Sign In

 

 

Broomfield High Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=23https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}Broomfield High School1 Eagle Way Broomfield, CO 80020http://brh.bvsd.org720.561.8100Phase 21959<img alt="" src="/projects/Project%20Profile%20Images/BroomfieldHS-photo-300x300.JPG" style="BORDER:0px solid;" />$18,567,722$800,000 included in budget

Latest Updates

 

 

October 2018https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=30https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=30{28e838a4-8015-4177-ac17-2576b5d1e514}October 2018Construction at the school is substantially complete. Students and staff are enjoying the new and renovated spaces!
Construction Kick-off Notice to Neighborshttps://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=18https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Notice to Neighborshttps://bond.bvsd.org/projects/Broomfield/Documents/BrHS%20construction%20start%20notification%20postcard%20text%20-%20neighbor%20WEB.pdf, http://bond.bvsd.org/projects/Broomfield/Documents/BrHS%20construction%20start%20notification%20postcard%20text%20-%20neighbor%20WEB.pdf
Construction Kick-off Letter to Familieshttps://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=16https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Letter to Familieshttps://docs.google.com/document/d/1DGwAzks8k4BubqdJv_Z_uoyiAbVQK0KIPmRrYijVWoM/edit?usp=sharing, https://docs.google.com/document/d/1DGwAzks8k4BubqdJv_Z_uoyiAbVQK0KIPmRrYijVWoM/edit?usp=sharing

​    

 

 

