District-wide Support Campushttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=4https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}District-wide Support Campus6500 East Arapahoe Road Boulder, CO 80303www.bvsd.org720-561-5062Phase 1, 2, 31963<img alt="" src="/PublishingImages/BVSD%20book%20alone%20dark%20blue.png" width="4236" style="BORDER:0px solid;" />See breakout by project under Scope of WorkN/A

Latest Updates

Education Center Closed Until Aug. 17

​The BVSD Education Center will remain closed for the rest of the school year and over the summer. Employees will continue to work remotely or may move to another district location as the district transitions back to normal operations in the coming months. Email is the best way to reach district staff. Staff members also have access to voicemail on their office phones, and the district receptionist is continuing to assist callers on the district’s mainline at 303.447.1010. 

Board meetings will continue to be held virtually and can be viewed live on BV22. Check out the Board of Education page on the district website for more information about the virtual meetings. 

The extended closure aligns with current guidance to maintain social distancing and will provide additional time for construction crews to complete renovations and construction of the addition to the building. The Education Center is scheduled to reopen to the public on Aug. 17. Construction will continue on the new addition into the fall, with substantial completion expected in October.

Ed Center Logistics May 2020.JPG

 

 

Culinary Centerhttps://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=61https://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=61{28e838a4-8015-4177-ac17-2576b5d1e514}Culinary CenterJune 2020 | The Culinary Center is in the final stages of construction. The final certificate of occupancy has been issued and the punch list of final items to complete is in progress. Deliveries and recipe testing will begin in July.
Education Centerhttps://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=60https://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=60{28e838a4-8015-4177-ac17-2576b5d1e514}Education CenterJune 2020 | JHL Constructors is making great progress. In the 1972 addition, interior demolition and asbestos abatement are underway in some areas. Painting has started in other areas as well. The link building is scheduled to be demolished late this month. On the exterior of the 2-story addition, windows are being installed, along with metal siding. Inside, drywall installation and painting are underway.
Check out the plans for the Ed Center renovation!https://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=29https://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=29{28e838a4-8015-4177-ac17-2576b5d1e514}Check out the plans for the Ed Center renovation!https://drive.google.com/file/d/0B6ygZ9WZL67uNUNQeDhEbHFzQ09lSGJXeDRKQ0RmaG5SOW1z/view?usp=sharing, https://bond.bvsd.org/projects/DWSC/Documents/20181125%20BVSD%20Open%20House%20PRINTS-sm.pdf

 

 

