Centennial Middle Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=25https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=25{28e838a4-8015-4177-ac17-2576b5d1e514}Centennial Middle School2205 Norwood Avenue Boulder, CO 80304http://cem.bvsd.org720.561.5441Phase 21960<img alt="" src="/projects/Project%20Profile%20Images/bvsd_centennial%20MS.jpg" style="BORDER:0px solid;" />$12,004,292$400,000 included in budget

Latest Updates

​Construction of the new track and field is complete!


 

 

August 2018https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=36https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=36{28e838a4-8015-4177-ac17-2576b5d1e514}August 2018Construction is substantially complete for most of the project except for work in the gym, which will be turned over to us in early September. When students returned from summer break they were greeted by a new culinary arts room, renovated cafeteria and kitchen, top to bottom renovation of the library, a new collaboration lab, new carpet, flooring, doors, and windows throughout the school, as well as fresh paint in many locations. Highlights of other work completed at the school include roof repair, a new secure entry vestibule, locker room remodeling and HVAC and electrical system upgrades. Thanks to the great Centennial community for your support of this project!
Construction Kick-off Postcard to Neighborshttps://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=28https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=28{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Postcard to Neighborshttps://bond.bvsd.org/projects/Centennial/Documents/Centennial%20construction%20start%20notification%20postcard%20text%20-%20web.pdf, http://bond.bvsd.org/projects/Centennial/Documents/Centennial%20construction%20start%20notification%20postcard%20text%20-%20web.pdf
Construction Kick-off Letter to Families and Staffhttps://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=27https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=27{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Letter to Families and Staffhttps://docs.google.com/document/d/1dm5Ru2PPFosTqDj_MNSZlyYgPEO_11uwUtneSwWID7Y/edit?usp=sharing, https://docs.google.com/document/d/1dm5Ru2PPFosTqDj_MNSZlyYgPEO_11uwUtneSwWID7Y/edit?usp=sharing

​      

 

 

