Fairview High Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=32https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=32{28e838a4-8015-4177-ac17-2576b5d1e514}Fairview High School1515 Greenbriar Boulevard Boulder, CO 80305https://www.fairviewhs.org/720.561.3100Phase 21971<img alt="" src="/projects/Project%20Profile%20Images/FairviewHS-photo-300x300.JPG" style="BORDER:0px solid;" />$22,944,285$800,000 included in budget

Latest Updates

 

 

Feb. 7 - 20, 2019 https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=44https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=44{28e838a4-8015-4177-ac17-2576b5d1e514}Feb. 7 - 20, 2019 The Fairview Bond project rolls along at a solid pace in various areas of the school. As you will note with the information below, the current construction activities that are taking place are similar to what was reported two weeks ago. A&P Construction is aiming toward President’s Weekend for another push before the next rush of activity during Spring Break in late March. Follow the link below for more details. https://docs.google.com/document/d/1klH-k9zT0huWASZRoVz822etEDpNlJvy_TrfZQowEIU/edit?usp=sharing, https://docs.google.com/document/d/1klH-k9zT0huWASZRoVz822etEDpNlJvy_TrfZQowEIU/edit?usp=sharing
7 al 20 de febrero, 2019 https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=43https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=43{28e838a4-8015-4177-ac17-2576b5d1e514}7 al 20 de febrero, 2019 El proyecto del bono de Fairview sigue en marcha sin interrupciones en varias partes de la escuela. Como podrán observar al leer la siguiente información, las actividades de construcción que están en proceso ahora son similares a las que reportamos hace dos semanas. A&P Construction tiene previsto usar el fin de semana del Día de los Presidentes para lograr más trabajo antes del ajetreo de las vacaciones de primavera en marzo. https://docs.google.com/document/d/1q2IH0d7jyMLwKfM0vrgQHcmgaIGleDXZS5OvVZzPaRc/edit?usp=sharing, https://docs.google.com/document/d/1q2IH0d7jyMLwKfM0vrgQHcmgaIGleDXZS5OvVZzPaRc/edit?usp=sharing
Construction Kick-off Letter to Families and Staffhttps://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=20https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=20{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Letter to Families and Staffhttps://docs.google.com/document/d/1Rpi-tzNRnJcLm-UlAU7njqiV0TJy_8coA3pe3W8z1fQ/edit?usp=sharing, https://docs.google.com/document/d/1Rpi-tzNRnJcLm-UlAU7njqiV0TJy_8coA3pe3W8z1fQ/edit?usp=sharing
Construction Kick-off Post Card to Neighborshttps://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=19https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Post Card to Neighborshttps://bond.bvsd.org/projects/Fairview/Documents/Fairview%20construction%20start%20notification%20postcard%20text%20web%20-%20neighbor.pdf, http://bond.bvsd.org/projects/Fairview/Documents/Fairview%20construction%20start%20notification%20postcard%20text%20web%20-%20neighbor.pdf

​      

 

 

