Centaurus High Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=8https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}Centaurus High School10300 South Boulder Road Lafayette, CO 80026http://www.centaurushs.org/720.561.7500Phase 11973<img alt="" src="/projects/Project%20Profile%20Images/CentaurusHS-photo-300x300.JPG" style="BORDER:0px solid;" />$30,592,800$800,000 included in budget

Latest Updates

 

 

May 2018https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=50https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=50{28e838a4-8015-4177-ac17-2576b5d1e514}May 2018Work in the boys' locker room, library, and student center were completed in April! The gym is gutted and will remain under construction through the summer. Follow the link for more details. https://docs.google.com/document/d/1TkhVu-TUjrgFiRU4cECe7eTUvpi72E4Oe6cjJ_2HfUU/edit?usp=sharing, https://docs.google.com/document/d/1TkhVu-TUjrgFiRU4cECe7eTUvpi72E4Oe6cjJ_2HfUU/edit?usp=sharing
Mayo de 2018https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=51https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=51{28e838a4-8015-4177-ac17-2576b5d1e514}Mayo de 2018Al igual que en todas las preparatorias, la temporada de exámenes está por comenzar en mayo. Por lo tanto, la construcción (fuera del área del gimnasio) disminuirá en varias áreas para poder minimizar cualquier disturbio durante los exámenes. Sin embargo, sigue habiendo mucho trabajo, incluyendo la preparación de la interminable lista de proyectos que terminar durante el verano. https://docs.google.com/document/d/16JVdqG0HC5uUu5MRXZzrX4_NX-do_toxAvKflSVu3Xc/edit?usp=sharing, https://docs.google.com/document/d/16JVdqG0HC5uUu5MRXZzrX4_NX-do_toxAvKflSVu3Xc/edit?usp=sharing

Improvements to Spangenberg Field are substantially complete!

​ Aerial view of the new track and field

Principals Terry Gillach (CHS) and Jerry Anderson (MHS) cut the ribbon with Superintendent Messinger.

 
  


Check Out the Centaurus Spangenberg Field Construction Fly-over​​

Crews are making great progress on the renovation work at Spangenberg Field! Check out the video below filmed via drone by Centaurus’s own Brian Thomas to see work underway. 


 

 

