}Project Kick-off Postcard to Neighborshttps://bond.bvsd.org/projects/Heatherwood/Documents/Heatherwood%20Neighbor%20DAT%20Start%20Notification%20Postcard%20web.pdf, https://bond.bvsd.org/projects/Heatherwood/Documents/Heatherwood%20Neighbor%20DAT%20Start%20Notification%20Postcard%20web.pdf
September 2018https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=14https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}September 2018The project team is working on design development. Follow the DAT link for meeting dates and minutes.
May 17, 2019https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=25https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=25{28e838a4-8015-4177-ac17-2576b5d1e514}May 17, 2019Adolfson and Peterson (A&P) Construction is working on the interior of the building remodeling the north bathroom adjacent to the cafeteria. They have completed the rough-in plumbing and steel wall framing and will begin to drywall, tape, and finish next week. In addition, they were able to remove the existing boilers and begin pad repair work in the boiler room area to prepare for the new system. In the coming weeks, new boilers will be installed. The construction work is scheduled to ramp up quickly at the end of the school year and will go strong until August. Thank you for your patience during our construction work ahead of the summer schedule. The school building and grounds will be closed for the summer. Heatherwood administrative staff will move to Douglass Elementary during construction. http://https://docs.google.com/document/d/1c0e_dFggjPny3vS_OML4N3506j_dnVfYwNivqWgzCN0/edit?usp=sharing, http://https://docs.google.com/document/d/1c0e_dFggjPny3vS_OML4N3506j_dnVfYwNivqWgzCN0/edit?usp=sharing
February 2019https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=17https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}February 2019Construction will begin later this month. Follow the link below for all the details. https://docs.google.com/document/d/1iVgco2OQn0Q7xZh97Ne_pimkPnI4ob7q6Z66fSKyN3E/edit?usp=sharing, https://docs.google.com/document/d/1iVgco2OQn0Q7xZh97Ne_pimkPnI4ob7q6Z66fSKyN3E/edit?usp=sharing
June 2018https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=10https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}June 2018Pre-design work for this project will begin this month. The Design Advisory Team will begin meeting in August.
This project is scheduled to begin in Phase 3. https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=8https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}This project is scheduled to begin in Phase 3.
There are no previsous updates. https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=9https://bond.bvsd.org/projects/Heatherwood/Lists/Latest Updates/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}There are no previsous updates.

Project Details

Project Team
Project Manager

 

 

Charles Zachemskyhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}Charles Zachemskycharles.zachemsky@bvsd.org720-561-5954mailto:charles.zachemsky@bvsd.org, mailto:charles.zachemsky@bvsd.org

Architect

 

 

DLR Grouphttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=41{28e838a4-8015-4177-ac17-2576b5d1e514}DLR Grouphttp://www.dlrgroup.com/home/, http://www.dlrgroup.com/home/

Contractor

 

 

Adolfson & Peterson Constructionhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}Adolfson & Peterson Constructionhttp://www.a-p.com, http://www.a-p.com

Related Resources

 

 

Educational Facilities Master Planhttps://bond.bvsd.org/projects/Heatherwood/Lists/Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Heatherwood/Lists/Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttps://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=51, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=51page

Details
Project Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=38https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=38{28e838a4-8015-4177-ac17-2576b5d1e514}$7,136,412

Innovation Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=38https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=38{28e838a4-8015-4177-ac17-2576b5d1e514}$200,000 included in budget

Bond Expenditures

 

 

Heatherwood Elementary Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=38https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=38{28e838a4-8015-4177-ac17-2576b5d1e514}Heatherwood Elementary Schoolhttps://bond.bvsd.org/financial/Documents/CurrentProgramExpenditures.pdf, Bond Program Expenditures

Project Expenditures

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=38https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=38{28e838a4-8015-4177-ac17-2576b5d1e514}https://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=38https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=38{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Energy Efficiency/Green Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=38https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=38{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Educational Innovation Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=38https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=38{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Design Advisory Team

​The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.​ The design advisory team will be created when the project begins. 

