BCSIS and High Peakshttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=60https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=60{28e838a4-8015-4177-ac17-2576b5d1e514}BCSIS and High Peaks3995 East Aurora Avenue Boulder, CO 80303http://www.bvsd.org/elementary/Pages/default.aspx720.561.6500Phase 21963<img alt="" src="/projects/Project%20Profile%20Images/BCSIS-HP-ES-photo-300x300.JPG" style="BORDER:0px solid;" />$7,627,167$200,000 for each school ($400,000 total) included in budget

Latest Updates

 

 

August 2018https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=28https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=28{28e838a4-8015-4177-ac17-2576b5d1e514}August 2018The construction crews have made tremendous progress and accomplished a significant amount of work over the summer. The building will be ready for students on Aug. 15. Students can look forward to new playgrounds, air conditioning, and new innovation spaces among many other improvements. There will be a portion of the west playground that will still be under construction for several weeks.
Construction Notice to Neighborshttps://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=23https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Notice to Neighborshttps://bond.bvsd.org/projects/BCSIS-HP/Documents/BCSIS%20High%20Peaks%20construction%20start%20notification%20postcard%20text%20web%20-%20neighbor.pdf, http://bond.bvsd.org/projects/BCSIS-HP/Documents/BCSIS%20High%20Peaks%20construction%20start%20notification%20postcard%20text%20web%20-%20neighbor.pdf
Construction Kick-off Letter to Families and Staffhttps://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=22https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=22{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Letter to Families and Staffhttps://docs.google.com/document/d/1duvOqagtwXsKxQKDhpPSNSzO6Pz2X78tyn-XuQa2AYM/edit?usp=sharing, https://docs.google.com/document/d/1duvOqagtwXsKxQKDhpPSNSzO6Pz2X78tyn-XuQa2AYM/edit?usp=sharing

​   

 

 