Julio de 2017https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=26https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=26{28e838a4-8015-4177-ac17-2576b5d1e514}Julio de 2017La construcción en la Escuela Preparatoria Centaurus continúa a pleno rendimiento con el trabajo que se está haciendo en múltiples áreas de la escuela. En general, la parte de la “demolición” durante el verano se ha completado en la mayoría de las áreas (además de las salas para banda/orquesta) y la fase de “reconstrucción” ha comenzado. El contratista general, GH Phipps, ha estado impulsando el trabajo con los sustitutos, muchos de ellos han trabajado horas extras y durante el fin de semana para cumplir con algunos plazos ajustados.https://docs.google.com/document/d/1w-2W6AXhyHDR4L0BRzzvDhA7Im0-HROw-npn0TuqlhA/edit?usp=sharing, https://docs.google.com/document/d/1w-2W6AXhyHDR4L0BRzzvDhA7Im0-HROw-npn0TuqlhA/edit?usp=sharing
agosto 2017https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=29https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=29{28e838a4-8015-4177-ac17-2576b5d1e514}agosto 2017La escuela está en marcha de nuevo y las obras continúan en varias áreas del recinto escolar. Mientras que las labores en el ala de Humanidades y en otras zonas de la escuela siguen —el suelo en el área común se hará a mediados de septiembre—, el grueso del trabajo se concentrará en las zonas siguientes:https://docs.google.com/document/d/1c_GWDLYRIZ_eoaIS3DevQOhxo4DfxEVAr1g3poaLQhc/edit?usp=sharing, https://docs.google.com/document/d/1c_GWDLYRIZ_eoaIS3DevQOhxo4DfxEVAr1g3poaLQhc/edit?usp=sharing
septiembre de 2017https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=30https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=30{28e838a4-8015-4177-ac17-2576b5d1e514}septiembre de 2017Los estudiantes y el personal de Centaurus se encuentran trabajando en pleno a medida que nos acercamos a los últimos días de septiembre. Si han visitado la escuela últimamente, se habrán dado cuenta que la construcción también continúa, el trabajo ocurre 6 días a la semana. Hay un MONTÓN de cosas por hacer alrededor de la escuela, por favor lea más adelante un resumen sobre el trabajo por ahora en las diferentes áreas: 1. Baños/puestos del auditorio (Argo): Los baños y las concesionarias estarán completamente terminadas para finales de mes. La ventana enrollable en la concesionaria se instalará el 19/9 y se trabajará en otras tareas finales. 2. Vestidores para chicas (Educación Física/Deportes): Los acabados básicos se llevan a cabo y continuarán hasta finales de septiembre. Así como la pintura y acabados finales e instalación de los casilleros. 3. Ala de humanidades (primer piso, oeste): Se comenzará en los pisos del área común el 15/9 y se completará durante los 2 siguientes fines de semana. También se trabajará en otras tareas finales. 4. Entrada principal y Plaza: Los estudiantes y el personal continuarán usando la entrada Argo mientras continúa el trabajo en esta área. El personal de la oficina principal (director, asistente del director, otras secretarias) trabajará en el Centro de Estudiantes hasta finales de septiembre/principios de octubre. Los acabados, piso y otros detalles se completarán en el área de la oficina a finales de septiembre. Tengan en cuenta que la nueva entrada principal no estará completa hasta noviembre aproximadamente. 5. Salón para Banda/Orquesta: Se ha completado la demolición y comenzará la construcción. Esto incluye la colocación de formas, barras de refuerzo y vertido de vigas planas. 6. Baños seleccionados: No se está trabajando en esta área en este momento ya que se trabajará en ellos durante la primavera/verano de 2018. https://docs.google.com/document/d/1pusvzao8qt8KLSV7Pgr8O-TDtG76yObD05o98pWzexQ/edit?usp=sharing, https://docs.google.com/document/d/1pusvzao8qt8KLSV7Pgr8O-TDtG76yObD05o98pWzexQ/edit?usp=sharing
Resumen del período del 16 al 31 de octubrehttps://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=32https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=32{28e838a4-8015-4177-ac17-2576b5d1e514}Resumen del período del 16 al 31 de octubreHa habido logros significativos mientras la construcción continúa aquí en la escuela preparatoria Centaurus. Los baños Argo y las concesionarias ya están abiertos para su uso, así como los nuevos vestidores de las niñas (obsérvese que los vestidores de las niñas se dividirán en dos para uso de las niñas y los niños durante la remodelación del vestidor de los niños). Parte del trabajo ha sido algo ruidoso (en el salón de banda y la biblioteca), pero los trabajadores están haciendo todo lo posible por mantenerlo al mínimo durante el día escolar. https://docs.google.com/document/d/1spykI7CA7IHroc_vt6r67e_mIYV4-WDwpDPsT0Ekd48/edit?usp=sharing, https://docs.google.com/document/d/1spykI7CA7IHroc_vt6r67e_mIYV4-WDwpDPsT0Ekd48/edit?usp=sharing