julio de 2018https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=35https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=35{28e838a4-8015-4177-ac17-2576b5d1e514}julio de 2018Las cosas van muy bien este verano en la Escuela Intermedia Centennial, con el Proyecto de Construcción de Bonos totalmente en marcha y en las fechas previstas. Tengan en cuenta que, fuera del gimnasio grande, se están tratando todos los espacios de la escuela de una manera u otra , ¡se está haciendo una increíble cantidad de trabajo en un corto período de tiempo! https://docs.google.com/document/d/1i2hHBveOwUYz8fkkLZHASwBfHALuVfpKgCgoFkw4Xck/edit?usp=sharing, https://docs.google.com/document/d/1i2hHBveOwUYz8fkkLZHASwBfHALuVfpKgCgoFkw4Xck/edit?usp=sharing
Junio de 2018https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=32https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=32{28e838a4-8015-4177-ac17-2576b5d1e514}Junio de 2018Durante el mes de junio se verá una gran cantidad de trabajo aquí en la escuela intermedia Centennial. A partir del 25 de mayo, la mayor parte de la escuela se trasladará al gimnasio grande y los contenedores de almacenamiento a las canchas de tenis. El primer paso implica la eliminación del asbesto que se lleva a cabo en áreas selectas alrededor de la escuela. Además, habrá una gran actividad de demolición en el primer piso, principalmente en el lado oeste de la escuela y el área administrativa. El trabajo previo a la demolición también tendrá lugar en varias áreas en el segundo piso, con enfoque en el área de la biblioteca. La renovación del antiguo gimnasio continuará, así como el trabajo mecánico / eléctrico / de plomería en el nuevo Laboratorio de comida al sur del gimnasio auxiliar. También comenzará la instalación de ventanas nuevas y eficientes desde el punto de vista energético y continuará durante la mayor parte del verano. En el exterior de la escuela, el trabajo comenzará en las antiguas canchas de baloncesto al este de la escuela, así como en partes de la entrada principal. Finalmente, el reemplazo del techo también continuará durante todo el verano, por lo que podría haber olor a alquitrán ocasionalmente asociado con esta parte del proyecto. MUCHOS cambios emocionantes en espera para nuestros estudiantes y personal y estamos muy contentos de que este trabajo se complete más adelante este verano. Esperamos que usted y su familia tengan unas fantásticas vacaciones de verano... ¡Arriba Ciclones! https://docs.google.com/document/d/12gjc3gSOVktjgixlBjYpfy4y_j77fIRcU3myDQQg8gQ/edit?usp=sharing, https://docs.google.com/document/d/12gjc3gSOVktjgixlBjYpfy4y_j77fIRcU3myDQQg8gQ/edit?usp=sharing
abril de 2018https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=29https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=29{28e838a4-8015-4177-ac17-2576b5d1e514}abril de 2018¡Bienvenido a la primera de varias comunicaciones sobre el proyecto de construcción en la Escuela Intermedia Centennial! Habrá muchos cambios emocionantes en Centennial y el BVSD se compromete a mantenerlo informado a medida que avanza el trabajo y cómo ese trabajo puede afectar la rutina de la escuela. El trabajo preliminar ya comenzó y está programado completarse a principios de agosto. Tenga en cuenta que en la sección "Descripción general," le proporcionaremos un resumen básico de dos semanas del trabajo realizado. En la sección "Lo que necesita saber," puede encontrar actualizaciones sobre los posibles efectos en las rutinas diarias de la escuela. Teniendo esto en cuenta, el período de trabajo del 12 al 26 de abril está principalmente contenido en el antiguo gimnasio (gimnasio auxiliar actual) y en las antiguas áreas de los vestidores. En el antiguo gimnasio, se está llevando a cabo un análisis continuo del techo para planear el próximo trabajo. Ya ha terminado la demolición de los vestidores de los niños en el piso de abajo y el trabajo adicional quedará en espera hasta el verano, ya que ese trabajo incluye importantes efectos mecánicos en la escuela. La demolición del vestidor de las niñas (que se convertirá en el nuevo Food Lab, laboratorio de comida) se está completando. Durante la semana del 19 de abril comenzará el trabajo inicial de plomería y mecánico. Una vez más, estamos muy entusiasmados con las muchas áreas nuevas que habrá en Centennial en los próximos meses. Agradecemos todo su apoyo para hacer que estos cambios sean posibles y nos mantendremos en contacto con usted en los próximos días y semanas https://docs.google.com/document/d/1iv2--7nQ4wY7HQc8QwMWiS75LtE5T9Mf17W7cD-C7Lg/edit?usp=sharing, https://docs.google.com/document/d/1iv2--7nQ4wY7HQc8QwMWiS75LtE5T9Mf17W7cD-C7Lg/edit?usp=sharing
July 2018https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=34https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=34{28e838a4-8015-4177-ac17-2576b5d1e514}July 2018Things are moving along very well at Centennial Middle School this summer with the Building for Student Success construction project fully engaged and on schedule. Except for the large gym, every space in the school is being touched in one way or another - an amazing amount of work being done in a short period of time! Follow the arrow below for details. https://docs.google.com/document/d/1t1HMCkuwUQR7wZJ0VXT4xmJuhOwkr3XZ-S7YUisKdQA/edit?usp=sharing, https://docs.google.com/document/d/1t1HMCkuwUQR7wZJ0VXT4xmJuhOwkr3XZ-S7YUisKdQA/edit?usp=sharing
May 17 - 31, 2018https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=31https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=31{28e838a4-8015-4177-ac17-2576b5d1e514}May 17 - 31, 2018With the bulk of the work being done hidden behind protective partitions, it is hard to tell that a great deal of construction progress has taken place here at Centennial MS. Demolition of the old girls' locker room (which will become a Food Lab) and various parts of the old gym has been completed. In the weeks ahead, preparations are being made for the “big move” beginning on the evening of May 24 thru May 26th. All classrooms and most offices will be moved to the new gym and storage containers (which will be located north of the tennis courts) in order to facilitate new carpet and paint throughout the school. In addition, asbestos abatement will begin after students and staff are off-site beginning May 26th. Demolition in various classrooms (depending on the scope for that space) will begin as well. Outside site work will begin at the basketball court, the front of the school and on the north side of the school. Please note that the school, the parking lot (north side) and a few other areas around the school, will be off-limits to the community during this very busy summer of construction. Also, we will be providing you monthly updates during the summer break (June/July/August). We wish all of you a wonderful end of the school year and a fun and relaxing summer…..Go Cyclones! https://docs.google.com/document/d/18rDQy--nMY2WsEc7-ROAlZVwFjwWf5Rh0XG_WnuqTHc/edit?usp=sharing, https://docs.google.com/document/d/18rDQy--nMY2WsEc7-ROAlZVwFjwWf5Rh0XG_WnuqTHc/edit?usp=sharing