Staff 
Genna Jaramillo, Principal
David Rivers
Eve Steed
Julie Cutshall
Nicole Martini
Laura Tischendorf
Parents
Holly Owens
Francoise Fornier
Jennifer Hartzheim
  
​​Community​
Related Resources

 

 

Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/Heatherwood/Lists/DAT Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Heatherwood/Lists/DAT Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf, http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdfpage

DAT Meeting Schedule

DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting. ​​

 

 

August 22, 2018 | 2:45 - 3:45 p.m.https://bond.bvsd.org/projects/Heatherwood/Lists/DAT Meetings List/DispForm.aspx?ID=3https://bond.bvsd.org/projects/Heatherwood/Lists/DAT Meetings List/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}August 22, 2018 | 2:45 - 3:45 p.m.https://bond.bvsd.org/projects/Heatherwood/DATMeetingDocs/BVSD%20Heatherwood%20ES%20DAT%20Mtg%2001_180822.pdf, https://bond.bvsd.org/projects/Heatherwood/DATMeetingDocs/BVSD%20Heatherwood%20ES%20DAT%20Mtg%2001_180822.pdf
September 10, 2018 | 2:45 - 4:45 p.m.https://bond.bvsd.org/projects/Heatherwood/Lists/DAT Meetings List/DispForm.aspx?ID=2https://bond.bvsd.org/projects/Heatherwood/Lists/DAT Meetings List/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}September 10, 2018 | 2:45 - 4:45 p.m.https://bond.bvsd.org/projects/Heatherwood/DATMeetingDocs/BVSD%20Heatherwood%20ES%20DAT%20Mtg%2002_180910.pdf, https://bond.bvsd.org/projects/Heatherwood/DATMeetingDocs/BVSD%20Heatherwood%20ES%20DAT%20Mtg%2002_180910.pdf
September 24, 2018 | 2:45 - 4:45 p.m.https://bond.bvsd.org/projects/Heatherwood/Lists/DAT Meetings List/DispForm.aspx?ID=1https://bond.bvsd.org/projects/Heatherwood/Lists/DAT Meetings List/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}September 24, 2018 | 2:45 - 4:45 p.m.https://bond.bvsd.org/projects/Heatherwood/DATMeetingDocs/BVSD%20Heatherwood%20ES%20DAT%20Mtg%2003_180924.pdf, https://bond.bvsd.org/projects/Heatherwood/DATMeetingDocs/BVSD%20Heatherwood%20ES%20DAT%20Mtg%2003_180924.pdf

Timeline

 

 

Schematic Design | Aug. 2018https://bond.bvsd.org/projects/Heatherwood/Lists/Project Timeline/DispForm.aspx?ID=1https://bond.bvsd.org/projects/Heatherwood/Lists/Project Timeline/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}Schematic Design | Aug. 2018Completesuccess
Design Development | September 2018https://bond.bvsd.org/projects/Heatherwood/Lists/Project Timeline/DispForm.aspx?ID=2https://bond.bvsd.org/projects/Heatherwood/Lists/Project Timeline/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Design Development | September 2018Completeinfo
Construction Documents | November 2018https://bond.bvsd.org/projects/Heatherwood/Lists/Project Timeline/DispForm.aspx?ID=3https://bond.bvsd.org/projects/Heatherwood/Lists/Project Timeline/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Documents | November 2018Completesuccess
Bidding/Permitting | January 2019https://bond.bvsd.org/projects/Heatherwood/Lists/Project Timeline/DispForm.aspx?ID=4https://bond.bvsd.org/projects/Heatherwood/Lists/Project Timeline/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}Bidding/Permitting | January 2019Completewarning
Construction | Spring/Summer 2019https://bond.bvsd.org/projects/Heatherwood/Lists/Project Timeline/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Heatherwood/Lists/Project Timeline/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Construction | Spring/Summer 2019In Progressinfo

Images

Scope of Work

Facility Condition

  • Exterior building improvements such as repair/replace windows and doors and repair masonry
  • Replace roof
  • Replace interior doors
  • Improvements to interior finishes such as flooring, tile and paint
  • Asbestos abatement
  • Restroom renovations
  • Electrical system improvements
  • Repair/replace fixtures and equipment such as casework and kitchen equipment
  • Audio enhancement for every classroom
  • Building-wide air conditioning (amended Feb. 27, 2019

Program Compatibility

  • Renovations to address sound issues in open classrooms
  • Provide storage space
  • Provide adequate parking
  • Provide adequate Special Education space
  • Provide adequate space for full-day kindergarten
  • Provide adequate space for preschool 

Health and Physical Development

  • Upgrade playground equipment and surfacing

Safety and Security

  • Install electronic security controls
  • Install camera/intercom security system
  • Install security partitions

Sustainability

  • Upgrade HVAC controls
  • Upgrade lighting
  • Conduct retro-commissioning and repairs
  • Replace aged boilers with more efficient condensing type

Innovation

Heatherwood Elementary School is eligible to receive up to $200,000 in additional funds to implement facility improvements that support innovative teaching methods.