4 al 17 de octubre del 2018https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=29https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=29{28e838a4-8015-4177-ac17-2576b5d1e514}4 al 17 de octubre del 2018La construcción ha progresado mucho en la escuela preparatoria Fairview durante este último mes, y esperamos que las próximas semanas sigan igual. Los estudiantes y el personal se han acostumbrado a la actividad diaria en el campus escolar, y los alabamos por su paciencia y flexibilidad mientras el proyecto sigue avanzando sin tregua. Como siempre, se escuchará ruido de vez en cuando (de los taladros y las sierras) en varias partes de la escuela, principalmente en el auditorio. Se están haciendo todos los esfuerzos para minimizar la interrupción de las rutinas diarias de la escuela y mantener un ambiente escolar seguro y protegido. https://docs.google.com/document/d/14i4JSinrfPtfRKUy2tbiuk23PACiBnMXF-EsDxkoq84/edit?usp=sharing, https://docs.google.com/document/d/14i4JSinrfPtfRKUy2tbiuk23PACiBnMXF-EsDxkoq84/edit?usp=sharing
Generalidades para el 8 al 28 de noviembre, 2018https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=33https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=33{28e838a4-8015-4177-ac17-2576b5d1e514}Generalidades para el 8 al 28 de noviembre, 2018Estamos a comienzos de noviembre y el proyecto de construcción del bono sigue progresando sin contratiempos en la Escuela preparatoria Fairview. Excluyendo el auditorio y el nivel 500, las áreas en que se ha trabajado durante los últimos meses están siendo ocupados ahora por los estudiantes y/o el personal. Mientras nos vamos acercando a la «temporada festiva» del año escolar, hay que notar que el contratista aumentará la cantidad de trabajo que hará cuando los estudiantes y el personal no están en el edificio, lo cual limitará acceso a varios lugares en la escuela.https://docs.google.com/document/d/1ODdHftH90kLkfAyV4VsQOE3TT0QwMj_ZuBD5PAFCqMc/edit?usp=sharing, https://docs.google.com/document/d/1ODdHftH90kLkfAyV4VsQOE3TT0QwMj_ZuBD5PAFCqMc/edit?usp=sharing
29 de noviembre al 12 de diciembre, 2018https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=36https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=36{28e838a4-8015-4177-ac17-2576b5d1e514}29 de noviembre al 12 de diciembre, 2018Las actividades de construcción siguen sin demoras aquí en la Escuela Preparatoria Fairview y se anticipa que casi todas las áreas estarán completas según lo previsto. Gracias a la ausencia de los estudiantes y el personal durante el descanso para el Día de Acción de Gracias, A&P Construction logró mucho progreso en varias de las áreas bajo construcción. Anticipamos disponer de esta misma ventaja durante el inminente descanso de invierno. Como se ha detallado abajo, algunas áreas volverán a operaciones normales a finales de enero (por ej., el auditorio y algunos salones en el nivel 500) mientras que otras áreas (Artes, salones de pesas) no estarán disponibles por un tiempo. https://docs.google.com/document/d/1pUUWg1MXHPOe3JThVp7a9bgSWa80hm7MZhhJyFAMkz0/edit?usp=sharing, https://docs.google.com/document/d/1pUUWg1MXHPOe3JThVp7a9bgSWa80hm7MZhhJyFAMkz0/edit?usp=sharing
19 de septiembre al 3 de octubre, 2018https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=27https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=27{28e838a4-8015-4177-ac17-2576b5d1e514}19 de septiembre al 3 de octubre, 2018El trabajo sigue adelante aquí en la escuela preparatoria Fairview y varias áreas han progresado mucho durante las últimas semanas. Un ejemplo del progreso es que se ha completado el trabajo en la nueva cocina, junto con los grupos de baños de al lado, y estas áreas están ahora disponibles para los estudiantes y empleados... ¡Y se ven geniales! Como les informamos anteriormente, las renovaciones de los niveles 100, 300, 500 y 800 están en camino a completarse a mediados o fines de octubre. El área del auditorio deberá estar completa para finales de diciembre. A pesar del trabajo (cortando, taladrando) que se está realizando de vez en cuando en partes de la escuela durante el día, se están haciendo todos los esfuerzos por minimizar la interrupción a las rutinas diarias de la escuela y mantener un ambiente escolar seguro y protegido. https://docs.google.com/document/d/1G6bgJOMN-nSiTptpcCzUv4J1GOTIt4s89nyMoIeG4fg/edit?usp=sharing, https://docs.google.com/document/d/1G6bgJOMN-nSiTptpcCzUv4J1GOTIt4s89nyMoIeG4fg/edit?usp=sharing