June 2018https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=26https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=26{28e838a4-8015-4177-ac17-2576b5d1e514}June 2018The new BCSIS kindergarten addition is fully enclosed. Crews are starting to add a moisture barrier and brick veneer to the outside of the addition. Construction has also moved into the interior of the building starting with asbestos abatement, window replacements, HVAC and electrical upgrades, and room renovations. When complete, the interior will have two new innovation spaces, added kindergarten classrooms, a new stage and upgraded interior finishes (including new furniture). The administration offices have been temporarily relocated to Community Montessori (805 Gillaspie Drive, Boulder) school until August.
July 2018https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=27https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=27{28e838a4-8015-4177-ac17-2576b5d1e514}July 2018Himmelman Construction continues to make progress on the renovation work at BCSIS and High Peaks. During the month of June, the contractors were busy removing some existing interior walls, concrete flooring, unit ventilators and windows while updating electrical, mechanical and plumbing. Outside the building, crews have been installing a new roofing system, renovating both east and west playgrounds and completing the exterior envelope of the new kindergarten addition. During the month of July, Himmelman will shift their work to installing new unit ventilators and windows, installing drywall in the new spaces and preparing spaces for new flooring and paint. Crews are working hard to get the building ready for students and staff in August!
May 21, 2018https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=25https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=25{28e838a4-8015-4177-ac17-2576b5d1e514}May 21, 2018Himmelman Construction continues to work on the kindergarten addition. They have poured the concrete foundation and are working to connect the roof line of the existing school with the new addition. They will begin metal wall framing and roofing in the coming week along with mechanical plumbing and electrical rough-ins. Once school is out for the summer, Himmelman construction will expand work into the inside of the school for renovation. Just a reminder the gardens and school site will be closed for the summer. Have a great summer and we are looking forward to a newly renovated school!https://docs.google.com/document/d/1r3dbnhu8QRHpdEfwbj-1aWKWSzaGGvFti7Ci6PbBBuQ/edit?usp=sharing, https://docs.google.com/document/d/1r3dbnhu8QRHpdEfwbj-1aWKWSzaGGvFti7Ci6PbBBuQ/edit?usp=sharing
September 2016https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=10https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}September 2016The design phase for the building renovation project is set to kick-off in September. A Design Advisory Team (DAT) will be selected to work with the architect to develop the project design. Check back for the DAT meeting schedule and minutes.
October 2016https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=11https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}October 2016The professional design team is working with the Design Advisory Team to develop a schematic design.
February 2017https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=12https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}February 2017The project team is working with the design advisory team on Design Development. For more information, see the DAT meeting minutes below. Construction is planned to begin in March.
April 2017https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=13https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}April 2017The project team is preparing for construction to begin in May.
Construction Kick-off Letter to Parentshttps://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=14https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Letter to Parentshttps://docs.google.com/document/d/1QlPG7g87NPwmo3naLQNucQTENIb2UvhMEai96OyVOY4/edit?usp=sharing, https://docs.google.com/document/d/1QlPG7g87NPwmo3naLQNucQTENIb2UvhMEai96OyVOY4/edit?usp=sharing
Construction Kick-off Postcard to Neighborshttps://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=15https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=15{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Postcard to Neighborshttps://bond.bvsd.org/projects/BCSIS-HP/Documents/BCSIS%20High%20Peaks%20construction%20start%20notification%20postcard%20text%20-%20neighbor%20web.pdf, http://bond.bvsd.org/projects/BCSIS-HP/Documents/BCSIS%20High%20Peaks%20construction%20start%20notification%20postcard%20text%20-%20neighbor%20web.pdf
May 2017https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=16https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}May 2017The final construction cost estimate the district received from the general contractor in April exceeds the project budget by $1.6 M, and the project has been postponed until next summer (May-August 2018). The district will bid the project again in the fall and anticipates pricing will be more competitive at that time. The project team is evaluating the possibility of moving forward with some discrete elements of the project this summer. https://docs.google.com/document/d/1WglCtmYio509mEa63YIbfDuJH95VgRMJCx15T5R0UkE/edit?usp=sharing, https://docs.google.com/document/d/1WglCtmYio509mEa63YIbfDuJH95VgRMJCx15T5R0UkE/edit?usp=sharing
August 2017https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=17https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}August 2017Over the summer, the parking lot was repaired, received new seal coat and new striping. Two new pieces of playground equipment were installed - one on each playground. The project is set to go out to bid in November.
October 2017https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=18https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}October 2017The project is currently out to bid. Pre-qualified contractors will submit bids on November 14. Construction will begin next year and be substantially complete for the start of the 2018-19 school year.
January 2018https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=19https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}January 2018The project was successfully bid in November 2017, and construction is planned for summer 2018.
March 2018https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=20https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=20{28e838a4-8015-4177-ac17-2576b5d1e514}March 2018Construction will begin this Spring. Check back for details.
April 2018https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=21https://bond.bvsd.org/projects/BCSIS-HP/Lists/Latest Updates/DispForm.aspx?ID=21{28e838a4-8015-4177-ac17-2576b5d1e514}April 2018Construction is underway and is planned to be complete by August. Construction work during April and May will be limited to the kindergarten addition. Once school is out, more extensive work will begin both inside and outside the building. Asbestos abatement will occur as part of the project and will be conducted in accordance with all applicable regulations. The school and school site will be closed for the summer. https://docs.google.com/document/d/1uylRNlwQ7AmWivYUZBJX8F6rQpVh7UqEcr3VkC5c06c/edit?usp=sharing, https://docs.google.com/document/d/1uylRNlwQ7AmWivYUZBJX8F6rQpVh7UqEcr3VkC5c06c/edit?usp=sharing

Project Details

Project Team
Project Manager

 

 

Gene Temansonhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=55{28e838a4-8015-4177-ac17-2576b5d1e514}Gene Temanson

Architect

 

 

LKA Partnershttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=45{28e838a4-8015-4177-ac17-2576b5d1e514}LKA Partnershttp://markyoungconstruction.com/, http://markyoungconstruction.com/

Contractor

 

 

Himmelman Constructionhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=47{28e838a4-8015-4177-ac17-2576b5d1e514}Himmelman Construction

Related Resources

 

 

Educational Facilities Master Planhttps://bond.bvsd.org/projects/BCSIS-HP/Lists/Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/BCSIS-HP/Lists/Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttps://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=25, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=25page

Details
Project Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=60https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=60{28e838a4-8015-4177-ac17-2576b5d1e514}$7,627,167

Innovation Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=60https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=60{28e838a4-8015-4177-ac17-2576b5d1e514}$200,000 for each school ($400,000 total) included in budget

Bond Expenditures

 

 

BCSIS and High Peakshttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=60https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=60{28e838a4-8015-4177-ac17-2576b5d1e514}BCSIS and High Peakshttps://bond.bvsd.org/financial/Documents/CurrentProgramExpenditures.pdf, Bond Program Expenditures

Project Expenditures

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=60https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=60{28e838a4-8015-4177-ac17-2576b5d1e514}https://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=60https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=60{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClassA31B7CBD84F5411EA346A40776A93294"><div>Under development<br></div></div>

Energy Efficiency/Green Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=60https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=60{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClass6D18EFBEF7724CCE80DD61B953B0C21E"><p>Under development<br></p></div>