Resumen del período del 1 al 23 de noviembrehttps://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=35https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=35{28e838a4-8015-4177-ac17-2576b5d1e514}Resumen del período del 1 al 23 de noviembreEl trabajo avanza sin parar a medida que la construcción se lleva a cabo en varias áreas de la escuela durante este tiempo. Las áreas afectadas se encuentran en diversas etapas de finalización, desde la demolición inicial (el vestidor de los niños, salones 216-220) hasta la nueva entrada principal asegurada que casi es lo último del proyecto. ¡La acción de ver derramar el cemento en la plaza del frente fue un gran éxito entre los estudiantes y el personal la semana pasada! Los administradores de Centaurus quieren felicitar tanto a los estudiantes como al personal por haber sido extremadamente pacientes y flexibles durante este periodo activo particularmente de trabajo alrededor de la escuela. Cosas inusuales y ocasionales ruidos fuertes son algo cotidiano aquí por ahora, eso es seguro. Sin embargo, el día a día, pueden ver lentamente la transformación de los espacios a medida que avanza el trabajo. https://docs.google.com/document/d/1WtJbOQdZq64ie1IBV1eGPtmb-ZpcKXUgUAq7-mcvTNE/edit?usp=sharing, https://docs.google.com/document/d/1WtJbOQdZq64ie1IBV1eGPtmb-ZpcKXUgUAq7-mcvTNE/edit?usp=sharing
Información Importante Sobre la Eliminación del Asbestohttps://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=37https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=37{28e838a4-8015-4177-ac17-2576b5d1e514}Información Importante Sobre la Eliminación del Asbestohttps://docs.google.com/document/d/1-zwxzZxkgiv_BoQkLzaTcPayKRfI-iVFXgvKM53eUoM/edit?usp=sharing, https://docs.google.com/document/d/1-zwxzZxkgiv_BoQkLzaTcPayKRfI-iVFXgvKM53eUoM/edit?usp=sharing
Resumen del período del 11 al 31 de diciembrehttps://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=39https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=39{28e838a4-8015-4177-ac17-2576b5d1e514}Resumen del período del 11 al 31 de diciembreA medida que avanzamos en diciembre y ya casi llegan las vacaciones de invierno, hay una gran actividad de construcción que se está llevando a cabo aquí en la preparatoria Centaurus en estos días. Hay varias áreas que se completarán este mes (los salones de banda/orquesta, tres clases opcionales arriba) y otras áreas, en las que se seguirá trabajando en la primera parte de 2018. La prioridad es hacer tanto trabajo como se pueda durante este año dada la gran cantidad de trabajo programado para la primavera y verano de 2018. Continuaremos manteniéndoles informados sobre el progreso en la escuela, por lo que les pedimos que lean las breves descripciones a continuación para obtener detalles sobre áreas específicas en toda la escuela.https://docs.google.com/document/d/1WI3PrLDIPlpqkVKdHnj2BZfiuAlzFFzqh_Hl89OpOrk/edit?usp=sharing, https://docs.google.com/document/d/1WI3PrLDIPlpqkVKdHnj2BZfiuAlzFFzqh_Hl89OpOrk/edit?usp=sharing
Resumen del período de enero de 2018https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=43https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=43{28e838a4-8015-4177-ac17-2576b5d1e514}Resumen del período de enero de 2018¡Esperamos que este mensaje los encuentre a usted y a su familia sanos, felices y descansados de las vacaciones de inviernos! MUCHO ha sucedido en el proyecto de construcción en la preparatoria Centaurus durante las últimas semanas, con mucho más por venir en el próximo mes. Como de costumbre, se han “devuelto” áreas a la escuela como se van completando, mientras que otras áreas se “toman” para ser remodeladas y/o arregladas.https://docs.google.com/document/d/1n1Ggc5SXpHC-3QlgCAs7Go9Q3Xxvd6fcXvVTvWiukE4/edit?usp=sharing, https://docs.google.com/document/d/1n1Ggc5SXpHC-3QlgCAs7Go9Q3Xxvd6fcXvVTvWiukE4/edit?usp=sharing
Resumen del período de febrero de 2018https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=45https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=45{28e838a4-8015-4177-ac17-2576b5d1e514}Resumen del período de febrero de 2018Centaurus ha vuelto al ritmo de trabajo este segundo semestre, y la actividad de la construcción también ha aumentado en varias áreas. Bastantes cosas sucederán durante el mes de febrero, tanto dentro como fuera de la escuela, y el próximo gran "evento" será la clausura del gimnasio principal a principios de marzo. Como de costumbre, lo mantendremos informado acerca de todos los cambios que se avecinen, pero consulte los breves resúmenes a continuación sobre el trabajo en curso durante el mes de febrero.https://docs.google.com/document/d/1tyMgg7PY25gd2VH-Q3opOpYYQ-b5janggUABhkCW-Ts/edit?usp=sharing, https://docs.google.com/document/d/1tyMgg7PY25gd2VH-Q3opOpYYQ-b5janggUABhkCW-Ts/edit?usp=sharing