Generalidades para el 18 al 31 de octubre, 2018https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=31https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=31{28e838a4-8015-4177-ac17-2576b5d1e514}Generalidades para el 18 al 31 de octubre, 2018La construcción aquí en Fairview ha continuado sin contratiempos durante los últimos días, y muchos espacios se han terminado o se anticipan terminarse en las próximas semanas. Para su información, tenemos reuniones todas las semanas (llamadas reuniones entre dueños, arquitectos y contratistas o reuniones OAC, por sus siglas en inglés), para revisar todos los aspectos del proyecto. Bien si están investigando soluciones a posibles problemas, planeando el trabajo que todavía falta o coordinando con la escuela para minimizar interrupciones a las actividades escolares, todos los participantes están enfocados en mantener a la escuela segura y operando con normalidad durante las actividades de construcción. https://docs.google.com/document/d/1O7215cUy2h8ebD0yCNVQLmaK4pWW4-_u_IRABJnTlLg/edit?usp=sharing, https://docs.google.com/document/d/1O7215cUy2h8ebD0yCNVQLmaK4pWW4-_u_IRABJnTlLg/edit?usp=sharing
10 al 23 de enero, 2019https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=40https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=40{28e838a4-8015-4177-ac17-2576b5d1e514}10 al 23 de enero, 2019A&P Construction logró progresar mucho durante las vacaciones de invierno y el trabajo continúa a toda velocidad aquí en la escuela preparatoria Fairview. Un par de clases se han movido para acomodar el trabajo que se hará durante el segundo semestre (Artes), mientras que otras áreas están casi por terminarse (El Centro para la vida universitaria y profesional, consejería y el nivel 300). Durante el transcurso del próximo semestre, el enfoque del trabajo será en completar el auditorio (previsto para mitades/finales de enero), remodelar varios de los baños y remodelar otras áreas de la escuela.https://docs.google.com/document/d/1jTk4lNFT2dkHf4kd2Qug8kPu2FMJ1ewWaqnFm4hTZ4k/edit?usp=sharing, https://docs.google.com/document/d/1jTk4lNFT2dkHf4kd2Qug8kPu2FMJ1ewWaqnFm4hTZ4k/edit?usp=sharing
24 de enero al 6 de febrero, 2019https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=41https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=41{28e838a4-8015-4177-ac17-2576b5d1e514}24 de enero al 6 de febrero, 2019El trabajo continúa sin contratiempos aquí en la escuela preparatoria Fairview y el proyecto de construcción se extenderá a otras secciones de la escuela este semestre. Ayer logramos alcanzar un hito importante del desarrollo. ¡Comenzamos a mover los materiales y el equipo de REGRESO al auditorio recién renovado y a las áreas de almacenamiento! Tengan presente que el grupo de teatro de Fairview, el coro, la banda y otros grupos usarán el auditorio como es normal durante los próximos días (aunque se ha demorado la instalación de la alfombra en las escaleras del auditorio hasta que se termine de instalar la iluminación permanente de los pasillos) y las presentaciones de la primavera siguen programadas según los tiempos acordados. Hasta que se entreguen e instalen las luces permanentes en el piso de los pasillos, se instalará iluminación temporal en los asientos del pasillo. http://https://docs.google.com/document/d/1w7UYqPqUyauJerNxXDgpVsdf1hcCcDBUfXtF0q7mSrQ/edit?usp=sharing, http://https://docs.google.com/document/d/1w7UYqPqUyauJerNxXDgpVsdf1hcCcDBUfXtF0q7mSrQ/edit?usp=sharing