June 2018https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=33https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=33{28e838a4-8015-4177-ac17-2576b5d1e514}June 2018The month of June will see an enormous amount of work taking place here at Centennial Middle School. Starting on May 25th, the bulk of the entire school will be moved to the large gym and storage containers by the tennis courts. The first step involves asbestos abatement taking place in select areas around the school. In addition, there will be major demo activity on the first floor, primarily on the west side of the school and the administrative area. Pre-demo work will also take place in several areas on the second floor, with a focus on the library area. Renovation of the old gym will continue as well as the mechanical/electrical/plumbing work in the new Food Lab south of the auxiliary gym. Installation of new, energy efficient, windows will begin as well and continue through the bulk of summer. On the exterior of the school, work will begin on the old basketball courts east of the school as well as parts of the front entrance. Finally, replacement of the roof will also continue throughout the summer so there could be occasional tar smell associated with this part of the project. LOTS of exciting changes in store for our students and staff and we are excited for this work to be completed later on this summer. We hope that you and your family have a fantastic summer break…...Go Cyclones! https://docs.google.com/document/d/19_-V88PxVcfFqf0eMfQ1lJORhnxQ5WQ2dbRVrr48Rww/edit?usp=sharing, https://docs.google.com/document/d/19_-V88PxVcfFqf0eMfQ1lJORhnxQ5WQ2dbRVrr48Rww/edit?usp=sharing
Field Construction Underwayhttps://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=10https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}Field Construction UnderwayCentennial Middle School is a phase 2 project, however installation of the new synthetic field and track has been fast-tracked and began in April with anticipated completion by August. The timeline for the rest of the project has not been determined, although we anticipate planning could begin in the spring of 2017 or 2018.
Field Construction Kick-off Letter to Familieshttps://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=11https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}Field Construction Kick-off Letter to Familieshttps://bond.bvsd.org/projects/Centennial/Documents/Centennial%20Field%20Construction%20Kick-off%20Letter%20to%20Families.pdf, http://bond.bvsd.org/projects/Centennial/Documents/Centennial%20Field%20Construction%20Kick-off%20Letter%20to%20Families.pdf
Field Construction Kick-off Notice to Neighborshttps://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=12https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}Field Construction Kick-off Notice to Neighborshttps://bond.bvsd.org/projects/Centennial/Documents/Centennnial%20Field%20Construction%20Kick-off%20Postcard%20to%20Neighbors%20web.pdf, http://bond.bvsd.org/projects/Centennial/Documents/Centennnial%20Field%20Construction%20Kick-off%20Postcard%20to%20Neighbors%20web.pdf
January 2017https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=13https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}January 2017Architect selection for the building renovation project is underway. The Design Advisory Team (DAT) process will begin in February. The DAT meeting schedule and minutes will be posted in the DAT section below. Additional construction work will occur on the new field and track in the spring.
February Updatehttps://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=14https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}February UpdateDavis Partnerships was selected as the architect for the project. The Design Advisory Team (DAT) will begin meeting with the design team this month. Meeting dates and minutes will be posted below in the DAT section of this website. Construction is anticipated to take place next summer. Check back here for project updates.
Project Kick-off Notification to Neighborshttps://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=15https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=15{28e838a4-8015-4177-ac17-2576b5d1e514}Project Kick-off Notification to Neighborshttps://bond.bvsd.org/projects/Centennial/Documents/Centennial%20Neighbor%20DAT%20Start%20Notification%20Postcard%20web.pdf, http://bond.bvsd.org/projects/Centennial/Documents/Centennial%20Neighbor%20DAT%20Start%20Notification%20Postcard%20web.pdf
Project Kick-off Letter to Familieshttps://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=16https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}Project Kick-off Letter to Familieshttps://bond.bvsd.org/projects/Centennial/Documents/CentennialProjectKick-offLettertoParents.pdf, http://bond.bvsd.org/projects/Centennial/Documents/CentennialProjectKick-offLettertoParents.pdf
March 2017https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=17https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}March 2017The project team is working with the Design Advisory Team (DAT) to develop the schematic design. Meeting dates and minutes are posted below in the DAT section of this website. Construction is anticipated to take place next summer.
May 2018https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=18https://bond.bvsd.org/projects/Centennial/Lists/Latest Updates/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}May 2018The project team is working with the Design Advisory Team (DAT) to develop the schematic design. Follow the link for DAT meeting minutes. https://bond.bvsd.org/projects/Centennial/Pages/default.aspx#dat, http://bond.bvsd.org/projects/Centennial/Pages/default.aspx#dat