Resumen del período de marzo de 2018https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=46https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=46{28e838a4-8015-4177-ac17-2576b5d1e514}Resumen del período de marzo de 2018Nos estamos acercando a un periodo importante de “transición” del proyecto de bonos de Centaurus High. Áreas considerables de la escuela están a punto de terminarse y Phipps programa abordar otras a lo largo de las próximas semanas.https://docs.google.com/document/d/1s_CJH17SilcN40ahddzpD4Okao1ioV7G9NmpldiOtps/edit?usp=sharing, https://docs.google.com/document/d/1s_CJH17SilcN40ahddzpD4Okao1ioV7G9NmpldiOtps/edit?usp=sharing
Abril de 2018https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=48https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=48{28e838a4-8015-4177-ac17-2576b5d1e514}Abril de 2018Se completaron muchos trabajos de la construcción durante las vacaciones de primavera, avanzó el trabajo en muchas áreas o siguen en el horario previsto. Con la cercana temporada de pruebas y todas las actividades de primavera que involucran a los estudiantes, es un momento muy ocupado para todos los que vienen a CHS todos los días.https://docs.google.com/document/d/1xJWk9keCKbt4tW4CO5diOS-iUZhSlwD4QwomYnCsRuI/edit?usp=sharing, https://docs.google.com/document/d/1xJWk9keCKbt4tW4CO5diOS-iUZhSlwD4QwomYnCsRuI/edit?usp=sharing
Escuela Preparatoria Centaurus (Campo Spangenberg) Últimas noticias sobre la construcción Informe mensual – mayohttps://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=8https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}Escuela Preparatoria Centaurus (Campo Spangenberg) Últimas noticias sobre la construcción Informe mensual – mayoLa construcción en el Campo Spangenberg está progresando. Ya se ha completado el removimiento de tierra, la eliminación de asbesto y la demolición de la taquilla. Durante el próximo mes, la pista actual será preparada para la nueva superficie y se removerá el césped sintético para preparar el área para el nuevo campo. La iluminación del estadio será reemplazada con más accesorios y equipos de eficiencia energética y los trabajadores comenzarán las obras de la nueva taquilla. Los baños exteriores serán remodelados con un nuevo techo y pintura. Por último, las tres canchas de tenis existentes serán recubiertas y ¡muy pronto se añadirán dos canchas más! A partir del 31 de mayo, la superficie del estacionamiento se molerá en preparación para el nuevo asfalto. Tenga en cuenta esto cuando asistan a actividades en la escuela durante el verano. Las rutas de tráfico pueden cambiar ya sea a diario o semanalmente. Gracias por su apoyo y paciencia durante la construcción. Esperamos con ansia mejores espacios deportivos y un estacionamiento renovado para cuando la escuela reanude en el otoño. https://bond.bvsd.org/projects/Centaurus/Documents/Centaurus_Bond%20Update%20(Spangenberg%20Field)_SPANISH.pdf, http://bond.bvsd.org/projects/Centaurus/Documents/Centaurus_Bond%20Update%20(Spangenberg%20Field)_SPANISH.pdf
December Updatehttps://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=1https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}December UpdateThe design team is developing a master plan for addressing the project items identified in the Educational Facilities Master Plan as well as anticipated facilities needs over the next 10 years related to enrollment growth and shifts in the educational program.
Construction Kick-off Notice to Neighborshttps://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=10https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Notice to Neighborshttps://bond.bvsd.org/projects/Centaurus/Documents/CHS%20Spangenberg%20Construction%20Kick-off%20Postcard%20to%20Neighbors%20web.pdf, http://bond.bvsd.org/projects/Centaurus/Documents/CHS%20Spangenberg%20Construction%20Kick-off%20Postcard%20to%20Neighbors%20web.pdf
June 2016 Update - Building Renovationhttps://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=11https://bond.bvsd.org/projects/Centaurus/Lists/Latest Updates/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}June 2016 Update - Building RenovationThe professional design team is working with the design advisory team to develop the schematic design. At its April meeting, the Citizens Bond Oversight committee supported staff's recommendation to augment the project budget by $7.1M for additional work to create innovative learning environments. https://drive.google.com/open?id=1b60eIf5ZVhyXHRYNK-_qCPrGtianZW4-FFiJg-d04Qo, https://drive.google.com/open?id=1b60eIf5ZVhyXHRYNK-_qCPrGtianZW4-FFiJg-d04Qo