3 al 17 de septiembre del 2018https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=26https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=26{28e838a4-8015-4177-ac17-2576b5d1e514}3 al 17 de septiembre del 2018Después de un largo verano de trabajo, el proyecto de renovación en la escuela preparatoria Fairview, financiado usando bonos, pasará a la siguiente fase de construcción en otoño. Queremos dar un GRAN reconocimiento a la administración de Fairview, al personal y a la compañía de construcción A&P por la flexibilidad y el arduo trabajo que efectuaron para lograr que la escuela abriera sus puertas a los estudiantes el 15 de agosto. . . ¡Esta labor no fue fácil! Las renovaciones en los niveles 100, 300 y 800 avanzarán hacia la finalización en septiembre y octubre. Una cantidad de trabajo considerable se realizará en el nivel 500 durante el otoño. Se harán renovaciones a los grupos de baños durante la segunda mitad del año escolar. Solo un grupo a la vez estará fuera de servicio. Durante el día y las noches, se seguirá realizando trabajo continuamente. Como tal, se están haciendo todos los esfuerzos para minimizar la interrupción de las rutinas diarias de la escuela y mantener un ambiente escolar seguro y protegido.https://bond.bvsd.org/projects/Fairview/Documents/ES_Fairview_HS_-_Construction_Update_for_September_2018%20SPANISH%20VERSION.pdf, https://bond.bvsd.org/projects/Fairview/Documents/ES_Fairview_HS_-_Construction_Update_for_September_2018%20SPANISH%20VERSION.pdf
Noticias recientes sobre las obras Abril y mayo de 2018https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=22https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=22{28e838a4-8015-4177-ac17-2576b5d1e514}Noticias recientes sobre las obras Abril y mayo de 2018https://docs.google.com/document/d/1_FFKUW8uXEEVNLzo-8GRYCCtQZVvBbbJUpVQxmM5RfQ/edit?usp=sharing, https://docs.google.com/document/d/1_FFKUW8uXEEVNLzo-8GRYCCtQZVvBbbJUpVQxmM5RfQ/edit?usp=sharing
13 de diciembre, 2018 al 2 de enero, 2019https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=38https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=38{28e838a4-8015-4177-ac17-2576b5d1e514}13 de diciembre, 2018 al 2 de enero, 2019Ahora que se aproximan las vacaciones muy merecidas de invierno para los estudiantes y el personal, queremos comunicar nuestro gran aprecio por su apoyo durante el primer semestre del año escolar 2018-19. A pesar del trabajo que se está realizando en nuestra escuela, estamos cerrando el semestre con con una actitud positiva. ¡Esperamos que todos tengan un descanso maravilloso y relajante con su familia! Con relación a la construcción, se ha logrado una gran cantidad de trabajo en la Escuela preparatoria Fairview durante estas últimas semanas. También, las vacaciones de invierno le darán a A&P varias oportunidades para terminar hasta más trabajo mientras que el personal y los estudiantes están fuera del edificio. En ciertas áreas se derribará y trasladará los materiales y en otras comenzará la construcción inicial. Por último, varias áreas que no han estado disponibles por algunos meses están casi por terminarse (o están tan cerca que se pueden ocupar). https://docs.google.com/document/d/11vp58G0jQTqM_meqKDJ5KqgVpiA-OKBfGk2xZDCuC_k/edit?usp=sharing, https://docs.google.com/document/d/11vp58G0jQTqM_meqKDJ5KqgVpiA-OKBfGk2xZDCuC_k/edit?usp=sharing
October 4 - 17, 2018https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=30https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=30{28e838a4-8015-4177-ac17-2576b5d1e514}October 4 - 17, 2018There has been a lot of construction activity here at Fairview HS over the past month, and the weeks ahead will be no different. Students and staff have clearly become used to the daily “buzz” of activity around the campus, and we commend everyone for their patience and flexibility as the project moves along at a steady pace. As always, there will be occasional noise (drilling, cutting) coming from various parts of the school, mainly the auditorium. All efforts are being made to minimize disruption to the daily routines of the school and maintain a safe and secure school environment. Follow the link for specific details. https://docs.google.com/document/d/1D-JyBpO2CXfnEye3m18WyFGm4DDHroC7toQppGJFA50/edit?usp=sharing, https://docs.google.com/document/d/1D-JyBpO2CXfnEye3m18WyFGm4DDHroC7toQppGJFA50/edit?usp=sharing