Project Details

Project Team
Project Manager

 

 

Mandy Redfieldhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=57{28e838a4-8015-4177-ac17-2576b5d1e514}Mandy Redfieldmandy.redfield@bvsd.org720-561-5953

Architect

 

 

Davis Partnershipshttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=33{28e838a4-8015-4177-ac17-2576b5d1e514}Davis Partnershipshttp://davispartnership.com/, http://davispartnership.com/

Contractor

 

 

Roche Constructionhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=50{28e838a4-8015-4177-ac17-2576b5d1e514}Roche Construction303-920-5555

Related Resources

 

 

Educational Facilities Master Planhttps://bond.bvsd.org/projects/Centennial/Lists/Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Centennial/Lists/Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttps://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=34, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=34page

Details
Project Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=25https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=25{28e838a4-8015-4177-ac17-2576b5d1e514}$12,004,292

Innovation Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=25https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=25{28e838a4-8015-4177-ac17-2576b5d1e514}$400,000 included in budget

Bond Expenditures

 

 

Centennial Middle Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=25https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=25{28e838a4-8015-4177-ac17-2576b5d1e514}Centennial Middle Schoolhttps://bond.bvsd.org/financial/Documents/CurrentProgramExpenditures.pdf, Bond Program Expenditures

Project Expenditures

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=25https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=25{28e838a4-8015-4177-ac17-2576b5d1e514}https://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=25https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=25{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClassF11686652FFD4905A3420186A72861EB"><div>Under development</div></div>

Energy Efficiency/Green Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=25https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=25{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClass07C9A52BC71E4ECF8302D61948600D5A"><div>Under development</div></div>

Educational Innovation Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=25https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=25{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClass975F3E866D19468D91D38595334680C4"><div><div><p>The Centennial Middle School project will reconfigure the library to create collaborative spaces, instructional spaces, quiet study spaces, flexible meeting spaces, green screen video production room, and a nuclear zone as a focal point for student interaction and collaboration.  The project aligns with three of BVSD's six <a href="http://bvsdsuccesseffect.org/educational-innovation/"><span class="ms-rteForeColor-3">Innovation Guiding Principles</span></a>: Learning is a Social Process, Learning Fosters a Culture of Curiosity and Risk Taking, Mastery of Learning is Demonstrated in Multiple Ways. <br></p><strong class="ms-rteThemeForeColor-9-0"><a href="/educational-innovation/Pages/Centennial-Middle-School.aspx">Learn more</a></strong><br><br></div></div></div>

Design Advisory Team

​The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.​ The design advisory team will be created when the project begins. 