Project Details

Project Team
Project Manager

 

 

Gene Temansonhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=55{28e838a4-8015-4177-ac17-2576b5d1e514}Gene Temanson

Architect

 

 

Fielding Nair Internationalhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Fielding Nair Internationalhttp://www.fieldingnair.com, http://www.fieldingnair.com
GKKworkshttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=35{28e838a4-8015-4177-ac17-2576b5d1e514}GKKworkshttp://www.gkkworks.com/, http://www.gkkworks.com/

Contractor

 

 

GH Phippshttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=36{28e838a4-8015-4177-ac17-2576b5d1e514}GH Phippshttp://www.ghphipps.com/, http://www.ghphipps.com/

Related Resources

 

 

Educational Facilities Master Planhttps://bond.bvsd.org/projects/Centaurus/Lists/Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Centaurus/Lists/Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttps://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=33, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=33page
Sign up to receive email updateshttps://bond.bvsd.org/projects/Centaurus/Lists/Related Resources/DispForm.aspx?ID=6https://bond.bvsd.org/projects/Centaurus/Lists/Related Resources/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}Sign up to receive email updateshttps://docs.google.com/forms/d/1n4ccIr5VduDVgV87sddBgFMSCbqfmWlNYvRc8Y8PiVU/viewform?usp=send_form, https://docs.google.com/forms/d/1n4ccIr5VduDVgV87sddBgFMSCbqfmWlNYvRc8Y8PiVU/viewform?usp=send_formexternal

Details
Project Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=8https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}$30,592,800

Innovation Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=8https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}$800,000 included in budget

Bond Expenditures

 

 

Centaurus High Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=8https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}Centaurus High Schoolhttps://bond.bvsd.org/financial/Documents/CurrentProgramExpenditures.pdf, Bond Program Expenditures

Project Expenditures

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=8https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}https://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=8https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Energy Efficiency/Green Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=8https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClassB6C1D366A6AB49BE99E751C8BC758CA9"><div><div>To improve energy efficiency, a <a href="/green/Pages/Energy-Efficiency-Glossary.aspx">deep energy retrofit </a>was performed on the building as part of the renovation work. Overall energy efficiency is predicted to improve substantially.  <br></div><div><br></div><div><a href="https://drive.google.com/file/d/0B7mWrvWeY7DtS2xPQS1peHljd1k/view"><strong>Check out </strong></a>the energy use predictions<br></div><div><a href="https://drive.google.com/file/d/0B7mWrvWeY7DtS2xPQS1peHljd1k/view" style="text-decoration-line:underline;"><img src="/projects/PublishingImages/DeepEnergyLink.JPG" alt="" style="margin:5px;width:300px;" /></a><br></div><div><br></div><div><strong><a href="https://youtu.be/dMftjNETKEI">Learn more </a></strong>about how BVSD is improving energy efficiency in our buildings. <br></div><br><br></div></div>

Educational Innovation Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=8https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}Under development

Design Advisory Team

​The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.​

​Design Advisory Team Members


Focus Group 1

Greg Cocking - admin
Mike Ross - Math/Design Thinking
Aaron Vogelsberg - music (band)
Connie Carlson - LA/Literacy
Taylor Rhodes - Student 11th grade
Jim Policita - Parent

Focus Group 2

Johnny Fernandez - admin/Design Thinking
Scott Wickham - music (choir)
Dianne Webster - ICAN
Dave Platt - Counselor
Kristn McDermott - Science
Caio Gajdys - Student 11th grade
Kate Huth - Parent

Focus Group 3

Rhonda Haniford - admin/Design Thinking
Nancy Ossorio - ILC
Beth Schmid - Clerical
Terry Fostvedt - LA
Nora Cuthbertson - Student 9th
Todd Grant - Parent