November 8 - 28, 2018https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=34https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=34{28e838a4-8015-4177-ac17-2576b5d1e514}November 8 - 28, 2018The Bond construction project here at Fairview HS continues to progress smoothly as we enter the month of November. Outside of the auditorium and the 500 level, spaces that have seen work over the past several months are now occupied and being used by both students and/or staff. As we approach the “holiday season” of the school year, note that the contractor will ramp up their work during times when students and staff are not in the building, limiting access to various sites around the school. Follow the link for more details. https://docs.google.com/document/d/1U_UAp1BlDnnbRbhlXWMcs6GUCYTsx6TiShVZvUbIJVg/edit?usp=sharing, https://docs.google.com/document/d/1U_UAp1BlDnnbRbhlXWMcs6GUCYTsx6TiShVZvUbIJVg/edit?usp=sharing
November 29 - December 12, 2018https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=35https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=35{28e838a4-8015-4177-ac17-2576b5d1e514}November 29 - December 12, 2018Construction activity continues to move along on schedule here at Fairview High School with most areas on (or close to on) schedule. With the past Thanksgiving break free of students and staff, A&P Construction was able to make a great deal of headway in several areas. We are anticipating the same kind of construction progress with the upcoming Winter Break. As detailed below, a few areas will be coming back online in late January (ex: auditorium, some 500 level classrooms) while other areas (Art, Weight/Mat rooms) will be taken off-line for a while. https://docs.google.com/document/d/11Vfz1H2nIkdbUj3YfeYgDLsBCkqCFkR4z10U4qH3uOk/edit?usp=sharing, https://docs.google.com/document/d/11Vfz1H2nIkdbUj3YfeYgDLsBCkqCFkR4z10U4qH3uOk/edit?usp=sharing
June 2018https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=23https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}June 2018The first summer of construction work here at Fairview High School has seen an invasion of workers as A&P Construction and their subcontractors have descended on the school to complete several early phases of work. Please note that the school building is completely off-limits to students and staff except for the weight room (which is only accessible through one door on the east side of the school). Please follow the link for specific details. https://docs.google.com/document/d/12yZWf9DbqhU0Gt0-8NInjq-KShjsJzGP548vgm4NoMw/edit?usp=sharing, https://docs.google.com/document/d/12yZWf9DbqhU0Gt0-8NInjq-KShjsJzGP548vgm4NoMw/edit?usp=sharing
December 13, 2018 - January 2, 2019https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=37https://bond.bvsd.org/projects/Fairview/Lists/Latest Updates/DispForm.aspx?ID=37{28e838a4-8015-4177-ac17-2576b5d1e514}December 13, 2018 - January 2, 2019A great deal of work has taken place around Fairview High School these past few weeks. In addition, the upcoming Winter Break will afford A&P several opportunities to get even more done while staff and students are out of the building. There will be moving/demolition of some areas, initial construction in others. Finally, several areas are nearing completion (or near enough for use) that have been offline for several months. Follow the link for specific details. https://docs.google.com/document/d/157gJRTzHI0Y7hYl1oRD4jWFTvTbH7WhX_X-NRgdU6gM/edit?usp=sharing, https://docs.google.com/document/d/157gJRTzHI0Y7hYl1oRD4jWFTvTbH7WhX_X-NRgdU6gM/edit?usp=sharing