July 2018https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=29https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=29{28e838a4-8015-4177-ac17-2576b5d1e514}July 2018FCI Constructors made great progress through the school year, completing the new field house as well as the scoreboard and sound system at the football field. The new tennis courts will be finished soon and resurfacing of the old ones is underway. Now that school is out for the summer, more extensive work is underway both inside and outside the school. Inside the building, the major renovation of the varsity locker rooms, which includes new lockers and showers, is 50 percent complete. Crews also are busy with HVAC repair and replacement, roofing, and new finishes and lighting in the administration suite. The ramp in the hallway near the cafeteria has been demolished, and construction of the stairs to replace it is underway. Highlights of the renovation of the Wilkerson gym, which is nearly complete, include new lighting, a new ceiling, and a refinished floor. Demolition of the library is complete and rebuilding is underway. Improvements will include reconfiguring walls and installing new furniture to create flexible, collaborative learning spaces. The kitchen and cafeteria have been demolished and rebuilding is underway. The new kitchen is framed in and utilities are being installed. Paving of the student parking lot is scheduled to occur the last week in June. The project is on schedule to be substantially complete for the start of school in August.
May 2016 Updatehttps://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=10https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}May 2016 UpdateThe professional design team is working with the design advisory team to develop the schematic design.
DAT Kick-off Letter to Parents April 2016https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=11https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}DAT Kick-off Letter to Parents April 2016https://bond.bvsd.org/projects/Broomfield/Documents/BrHS%20Parent%20Kick%20Off%20Letter.pdf, http://bond.bvsd.org/projects/Broomfield/Documents/BrHS%20Parent%20Kick%20Off%20Letter.pdf
DAT Kick-off Postcard to Neighbors April 2016https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=12https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}DAT Kick-off Postcard to Neighbors April 2016https://bond.bvsd.org/projects/Broomfield/Documents/BrHS%20Neighbor%20Notification%20Postcard%20web.pdf, http://bond.bvsd.org/projects/Broomfield/Documents/BrHS%20Neighbor%20Notification%20Postcard%20web.pdf
October 2016 Updatehttps://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=13https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}October 2016 UpdateThe professinal design team is working with the design advisory team on design development.
December 2016 Updatehttps://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=14https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}December 2016 UpdateThe project team is working on design development. Scroll down to get more details in the DAT meeting minutes.
March 2017https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=15https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=15{28e838a4-8015-4177-ac17-2576b5d1e514}March 2017The project team is finalizing construction documents. Construction is planned to begin in May. Construction dumpsters will be delivered to the site during Spring Break. Scroll down to the DAT section for more information about the project in the meeting minutes.
May 2017https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=19https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}May 2017Broomfield High School Administration met with FCI Constructors and the BVSD Project Manager for our regular weekly Owner Architect Contractor meeting to discuss the mobilization of our Bond Construction. The construction trailer will be moved onto our school site (north of football field) the week of May 8, 2017. Project construction is scheduled to begin with movers in the school on May 25th. Abatement will begin on June 1, following staff/student dismissal for the summer. Additional funding was awarded for the replacement of the east student parking lot asphalt and lighting. This work will take place summer 2018. https://docs.google.com/document/d/1ani9y5O9oeqNf656EWy9KwZIcCmBdImIJ0A25mb-8Ho/edit?usp=sharing, https://docs.google.com/document/d/1ani9y5O9oeqNf656EWy9KwZIcCmBdImIJ0A25mb-8Ho/edit?usp=sharing
July 2017https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=20https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=20{28e838a4-8015-4177-ac17-2576b5d1e514}July 2017Construction is in full swing at the school with work occurring in many areas including the main entry, Science rooms, weight room and areas of the roof. Some areas of the school are receiving new carpet and paint. New lighting and windows coupled with renovations to the HVAC system improvements will boost energy efficiency in the building. This work will continue in other locations next summer. Follow the "Images" link for project photos.
August 2017https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=21https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=21{28e838a4-8015-4177-ac17-2576b5d1e514}August 2017FCI Constructors made great progress on the interior and exterior renovation work at Broomfield High School this summer. The first phase of interior renovation work was substantially complete as planned for the start of school in August. Exterior work will continue through the school year. Work completed over the summer includes renovations to Science rooms, new exterior windows, roof repair/replacement, some new interior doors, new lighting, renovated HVAC system, new card readers on some exterior doors, and a new secure entry vestibule.
October 2017https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=22https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=22{28e838a4-8015-4177-ac17-2576b5d1e514}October 2017Construction work will continue on the school grounds through the 2017-18 school year. Additional work inside the building will take place summer 2018.
November 2017https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=23https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}November 2017Work on exterior athletic facilities is progressing along steadily. At the baseball fields, crews are rebuilding the dugouts and replacing the bleachers, fences and backstop. Other work happening onsite includes renovations to the shot put and discus facilities as well as improvements to the ADA ramp, tennis courts, and irrigation. In the coming weeks, the football concession/restroom building will be demolished to make room for the new field house. Asbestos abatement will occur in the cafeteria over winter break.
December 2017https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=24https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=24{28e838a4-8015-4177-ac17-2576b5d1e514}December 2017Work on exterior athletic facilities is progressing along steadily. At the baseball fields, crews are rebuilding the dugouts and replacing the bleachers, fences and backstop. Other work happening onsite includes renovations to the shot put and discus facilities as well as improvements to the ADA ramp, tennis courts, and irrigation. The football concession/restroom building has been demolished to make room for the new field house. Asbestos abatement will occur in the cafeteria over winter break. https://docs.google.com/a/bvsd.org/document/d/1ZkfFHY7sRydw9BSIHyovCtUKiuKERruXRYmmKOMayDQ/edit?usp=sharing, https://docs.google.com/a/bvsd.org/document/d/1ZkfFHY7sRydw9BSIHyovCtUKiuKERruXRYmmKOMayDQ/edit?usp=sharing
January 2018https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=25https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=25{28e838a4-8015-4177-ac17-2576b5d1e514}January 2018Work on exterior athletic facilities continues. Foundation for the field house has been installed and walls are going up. Concrete has been poured for the ADA ramp. Follow the Images link above for construction photos.
March 2018https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=26https://bond.bvsd.org/projects/Broomfield/Lists/Latest Updates/DispForm.aspx?ID=26{28e838a4-8015-4177-ac17-2576b5d1e514}March 2018Work continues on the field house which is now fully enclosed. Work on the tennis courts is underway. Over Spring Break, demolition and asbestos abatement will occur in the locker rooms.

Project Details

Project Team
Project Manager

 

 

Charles Zachemskyhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}Charles Zachemskycharles.zachemsky@bvsd.org720-561-5954mailto:charles.zachemsky@bvsd.org, mailto:charles.zachemsky@bvsd.org

Architect

 

 

DLR Grouphttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=41{28e838a4-8015-4177-ac17-2576b5d1e514}DLR Grouphttp://www.dlrgroup.com/home/, http://www.dlrgroup.com/home/

Contractor

 

 

FCI Constructors, Inc.https://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}FCI Constructors, Inc.http://www.fciol.com, http://www.fciol.com

Related Resources

 

 

Educational Facilities Master Planhttps://bond.bvsd.org/projects/Broomfield/Lists/Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Broomfield/Lists/Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttps://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=31, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=31page

Details
Project Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=23https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}$18,567,722

Innovation Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=23https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}$800,000 included in budget

Bond Expenditures

 

 