Focus Group 4

Lisa Lowe - SS/Design Thinking
Jason Oliver - 1:Web 
Eric Mattys - Science
Julie Ascarrunz - ELL
Brenda Thiel - FACS
Doug Kinney - Community Business Member

Focus Group 5

Rich Affleck - admin/athletics
Robin Lynch - PE/athletics/Design Thinking
Mike Hollenbach - Art
Cristina Lighthiser -Engineering
Megan Schmid - Student 11th
Debbie McNutt - Parent​​

Athletics DAT​ Members


Monarch

Russ McKinstry - Monarch Athletic Director
Phil Bravo - Monarch Football Coach 
Kent Rieder - Monarch Track Coach 
Heather Cracraft - Monarch parent 

Centaurus

Rich Affleck - Centaurus Athletic Director 
Robin Lynch - Centaurus Track Coach 
Aaron Vogelsberg - Centaurus Band Director 
Lori Lujan - Centaurus parent

Related Resources

​Community Meetings

Sept. 16 | Community Visioning Workshop​

 ​View Presentation

Oct. 1 | Neighborhood Meeting RE: Athletic Project
 Minutes


Discovery Visit

Sept. 16 & 17

  Discovery Dashboard


 

 

Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/Centaurus/Lists/DAT Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Centaurus/Lists/DAT Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf, http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdfpage

DAT Meeting Schedule

DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting. ​​

 

 

October 10, 2016https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=12https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}October 10, 2016Centaurus High Schoolhttps://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/DAT%20DD-01%20Meeting%20Minutes%20101016.pdf, http://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/DAT%20DD-01%20Meeting%20Minutes%20101016.pdfhttps://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/DAT.10.10.16%20DD01%20(1).pdf, http://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/DAT.10.10.16%20DD01%20(1).pdf
May 25 (Athletic Project), 2016https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=11https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}May 25 (Athletic Project), 2016Centaurus High School
May 11, 2016https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=10https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}May 11, 2016https://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/DAT%20SD-02%20Meeting%20Minutes%20051116.pdf, http://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/CHS%20DAT%20SD02%20051116%20web.pdfhttps://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/CHS%20DAT%20SD02%20051116%20web.pdf, http://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/CHS%20DAT%20SD02%20051116%20web.pdf
April 12, 2016https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=9https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}April 12, 2016https://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/DAT%20SD-01%20Meeting%20Minutes%20041216.pdf, http://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/DAT%20SD-01%20Meeting%20Minutes%20041216.pdfhttps://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/CHS%20DAT%20SD01prsntweb.pdf, http://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/CHS%20DAT%20SD01prsntweb.pdf
Feb. 16, 2016https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=8https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}Feb. 16, 2016https://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/Centaurus%20DAT%20Mtg-04%202016_0216.pdf, http://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/Centaurus%20DAT%20Mtg-04%202016_0216.pdfhttps://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/2016-0216CHSDAT4prsntweb.pdf, http://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/2016-0216CHSDAT4prsntweb.pdf
Jan. 14 (Athletic Project), 2016https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=7https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}Jan. 14 (Athletic Project), 2016https://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/2016%200114%20-%20CHS%20Spangenberg%20DAT%20no.4%20minutes.pdf, http://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/2016%200114%20-%20CHS%20Spangenberg%20DAT%20no.4%20minutes.pdf
Dec. 2, 2015https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=6https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}Dec. 2, 2015https://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/Centaurus%20DAT%20Mtg-03%202015_1202.pdf, CHS DAT Mtg 3 Minutes
Nov. 16 (Athletic Project), 2015https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Nov. 16 (Athletic Project), 2015https://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/2015-1116-CHSSpangField-DAT3Minutes.pdf, http://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/2015-1116-CHSSpangField-DAT3Minutes.pdf
Oct. 28, 2015https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=4https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}Oct. 28, 2015https://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/2015-1028-CHSDAT2Minutes.pdf, http://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/2015-1028-CHSDAT2Minutes.pdf
Oct. 1 (Athletic Project), 2015https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=3https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Oct. 1 (Athletic Project), 2015https://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/2015-1001-CHSSpangField-DAT2Minutes.pdf, http://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/2015-1001-CHSSpangField-DAT2Minutes.pdf
Sept. 16, 2015https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=2https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Sept. 16, 2015https://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/2015-0916-CHSDAT1Minutes.pdf, http://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/2015-0916-CHSDAT1Minutes.pdf
Aug. 28 (Athletic Project), 2015https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=1https://bond.bvsd.org/projects/Centaurus/Lists/DAT Meetings List/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}Aug. 28 (Athletic Project), 2015https://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/2015-0828-CHSSpangField-DAT1Minutes.pdf, http://bond.bvsd.org/projects/Centaurus/DATMeetingDocs/2015-0828-CHSSpangField-DAT1Minutes.pdf