Central Kitchenhttps://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=48https://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=48{28e838a4-8015-4177-ac17-2576b5d1e514}Central KitchenOctober 2019 | The structure is steadily moving toward being fully enclosed with the exterior walls and roof in place. Windows and doors will be installed in the coming weeks. The project is on track to be complete next spring with the kitchen operational for the 2020-21 school year.
Warehouse, Administrative Offices, and Professional Development Centerhttps://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=49https://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=49{28e838a4-8015-4177-ac17-2576b5d1e514}Warehouse, Administrative Offices, and Professional Development CenterOctober 2019 | The east half of the Ed Center has been demolished and work on the foundation for the new wing is underway. Drilling and pouring concrete for caissons will occur in the first half of November, weather permitting. Please see the map above for the adjusted logistics during construction and be aware that parking is limited. Thank you for your patience and understanding.
Administrative Offices and Professional Development Centerhttps://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=52https://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=52{28e838a4-8015-4177-ac17-2576b5d1e514}Administrative Offices and Professional Development CenterFebruary 2020 | Construction at the Ed Center is moving ahead rapidly with visible progress daily. In order to complete the new wing and renovations to the 1972 addition by October, the construction schedule is being accelerated. As such, the Ed Center (1972 addition) will be closed from May 22 to Aug. 16 for renovation and will re-open on August 17. The new two-story wing of the Ed Center will be complete and ready for occupancy in October. Temporary relocation plans for staff while work is completed are still being developed and will be provided when finalized. The May 26, June 9, June 23, and August 11 Board meetings will be held at an alternate location which has yet to be determined.
Warehouse, Administrative Offices, and Professional Development Centerhttps://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=46https://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=46{28e838a4-8015-4177-ac17-2576b5d1e514}Warehouse, Administrative Offices, and Professional Development CenterSeptember 2019 | Demolition of the east wing has started and should take about a month to complete. The PDC/board room is open and hosting meetings. Visitors to the Education Center should use the driveway west of the main traffic light entrance and park on the west side of the building.
Central Kitchenhttps://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=47https://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=47{28e838a4-8015-4177-ac17-2576b5d1e514}Central KitchenSeptember 2019 | Exterior walls have been constructed and the roof will be attached in the coming weeks. The project is on track for completion next spring.
Culinary Centerhttps://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=53https://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=53{28e838a4-8015-4177-ac17-2576b5d1e514}Culinary CenterFebruary 2020 | Interior construction continues with crews working on plumbing, electrical, and mechanical rough-ins, along with drywall and ceiling grid installation. Construction of exterior dry and cooler storage continues. The project is on track to be complete this spring with the kitchen operational for the 2020-21 school year. ​
Central Kitchenhttps://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=26https://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=26{28e838a4-8015-4177-ac17-2576b5d1e514}Central KitchenNovember 2018 | On October 17, 2018, the Citizens' Bond Oversight Committee approved augmenting the Central Kitchen project budget with $2.8 million of bond premium funds to meet construction cost estimates. Construction is expected to begin in the coming weeks. https://docs.google.com/presentation/d/1AnF8Xmyf0rp7hvj01nzNwjt2jIUu8rd8gx6y6-X4rQo/edit?usp=sharing, https://docs.google.com/presentation/d/1AnF8Xmyf0rp7hvj01nzNwjt2jIUu8rd8gx6y6-X4rQo/edit?usp=sharing
Warehouse, Administrative Offices and Professional Learning Centerhttps://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=27https://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=27{28e838a4-8015-4177-ac17-2576b5d1e514}Warehouse, Administrative Offices and Professional Learning CenterNovember 2018 | The architects are finalizing the schematic design. Construction is anticipated to begin in spring/summer of 2019. Boulder Commercial Interiors has been selected as the furniture vendor and is working with the Furniture Steering Committee to plan and select furniture. A relocation consultant has been hired to develop transition plans. https://docs.google.com/document/d/1xNaOjZX7EDqBBVa6sHVYM8yz8y01KLcbIM33W9XRZyA/edit?usp=sharing, https://docs.google.com/document/d/1xNaOjZX7EDqBBVa6sHVYM8yz8y01KLcbIM33W9XRZyA/edit?usp=sharing
Culinary Centerhttps://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=54https://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=54{28e838a4-8015-4177-ac17-2576b5d1e514}Culinary CenterMarch 2020 | Interior and exterior work continues. Administrative staff are scheduled to move into the offices in April. The project is on track to be complete this spring with the kitchen operational for the 2020-21 school year. ​
Administrative Officeshttps://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=55https://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=55{28e838a4-8015-4177-ac17-2576b5d1e514}Administrative OfficesMarch 2020 | Construction at the Ed Center is moving ahead rapidly with visible progress daily. The support structure is in place and crews are working on interior framing and systems. In order to complete the new wing and renovations to the 1972 addition by October, the construction schedule is being accelerated. As such, the Ed Center (1972 addition) will be closed from May 22 to Aug. 16 for renovation and will re-open on August 17. The new two-story wing of the Ed Center will be complete and ready for occupancy in October. Temporary relocation plans for staff while work is completed are still being developed and will be provided when finalized. The May 26, June 9, June 23, and August 11 Board meetings will be held at an alternate location which has yet to be determined.
Ed Center Information Session | March 5, 3:30-4:30https://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=34https://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=34{28e838a4-8015-4177-ac17-2576b5d1e514}Ed Center Information Session | March 5, 3:30-4:30An information session will be held March 5, 3:30-4:30 p.m. in the PDC Aspen room. Project team members (architect, furniture vendor, contractor, relocation specialist) will give a presentation at 3:30 and be available to answer questions afterward. Meeting materials will be emailed to staff following the meeting.
Central Kitchenhttps://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=35https://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=35{28e838a4-8015-4177-ac17-2576b5d1e514}Central KitchenMarch 2019 | The project team has been working to relocate fiber optic and utility lines. Activity will pick up in March, and we will likely see the demolition of the Transportation building.
Warehouse, Administrative Offices, and Professional Learning Centerhttps://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=33https://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=33{28e838a4-8015-4177-ac17-2576b5d1e514}Warehouse, Administrative Offices, and Professional Learning CenterMarch 2019 | The Ed Center renovation plans are moving into the final stages of design. The project is on track to start construction this spring and be complete by December 2020. The furniture committee has worked with the furniture vendor to develop several office and cubicle layout options. Prototype layouts will be set up in various locations in the Ed Center in the coming weeks for staff to see. The selected color palette also will be on display with the layouts. Follow the link for more information. https://docs.google.com/document/d/1PHTWvnZCTCeIp7O_twwCntLwZftyTbEdBiWsHg9kR40/edit?usp=sharing, https://docs.google.com/document/d/1PHTWvnZCTCeIp7O_twwCntLwZftyTbEdBiWsHg9kR40/edit?usp=sharing
Education Center Schematic Design Gallery Walk | Nov. 27, 3-5 p.m., Building for Student Successhttps://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=28https://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=28{28e838a4-8015-4177-ac17-2576b5d1e514}Education Center Schematic Design Gallery Walk | Nov. 27, 3-5 p.m., Building for Student SuccessThe schematic design for the major renovation of the Education Center will be on display at the Building for Student Success offices at Arapahoe Campus for employees to view and provide feedback. Follow the link for a map. https://drive.google.com/file/d/0B9YXu0BD9JOTY180Zml4czBhWms/view?usp=sharing, https://drive.google.com/file/d/0B9YXu0BD9JOTY180Zml4czBhWms/view?usp=sharing
Administrative Offices and Professional Development Centerhttps://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=50https://bond.bvsd.org/projects/DWSC/Lists/Latest Updates/DispForm.aspx?ID=50{28e838a4-8015-4177-ac17-2576b5d1e514}Administrative Offices and Professional Development CenterDecember 2019 | Work on the foundation for the new wing is underway. Drilling and pouring concrete for caissons is underway. Please see the map above for the adjusted logistics during construction and be aware that parking is limited. Thank you for your patience and understanding.