Broomfield High Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=23https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}Broomfield High Schoolhttps://bond.bvsd.org/financial/Documents/CurrentProgramExpenditures.pdf, Bond Program Expenditures

Project Expenditures

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=23https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}https://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=23https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClassAEBA2F0ECF164168A37D2D131B508309"><div>Under development</div></div>

Energy Efficiency/Green Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=23https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClass4B8CCD14297F4A94B8BEFCEC397A41AD"><div><div>To improve energy efficiency, a <a href="/green/Pages/Energy-Efficiency-Glossary.aspx">deep energy retrofit</a> was performed on the building as part of the renovation work. Overall energy efficiency is predicted to improve substantially.  <br></div><div><br></div><div><a href="https://sites.google.com/bvsd.org/energy/2014-bond?authuser=0"><strong>Check out </strong></a>the energy use predictions<br></div><div><a href="https://drive.google.com/file/d/0B7mWrvWeY7DtS2xPQS1peHljd1k/view" style="text-decoration-line:underline;"><img src="/projects/PublishingImages/DeepEnergyLink.JPG" alt="" style="margin:5px;width:300px;" /></a><br></div><div><br></div><div><strong><a href="https://youtu.be/dMftjNETKEI">Learn more </a></strong>about how BVSD is improving energy efficiency in our buildings. <br></div><br><br><br><br><br></div></div>

Educational Innovation Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=23https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClass1B96054D3FC945978A4DB5A07226A9B3">Broomfield High's project will transform the library into a world-class learning commons. The renovated space will reflect current trends in 21st-century libraries that support the BVSD Innovation Guiding Principles of Inquiry, Curiosity, Social Process of Learning, and Personalized Learning. <br><div><br></div><a href="/educational-innovation/Pages/Broomfield-High-Innovation-Project.aspx"><div><strong style="text-decoration:underline;color:#0072c6;">Learn more</strong></div></a><div><br></div></div>

Design Advisory Team

​The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.​ The design advisory team will be created when the project begins. 

Staff 

Ginger Ramsey
John Long
Deann Sickels
Jeff Leonard
Debby Tanigawa
Michele DeBerry
Jane Schissel (librarian)

Parents/Community Members
Chris Genge

Kevin Jacobs
Lisa Abeyta
Matt Fite
Wendy Fiedler

  
​​Community​
Related Resources

 

 

Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/Broomfield/Lists/DAT Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Broomfield/Lists/DAT Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf, http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdfpage

DAT Meeting Schedule

DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting. ​​

 

 

April 13, 2016https://bond.bvsd.org/projects/Broomfield/Lists/DAT Meetings List/DispForm.aspx?ID=1https://bond.bvsd.org/projects/Broomfield/Lists/DAT Meetings List/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}April 13, 2016BHShttps://bond.bvsd.org/projects/Broomfield/DATMeetingDocs/20160413-BROOMFIELD%20HS-DAT-01.pdf, http://bond.bvsd.org/projects/Broomfield/DATMeetingDocs/20160413-BROOMFIELD%20HS-DAT-01.pdf
May 4, 2016https://bond.bvsd.org/projects/Broomfield/Lists/DAT Meetings List/DispForm.aspx?ID=2https://bond.bvsd.org/projects/Broomfield/Lists/DAT Meetings List/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}May 4, 2016BHShttps://bond.bvsd.org/projects/Broomfield/DATMeetingDocs/20150504-BRHS%20MEETING%20MINUTES.pdf, http://bond.bvsd.org/projects/Broomfield/DATMeetingDocs/20150504-BRHS%20MEETING%20MINUTES.pdf
June 1, 2016https://bond.bvsd.org/projects/Broomfield/Lists/DAT Meetings List/DispForm.aspx?ID=3https://bond.bvsd.org/projects/Broomfield/Lists/DAT Meetings List/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}June 1, 2016BHShttps://bond.bvsd.org/projects/Broomfield/DATMeetingDocs/20160601-DAT03-MM.pdf, http://bond.bvsd.org/projects/Broomfield/DATMeetingDocs/20160601-DAT03-MM.pdf
June 8, 2016https://bond.bvsd.org/projects/Broomfield/Lists/DAT Meetings List/DispForm.aspx?ID=4https://bond.bvsd.org/projects/Broomfield/Lists/DAT Meetings List/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}June 8, 2016BHShttps://bond.bvsd.org/projects/Broomfield/DATMeetingDocs/20160608-DAT04-MM.pdf, http://bond.bvsd.org/projects/Broomfield/DATMeetingDocs/20160608-DAT04-MM.pdf
August 3, 2016https://bond.bvsd.org/projects/Broomfield/Lists/DAT Meetings List/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Broomfield/Lists/DAT Meetings List/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}August 3, 2016BHShttps://bond.bvsd.org/projects/Broomfield/DATMeetingDocs/20160803%20-%20Broomfield%20HS-DAT%2005.pdf, http://bond.bvsd.org/projects/Broomfield/DATMeetingDocs/20160803%20-%20Broomfield%20HS-DAT%2005.pdf
August 31, 2016https://bond.bvsd.org/projects/Broomfield/Lists/DAT Meetings List/DispForm.aspx?ID=6https://bond.bvsd.org/projects/Broomfield/Lists/DAT Meetings List/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}August 31, 2016No meeting minutes for this meeting
September 28, 2016https://bond.bvsd.org/projects/Broomfield/Lists/DAT Meetings List/DispForm.aspx?ID=7https://bond.bvsd.org/projects/Broomfield/Lists/DAT Meetings List/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}September 28, 2016BHShttps://bond.bvsd.org/projects/Broomfield/DATMeetingDocs/20160928%20-%20Broomfield%20DAT%2007.pdf, http://bond.bvsd.org/projects/Broomfield/DATMeetingDocs/20160928%20-%20Broomfield%20DAT%2007.pdf
November 30, 2016https://bond.bvsd.org/projects/Broomfield/Lists/DAT Meetings List/DispForm.aspx?ID=8https://bond.bvsd.org/projects/Broomfield/Lists/DAT Meetings List/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}November 30, 2016BHShttps://bond.bvsd.org/projects/Broomfield/DATMeetingDocs/20161130%20-%20Broomfield%20DAT%2008.pdf, http://bond.bvsd.org/projects/Broomfield/DATMeetingDocs/20161130%20-%20Broomfield%20DAT%2008.pdf