Project Details

Project Team
Project Manager

 

 

Steve Schumacherhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}Steve Schumachersteve.schumacher@bvsd.org720-561-5270mailto:steve.schumacher@bvsd.org, mailto:steve.schumacher@bvsd.org

Architect

 

 

RTA Architectshttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}RTA Architectshttp://www.rtaarchitects.com, http://www.rtaarchitects.com

Contractor

 

 

Adolfson & Peterson Constructionhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}Adolfson & Peterson Constructionhttp://www.a-p.com, http://www.a-p.com

Related Resources

 

 

Educational Facilities Master Planhttps://bond.bvsd.org/projects/Fairview/Lists/Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Fairview/Lists/Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttps://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=45, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=45page

Details
Project Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=32https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=32{28e838a4-8015-4177-ac17-2576b5d1e514}$22,944,285

Innovation Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=32https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=32{28e838a4-8015-4177-ac17-2576b5d1e514}$800,000 included in budget

Bond Expenditures

 

 

Fairview High Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=32https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=32{28e838a4-8015-4177-ac17-2576b5d1e514}Fairview High Schoolhttps://bond.bvsd.org/financial/Documents/CurrentProgramExpenditures.pdf, Bond Program Expenditures

Project Expenditures

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=32https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=32{28e838a4-8015-4177-ac17-2576b5d1e514}https://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=32https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=32{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Energy Efficiency/Green Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=32https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=32{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClass75EC30FB3257429BBE610D54731F7260"><div><div>To improve energy efficiency, a <a href="/green/Pages/Energy-Efficiency-Glossary.aspx">deep energy retrofit </a>was performed on the building as part of the renovation work. Overall energy efficiency is predicted to improve substantially.  <br></div><div><br></div><div><a href="https://sites.google.com/bvsd.org/energy/2014-bond?authuser=0"><strong>Check out </strong></a>the energy use predictions<br></div><div><a href="https://drive.google.com/file/d/0B7mWrvWeY7DtS2xPQS1peHljd1k/view" style="text-decoration-line:underline;"><img src="/projects/PublishingImages/DeepEnergyLink.JPG" alt="" style="margin:5px;width:300px;" /></a><br></div><div><br></div><div><strong><a href="https://youtu.be/dMftjNETKEI">Learn more </a></strong>about how BVSD is improving energy efficiency in our buildings. <br></div><br><br><br></div></div>

Educational Innovation Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=32https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=32{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClass828C6D159E164B74A0857591A0AE0C69"><div>The Fairview High School Innovation project will create a dynamic learning environment for Language Arts classes that all students will access for four years. This will provide an entire wing of 21st-century classroom spaces that will enhance learning through collaborative instruction for students and collaborative teaching practices. The project aligns with two of BVSD's six <a href="http://bvsdsuccesseffect.org/educational-innovation/">Innovation Guiding Principles</a>: Learning is Founded in Inquiry and Learning is a Social Process.</div><div><br></div><div><strong><a href="/educational-innovation/Pages/Fairview-High-School.aspx">Learn more</a></strong><br><br></div></div>

Design Advisory Team

​The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.​ 

Staff 

Ross Sutter, Assistant Principal
Rebecca Feeney, Art Teacher
Rod Beauchamp, PE/Health/Athletics
Don Stensrud, Principal
Ashley Houston, Counseling
Sarah DiGiacomo, Assistant Principal
Emily Cosmos, Language Arts

Parents

Taryl Smith

  
​​Community​

Richard Sanchez

Related Resources

 

 

Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/Fairview/Lists/DAT Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Fairview/Lists/DAT Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf, http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdfpage

DAT Meeting Schedule

DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting. ​​

 

 