Project Details

Project Team
Project Manager

 

 

Steve Schumacherhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}Steve Schumachersteve.schumacher@bvsd.org720-561-5270mailto:steve.schumacher@bvsd.org, mailto:steve.schumacher@bvsd.org

Architect

 

 

RNL https://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}RNL http://www.rnldesign.com/, http://www.rnldesign.com/

Contractor

 

 

JHLhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=39{28e838a4-8015-4177-ac17-2576b5d1e514}JHLhttp://www.jhlconstructors.com/, http://www.jhlconstructors.com/

Related Resources

 

 

Educational Facilities Master Planhttps://bond.bvsd.org/projects/DWSC/Lists/Related Resources/DispForm.aspx?ID=4https://bond.bvsd.org/projects/DWSC/Lists/Related Resources/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttps://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=79, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=79page

Details
Project Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=4https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}See breakout by project under Scope of Work

Innovation Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=4https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}N/A

Bond Expenditures

 

 

https://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Project Expenditures

 

 

https://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=4https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClass38CA90646CC444108742C21BD5AC2864"><div>Under development</div></div>

Energy Efficiency/Green Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=4https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClass74CD831D02F9462EA5754D366540EDB0"><div>Under development</div></div>

Educational Innovation Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=4https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClassCE157B45ACF84793A8B21392C8F314E8"><div>Under development</div></div>

Design Advisory Team

The Design Advisory Team (DAT) team includes district staff members who will work with the architects to develop the design for the project.​ 

​Staff

Rob Anderson, Superintendent
Laura Shafer, Executive Assistant to the Superintendent and Board of Education
Sam Messier, Assistant Superintendent of Instructional Services and Equity
Rob Price, Assistant Superintendent of Operational Services
Kim Mann, Executive Assistant to the Assistant Superintendent of Operational Services
Susan Cousins, Bond Communications Specialist
Mike Gradoz, Assistant Superintendent of Human Resources
Vivian Campbell, Human Resources Manager
Randy Barber, Chief Communications Officer
Andrew Moore, Chief Information Officer
Robbyn Fernandez, Assistant Superintendent of Schools - Elementary