Timeline

 

 

Master Planning https://bond.bvsd.org/projects/Centaurus/Lists/Project Timeline/DispForm.aspx?ID=3https://bond.bvsd.org/projects/Centaurus/Lists/Project Timeline/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Master Planning Oct. 2015 - Feb. 2016Completesuccess
Schematic Design https://bond.bvsd.org/projects/Centaurus/Lists/Project Timeline/DispForm.aspx?ID=2https://bond.bvsd.org/projects/Centaurus/Lists/Project Timeline/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Schematic Design March - April 2016Completesuccess
Design Developmenthttps://bond.bvsd.org/projects/Centaurus/Lists/Project Timeline/DispForm.aspx?ID=4https://bond.bvsd.org/projects/Centaurus/Lists/Project Timeline/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}Design DevelopmentMay - Aug. 2016Completesuccess
Construction Documentshttps://bond.bvsd.org/projects/Centaurus/Lists/Project Timeline/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Centaurus/Lists/Project Timeline/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Construction DocumentsSept. - Nov. 2016Completesuccess
Permittinghttps://bond.bvsd.org/projects/Centaurus/Lists/Project Timeline/DispForm.aspx?ID=6https://bond.bvsd.org/projects/Centaurus/Lists/Project Timeline/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}PermittingDec. 2016 - Jan. 2017Completesuccess
Construction Starthttps://bond.bvsd.org/projects/Centaurus/Lists/Project Timeline/DispForm.aspx?ID=1https://bond.bvsd.org/projects/Centaurus/Lists/Project Timeline/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}Construction StartSummer 2017In Progressinfo

Images

Scope of Work

The renovation of the Centaurus building provides the opportunity to rethink how we build schools to support student success in the 21st Century. Centaurus has been identified to be an exemplar of educational innovation in the school district. It will serve as a model of 21st Century approaches to teaching and learning as well as an innovative learning environment that will bring to life BVSD's Strategic Plan and the BVSD Innovation Guiding Principles.  

Facility Condition

  • Exterior building improvements such as repair/replace windows and doors and paint
  • Replace roof
  • Asbestos abatement
  • Renovate locker rooms
  • Improvements to interior finishes such as carpet, flooring, ceiling tile and paint
  • Replace clock system
  • HVAC system improvements
  • Electrical system improvements/generator replacement
  • Renovate commons area at auditorium (Argo)
  • Restroom renovations
  • Repair/replace fixtures such as bleachers and scoreboard
  • Site improvements such as paving and irrigation
  • Audio enhancement in every classroom 

Program Compatibility Assessment

  • Renovate music classrooms  
  • Provide adequate Special Education space
  • Renovate library
  • Renovate kitchen and cafeteria
  • Redesign main entry and student center (amended April 20, 2016)
  • Renovate Humanities wing (amended April 20, 2016)

Health and Physical Development

Safety and Security

  • Install security partitions
  • Install electronic security controls
  • Install camera/intercom security system
  • Replace/add exterior cameras
  • Renovate computer server closet

Sustainability

  • Upgrade lighting

Innovation

Centaurus High School is eligible to receive up to $800,000 in additional funds to implement facility improvements that support innovative teaching methods.