Staff 

Jon Georgitis, Teacher - Librarian
Elma Sabic, Head Custodian
Elizabeth Olivas, Community Liaison, Interpreter
Jason Giguere, Counselor
Mo Breed, Teacher - Language Arts
Matt Adams, Teacher - PE
Scott Griffiths, Teacher - Social Studies and Food Fun
Dana Ellis, Principal

Parents
Stacey Zis,  SAC

Diane Jones
Maryann and John Palassa, Neighbors
Lilia Sanchez

  
​​Community​
Robin Keys, Community Member, SAC
Related Resources

 

 

Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/Centennial/Lists/DAT Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Centennial/Lists/DAT Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf, http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdfpage

DAT Meeting Schedule

DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting. ​​

 

 

Feb. 13, 2017 | 4 - 5:30 p.m.https://bond.bvsd.org/projects/Centennial/Lists/DAT Meetings List/DispForm.aspx?ID=1https://bond.bvsd.org/projects/Centennial/Lists/DAT Meetings List/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}Feb. 13, 2017 | 4 - 5:30 p.m.https://bond.bvsd.org/projects/Centennial/DATMeetingDocs/2017_02_13%20BVSD%20CMS%20DAT%20Mtg001%20Minutes.pdf, http://bond.bvsd.org/projects/Centennial/DATMeetingDocs/2017_02_13%20BVSD%20CMS%20DAT%20Mtg001%20Minutes.pdf
Mar. 6, 2017 | 4 - 5:50 p.m.https://bond.bvsd.org/projects/Centennial/Lists/DAT Meetings List/DispForm.aspx?ID=2https://bond.bvsd.org/projects/Centennial/Lists/DAT Meetings List/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Mar. 6, 2017 | 4 - 5:50 p.m.https://bond.bvsd.org/projects/Centennial/DATMeetingDocs/2017_03_06%20BVSD%20CMS%20DAT%20Mtg002%20Minutes.pdf, http://bond.bvsd.org/projects/Centennial/DATMeetingDocs/2017_03_06%20BVSD%20CMS%20DAT%20Mtg002%20Minutes.pdf
Mar. 21, 2017 | 4 - 5:50 p.m.https://bond.bvsd.org/projects/Centennial/Lists/DAT Meetings List/DispForm.aspx?ID=3https://bond.bvsd.org/projects/Centennial/Lists/DAT Meetings List/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Mar. 21, 2017 | 4 - 5:50 p.m.https://bond.bvsd.org/projects/Centennial/DATMeetingDocs/2017_03_06%20BVSD%20CMS%20DAT%20Mtg%20003%20Minutes.pdf, http://bond.bvsd.org/projects/Centennial/DATMeetingDocs/2017_03_06%20BVSD%20CMS%20DAT%20Mtg%20003%20Minutes.pdf
Apr. 12, 2017 | 4 - 5:30 p.m.https://bond.bvsd.org/projects/Centennial/Lists/DAT Meetings List/DispForm.aspx?ID=4https://bond.bvsd.org/projects/Centennial/Lists/DAT Meetings List/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}Apr. 12, 2017 | 4 - 5:30 p.m.https://bond.bvsd.org/projects/Centennial/DATMeetingDocs/2017_04_12%20BVSD%20CMS%20DAT%20Mtg%20004%20Minutes.pdf, http://bond.bvsd.org/projects/Centennial/DATMeetingDocs/2017_04_12%20BVSD%20CMS%20DAT%20Mtg%20004%20Minutes.pdf
Apr. 25, 2017 | 4 - 5:30 p.m.https://bond.bvsd.org/projects/Centennial/Lists/DAT Meetings List/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Centennial/Lists/DAT Meetings List/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Apr. 25, 2017 | 4 - 5:30 p.m.https://bond.bvsd.org/projects/Centennial/DATMeetingDocs/2017_04_25%20BVSD%20CMS%20DAT%20Mtg%20005%20Minutes.pdf, http://bond.bvsd.org/projects/Centennial/DATMeetingDocs/2017_04_25%20BVSD%20CMS%20DAT%20Mtg%20005%20Minutes.pdf
May 8, 2017 | 4 - 5:30 p.m.https://bond.bvsd.org/projects/Centennial/Lists/DAT Meetings List/DispForm.aspx?ID=6https://bond.bvsd.org/projects/Centennial/Lists/DAT Meetings List/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}May 8, 2017 | 4 - 5:30 p.m.https://bond.bvsd.org/projects/Centennial/DATMeetingDocs/2017_05_08%20BVSD%20CMS%20DAT%20Mtg%20006%20Minutes.pdf, http://bond.bvsd.org/projects/Centennial/DATMeetingDocs/2017_05_08%20BVSD%20CMS%20DAT%20Mtg%20006%20Minutes.pdf
Aug. 21, 2017 | 4 - 5:30 p.m.https://bond.bvsd.org/projects/Centennial/Lists/DAT Meetings List/DispForm.aspx?ID=8https://bond.bvsd.org/projects/Centennial/Lists/DAT Meetings List/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}Aug. 21, 2017 | 4 - 5:30 p.m.https://bond.bvsd.org/projects/Centennial/DATMeetingDocs/2017_08_21%20BVSD%20CMS%20DAT%20Mtg%20007%20Minutes.pdf, http://bond.bvsd.org/projects/Centennial/DATMeetingDocs/2017_08_21%20BVSD%20CMS%20DAT%20Mtg%20007%20Minutes.pdf