Parents

​​Community

Related Resources

 

 

DAT Guidelines - Revised 2015https://bond.bvsd.org/projects/DWSC/Lists/DAT Related Resources/DispForm.aspx?ID=4https://bond.bvsd.org/projects/DWSC/Lists/DAT Related Resources/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}DAT Guidelines - Revised 2015https://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf, http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdfdownload

DAT Meeting Schedule

DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting.  Additional meetings (noted below) will be held for the Ed Center renovation project. 

 

 

Education Center DAT | June 6, 2018, 3:30 - 5:30 p.m.https://bond.bvsd.org/projects/DWSC/Lists/DAT Meetings List/DispForm.aspx?ID=18https://bond.bvsd.org/projects/DWSC/Lists/DAT Meetings List/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}Education Center DAT | June 6, 2018, 3:30 - 5:30 p.m.https://bond.bvsd.org/projects/DWSC/DATMeetingDocs/2018_0606%20DAT-1%20Admin%20Meeting%20Minutes.pdf, https://bond.bvsd.org/projects/DWSC/DATMeetingDocs/2018_0606%20DAT-1%20Admin%20Meeting%20Minutes.pdfhttps://bond.bvsd.org/projects/DWSC/DATMeetingDocs/20180606-DAT%201%20BVSD%20Admin%20Workspace-FINAL%20WEB.pdf, https://bond.bvsd.org/projects/DWSC/DATMeetingDocs/20180606-DAT%201%20BVSD%20Admin%20Workspace-FINAL%20PRINTreduced.pdf
Education Center Department Heads | June 13, 2018https://bond.bvsd.org/projects/DWSC/Lists/DAT Meetings List/DispForm.aspx?ID=19https://bond.bvsd.org/projects/DWSC/Lists/DAT Meetings List/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}Education Center Department Heads | June 13, 2018
Education Center Department Heads | June 27, 2018https://bond.bvsd.org/projects/DWSC/Lists/DAT Meetings List/DispForm.aspx?ID=20https://bond.bvsd.org/projects/DWSC/Lists/DAT Meetings List/DispForm.aspx?ID=20{28e838a4-8015-4177-ac17-2576b5d1e514}Education Center Department Heads | June 27, 2018
Education Center DAT | August 1, 2018, 3:30 - 5:30 p.m.https://bond.bvsd.org/projects/DWSC/Lists/DAT Meetings List/DispForm.aspx?ID=21https://bond.bvsd.org/projects/DWSC/Lists/DAT Meetings List/DispForm.aspx?ID=21{28e838a4-8015-4177-ac17-2576b5d1e514}Education Center DAT | August 1, 2018, 3:30 - 5:30 p.m.https://bond.bvsd.org/projects/DWSC/DATMeetingDocs/2018_0803%20DAT-2%20Meeting%20Minutes.pdf, https://bond.bvsd.org/projects/DWSC/DATMeetingDocs/2018_0803%20DAT-2%20Meeting%20Minutes.pdf
Education Center Board Room Work Session | September 18, 2018https://bond.bvsd.org/projects/DWSC/Lists/DAT Meetings List/DispForm.aspx?ID=26https://bond.bvsd.org/projects/DWSC/Lists/DAT Meetings List/DispForm.aspx?ID=26{28e838a4-8015-4177-ac17-2576b5d1e514}Education Center Board Room Work Session | September 18, 2018
Education Center Department Heads | November 8, 2018https://bond.bvsd.org/projects/DWSC/Lists/DAT Meetings List/DispForm.aspx?ID=25https://bond.bvsd.org/projects/DWSC/Lists/DAT Meetings List/DispForm.aspx?ID=25{28e838a4-8015-4177-ac17-2576b5d1e514}Education Center Department Heads | November 8, 2018
Education Center Board Room Work Session | November 27, 2018https://bond.bvsd.org/projects/DWSC/Lists/DAT Meetings List/DispForm.aspx?ID=27https://bond.bvsd.org/projects/DWSC/Lists/DAT Meetings List/DispForm.aspx?ID=27{28e838a4-8015-4177-ac17-2576b5d1e514}Education Center Board Room Work Session | November 27, 2018
Education Center DAT | January 10, 2019 | 2:30 - 4 p.m. https://bond.bvsd.org/projects/DWSC/Lists/DAT Meetings List/DispForm.aspx?ID=28https://bond.bvsd.org/projects/DWSC/Lists/DAT Meetings List/DispForm.aspx?ID=28{28e838a4-8015-4177-ac17-2576b5d1e514}Education Center DAT | January 10, 2019 | 2:30 - 4 p.m. https://bond.bvsd.org/projects/DWSC/DATMeetingDocs/20190110%20DAT3%20PRESENTATION-reduced.pdf, https://bond.bvsd.org/projects/DWSC/DATMeetingDocs/20190110%20DAT3%20PRESENTATION-reduced.pdf
Transportation DAT June 3, 2016https://bond.bvsd.org/projects/DWSC/Lists/DAT Meetings List/DispForm.aspx?ID=10https://bond.bvsd.org/projects/DWSC/Lists/DAT Meetings List/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}Transportation DAT June 3, 2016https://bond.bvsd.org/projects/DWSC/DATMeetingDocs/2016-06-02%20BVSD%20BUS%20Meeting%20Minutes.pdf, http://bond.bvsd.org/projects/DWSC/DATMeetingDocs/2016-06-02%20BVSD%20BUS%20Meeting%20Minutes.pdfhttps://bond.bvsd.org/projects/DWSC/DATMeetingDocs/2016-06-01_BVSD_Adj%20Site%20Entry_Drawing%20Notes.pdf, http://bond.bvsd.org/projects/DWSC/DATMeetingDocs/2016-06-01_BVSD_Adj%20Site%20Entry_Drawing%20Notes.pdf