Timeline

 

 

Schematic Designhttps://bond.bvsd.org/projects/Broomfield/Lists/Project Timeline/DispForm.aspx?ID=1https://bond.bvsd.org/projects/Broomfield/Lists/Project Timeline/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}Schematic DesignJune 30, 2016Completesuccess
Design Developmenthttps://bond.bvsd.org/projects/Broomfield/Lists/Project Timeline/DispForm.aspx?ID=2https://bond.bvsd.org/projects/Broomfield/Lists/Project Timeline/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Design DevelopmentAugust 2016Completesuccess
Construction Documentshttps://bond.bvsd.org/projects/Broomfield/Lists/Project Timeline/DispForm.aspx?ID=3https://bond.bvsd.org/projects/Broomfield/Lists/Project Timeline/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Construction DocumentsNovember 2016Completesuccess
Constructonhttps://bond.bvsd.org/projects/Broomfield/Lists/Project Timeline/DispForm.aspx?ID=4https://bond.bvsd.org/projects/Broomfield/Lists/Project Timeline/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}ConstructonAugust 2018Completeinfo

Images

    There are no items to show in this view of the "Construction Images" list.

    Scope of Work

    ​Facility Condition

    • Exterior building improvements such as repair/replace windows and doors and paint
    • Replace roof
    • Renovate Science area
    • Remodel kitchen and cafeteria
    • Replace interior doors
    • Asbestos abatement
    • Improvements to interior finishes such as carpet, flooring, ceilings and paint
    • HVAC system improvements
    • Fire protection system improvements
    • Site improvements such as irrigation and paving
    • Renovate auditorium stage area
    • Audio enhancement in every classroom
    • ADA improvements (amended April 19, 2017)

    Program Compatibility Assessment

    • Provide Tech Lab equipment​

    Health and Physical Development

    • ​Replace athletic fixtures such as bleachers and goals
    • Renovate locker rooms
    • Repair/add tennis courts
    • Provide baseball dugout
    • Provide field house
    • Provide multipurpose fitness room
    • Modernize weight room​

    Safety and Security

    • Redesign main entry to provide control over visitor access
    • Replace/add exterior cameras
    • Install camera/intercom security system
    • Install security partitions
    • Install electronic security controls
    • Install interior security cameras (amended May 8, 2018)

    Sustainability​

    • Upgrade HVAC controls
    • Upgrade lighting
    • Conduct retro-commissioning and repairs

    Innovation​

    Broomfield High School is eligible to receive up to $800,000 in additional funds to implement facility improvements that support innovative teaching methods. ​