Timeline

 

 

Construction | Summer 2018https://bond.bvsd.org/projects/Centennial/Lists/Project Timeline/DispForm.aspx?ID=1https://bond.bvsd.org/projects/Centennial/Lists/Project Timeline/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}Construction | Summer 2018In Progressinfo
Construction Documents | Dec. 2017https://bond.bvsd.org/projects/Centennial/Lists/Project Timeline/DispForm.aspx?ID=2https://bond.bvsd.org/projects/Centennial/Lists/Project Timeline/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Documents | Dec. 2017Completesuccess
Design Development | Aug. 2017https://bond.bvsd.org/projects/Centennial/Lists/Project Timeline/DispForm.aspx?ID=3https://bond.bvsd.org/projects/Centennial/Lists/Project Timeline/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Design Development | Aug. 2017Completesuccess
Schematic Design | April 2017https://bond.bvsd.org/projects/Centennial/Lists/Project Timeline/DispForm.aspx?ID=4https://bond.bvsd.org/projects/Centennial/Lists/Project Timeline/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}Schematic Design | April 2017Completesuccess

Images

expand + Yr/Month : 15 Jan ‎(1)

Scope of Work

​Facility Condition

  • Exterior building improvements such as repair/replace windows and doors
  • Replace roof
  • Restroom renovations
  • Replace interior doors
  • Improvements to interior finishes such as carpet, flooring, ceilings and paint
  • Repair/replace fixtures and equipment such as kitchen equipment and casework
  • HVAC system improvements
  • Electrical system improvements
  • Replace auditorium seating
  • Remodel locker room
  • Site improvements such as irrigation and paving
  • Install audio enhancement in every classroom**

Program Compatibility Assessment

  • Remodel auxiliary gym
  • Provide cooking lab
  • Renovate Science labs
  • Remodel Music space​

Health and Physical Development

  • Replace basketball courts
  • Provide synthetic turf field and track (Summer 2016)

Safety and Security

  • Install electronic security controls
  • Install camera/intercom security system
  • Install exterior cameras
  • Install security partitions

Sustainability​

  • Upgrade lighting
  • Conduct retro-commissioning and repairs
  • Upgrade HVAC controls

Innovation​

Centennial Middle School is eligible to receive up to $ 400,000 in additional funds to implement facility improvements that support innovative teaching methods. ​

** Not included in project budget​