March 15, 2017https://bond.bvsd.org/projects/Fairview/Lists/DAT Meetings List/DispForm.aspx?ID=1https://bond.bvsd.org/projects/Fairview/Lists/DAT Meetings List/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}March 15, 2017https://bond.bvsd.org/projects/Fairview/DATMeetingDocs/17014C001mtr-DAT%201%20meeting%20notes_20170315.pdf, http://bond.bvsd.org/projects/Fairview/DATMeetingDocs/17014C001mtr-DAT%201%20meeting%20notes_20170315.pdf
April 4, 2017https://bond.bvsd.org/projects/Fairview/Lists/DAT Meetings List/DispForm.aspx?ID=2https://bond.bvsd.org/projects/Fairview/Lists/DAT Meetings List/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}April 4, 2017https://bond.bvsd.org/projects/Fairview/DATMeetingDocs/17014C002mtr-DAT%202%20meeting%20notes_20170404.pdf, http://bond.bvsd.org/projects/Fairview/DATMeetingDocs/17014C002mtr-DAT%202%20meeting%20notes_20170404.pdf
April 18, 2017https://bond.bvsd.org/projects/Fairview/Lists/DAT Meetings List/DispForm.aspx?ID=3https://bond.bvsd.org/projects/Fairview/Lists/DAT Meetings List/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}April 18, 2017https://drive.google.com/file/d/0B7K4Mg7ksRAPbS1KM2xJdnRWY0E/view?usp=sharing, https://drive.google.com/file/d/0B7K4Mg7ksRAPbS1KM2xJdnRWY0E/view?usp=sharing
May 2, 2017https://bond.bvsd.org/projects/Fairview/Lists/DAT Meetings List/DispForm.aspx?ID=4https://bond.bvsd.org/projects/Fairview/Lists/DAT Meetings List/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}May 2, 2017
May 16, 2017https://bond.bvsd.org/projects/Fairview/Lists/DAT Meetings List/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Fairview/Lists/DAT Meetings List/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}May 16, 2017https://drive.google.com/file/d/0B7K4Mg7ksRAPRXUtbk1SaFdYejA/view?usp=sharing, https://drive.google.com/file/d/0B7K4Mg7ksRAPRXUtbk1SaFdYejA/view?usp=sharing
May 30, 2017https://bond.bvsd.org/projects/Fairview/Lists/DAT Meetings List/DispForm.aspx?ID=6https://bond.bvsd.org/projects/Fairview/Lists/DAT Meetings List/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}May 30, 2017https://drive.google.com/file/d/0B7K4Mg7ksRAPWVVmX1RfYjh4Skk/view?usp=sharing, https://drive.google.com/file/d/0B7K4Mg7ksRAPWVVmX1RfYjh4Skk/view?usp=sharing

Timeline

 

 

Schematic Design | May 2017https://bond.bvsd.org/projects/Fairview/Lists/Project Timeline/DispForm.aspx?ID=1https://bond.bvsd.org/projects/Fairview/Lists/Project Timeline/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}Schematic Design | May 2017Completesuccess
Design Development | August 2017https://bond.bvsd.org/projects/Fairview/Lists/Project Timeline/DispForm.aspx?ID=2https://bond.bvsd.org/projects/Fairview/Lists/Project Timeline/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Design Development | August 2017Completesuccess
Construction Documents | December 2017https://bond.bvsd.org/projects/Fairview/Lists/Project Timeline/DispForm.aspx?ID=3https://bond.bvsd.org/projects/Fairview/Lists/Project Timeline/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Documents | December 2017Completesuccess
Bidding | Dec. 2017 - Jan. 2018https://bond.bvsd.org/projects/Fairview/Lists/Project Timeline/DispForm.aspx?ID=4https://bond.bvsd.org/projects/Fairview/Lists/Project Timeline/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}Bidding | Dec. 2017 - Jan. 2018Completewarning
Construction | March 2018 - August 2019https://bond.bvsd.org/projects/Fairview/Lists/Project Timeline/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Fairview/Lists/Project Timeline/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Construction | March 2018 - August 2019In Progressinfo

Images

    There are no items to show in this view of the "Construction Images" list.

    Scope of Work

    Facility Condition

    • Exterior building improvements such as repair/replace windows and doors
    • Replace roof
    • Restroom renovations
    • Replace interior doors
    • Repair/replace fixtures such as bleachers and lockers
    • Improvements to interior finishes such as carpet, flooring, ceiling tile and paint
    • Asbestos abatement
    • HVAC system improvements
    • Electrical system improvements
    • Fire protection system improvements
    • Remodel kitchen and cafeteria
    • Remodel auditorium
    • Audio enhancement in every classroom**

    Health and Physical Development

    • Modernize weight room
    • Provide multi-purpose room
    • Provide press box

    Safety and Security

    • Install security partitions
    • Install camera/intercom security system
    • Install electronic security control
    • Replace intercom system
    • Install interior security cameras (amended May 8, 2018)

    Sustainability

    • Upgrade HVAC controls
    • Upgrade lighting

    Innovation

    Fairview High School is eligible to receive up to $800,000 in additional funds to implement facility improvements that support innovative teaching methods.

    ** Not included in project budget