Timeline

 

 

Ed Center Schematic Designhttps://bond.bvsd.org/projects/DWSC/Lists/Project Timeline/DispForm.aspx?ID=8https://bond.bvsd.org/projects/DWSC/Lists/Project Timeline/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}Ed Center Schematic DesignNovember 2018Completesuccess
Ed Center Design Developmenthttps://bond.bvsd.org/projects/DWSC/Lists/Project Timeline/DispForm.aspx?ID=9https://bond.bvsd.org/projects/DWSC/Lists/Project Timeline/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}Ed Center Design DevelopmentJanuary 2019Completesuccess
Ed Center Construction Documentshttps://bond.bvsd.org/projects/DWSC/Lists/Project Timeline/DispForm.aspx?ID=10https://bond.bvsd.org/projects/DWSC/Lists/Project Timeline/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}Ed Center Construction DocumentsApril 2019Completesuccess
Ed Center Constructionhttps://bond.bvsd.org/projects/DWSC/Lists/Project Timeline/DispForm.aspx?ID=6https://bond.bvsd.org/projects/DWSC/Lists/Project Timeline/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}Ed Center ConstructionSpring 2018 - Aug. 2020In Progressinfo

Images




    There are no items to show in this view of the "Construction Images" list.

    Scope of Work

    The Educational Master Plan includes the following projects to support and improve district systems and services provided at the Education Center:

    Transportation
    Estimated Project Budget: $24,141,359
    • Demolish the existing district Transportation offices, bus parking, and vehicle washing facility and replace with a new structure
    • Renovate the existing fleet maintenance facility
    Technology Training Center, administrative offices, and warehouse
    Estimated Project Budget: $26,913,446
    • Expand the existing Professional Development Center to provide additional space for student and staff technology training
    • Partially demolish the existing building and replace with a new structure on a smaller footprint to provide more parking
    • Modernize workspaces
    • Provide adequate space to accommodate staff currently working at another location
    • Provide secure after-hours access to meeting spaces
    • Improve public access for visitors
    • Renovate existing warehouse space
    District Kitchen
    Estimated Project Budget: $16,066,659
    • Renovate existing space to create a District Kitchen