Educational Innovation Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=60https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=60{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClassDFE1EBC9E1874CC68268120197770177"><p><strong>BCSIS Innovation Project<br></strong>The school plans to create a flexible space that will be used for a variety of activities such as mindfulness work, drama, Socratic Seminars, presentations, movement and dance, and arts integration. This space will be a room that inspires creativity.  <strong style="text-decoration:underline;color:#ff9933;"><a href="/educational-innovation/Pages/BCSIS-Innovation-Project.aspx"><span style="color:#ff9933;text-decoration:underline;">Learn more</span></a></strong><br></p><p><strong>High Peaks Innovation Project<br></strong>High Peaks plans to use its Innovation funds for three purposes: 1) An intermediate innovation space 2) New classroom furniture for primary classrooms 3) Library Innovations  <span style="text-decoration:underline;color:#ff9933;"><strong style="color:#ff9933;text-decoration:underline;"><a href="/educational-innovation/Pages/High-Peaks-Innovation-Project.aspx"><span style="color:#ff9933;text-decoration:underline;">Learn more</span></a></strong></span><br></p></div>

Design Advisory Team

​The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.​

Staff 

Phil Katsampes, BCSIS Principal
Sabine Smead, BCSIS Teacher
Kiley Lewis, BCSIS Teacher

Jeannie Tynecki, High Peaks Principal
Zach Fink, High Peaks Teacher
Lindsey Pisano, High Peaks Teacher

Lisa Gefke, Office Staff
Rachel Horvath, Preschool Teacher


Parents
Jill Iwaskow, BCSIS
Valerie Seiler, High Peaks

  
​​Community​
Related Resources

 

 

Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/BCSIS-HP/Lists/DAT Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/BCSIS-HP/Lists/DAT Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf, http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdfpage

DAT Meeting Schedule

DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting. ​​

 

 

September 22 | 2:45 - 4:15 p.m.https://bond.bvsd.org/projects/BCSIS-HP/Lists/DAT Meetings List/DispForm.aspx?ID=1https://bond.bvsd.org/projects/BCSIS-HP/Lists/DAT Meetings List/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}September 22 | 2:45 - 4:15 p.m.https://bond.bvsd.org/projects/BCSIS-HP/DATMeetingDocs/DAT1%20CR%202016%2009%2022%20245PM.pdf, http://bond.bvsd.org/projects/BCSIS-HP/DATMeetingDocs/DAT1%20CR%202016%2009%2022%20245PM.pdf
October 4 | 2:45 - 4:15 p.m.https://bond.bvsd.org/projects/BCSIS-HP/Lists/DAT Meetings List/DispForm.aspx?ID=2https://bond.bvsd.org/projects/BCSIS-HP/Lists/DAT Meetings List/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}October 4 | 2:45 - 4:15 p.m.https://bond.bvsd.org/projects/BCSIS-HP/DATMeetingDocs/DAT2%20CR%202016%2010%2004%20245PM.pdf, http://bond.bvsd.org/projects/BCSIS-HP/DATMeetingDocs/DAT2%20CR%202016%2010%2004%20245PM.pdf
October 12 | 2:15 - 4:30 p.m.https://bond.bvsd.org/projects/BCSIS-HP/Lists/DAT Meetings List/DispForm.aspx?ID=3https://bond.bvsd.org/projects/BCSIS-HP/Lists/DAT Meetings List/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}October 12 | 2:15 - 4:30 p.m.https://bond.bvsd.org/projects/BCSIS-HP/DATMeetingDocs/DAT3%20CR%202016%2010%2012%20215PMweb.pdf, http://bond.bvsd.org/projects/BCSIS-HP/DATMeetingDocs/DAT3%20CR%202016%2010%2012%20215PM.pdf
October 26, 2016 | 2:15 - 4:30 p.m.https://bond.bvsd.org/projects/BCSIS-HP/Lists/DAT Meetings List/DispForm.aspx?ID=4https://bond.bvsd.org/projects/BCSIS-HP/Lists/DAT Meetings List/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}October 26, 2016 | 2:15 - 4:30 p.m.https://bond.bvsd.org/projects/BCSIS-HP/DATMeetingDocs/DAT3%20CR%202016%2010%2012%20215PMweb.pdf, http://bond.bvsd.org/projects/BCSIS-HP/DATMeetingDocs/DAT3%20CR%202016%2010%2012%20215PMweb.pdf
November 1 | 2:15 - 4:45 p.m.https://bond.bvsd.org/projects/BCSIS-HP/Lists/DAT Meetings List/DispForm.aspx?ID=5https://bond.bvsd.org/projects/BCSIS-HP/Lists/DAT Meetings List/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}November 1 | 2:15 - 4:45 p.m.https://bond.bvsd.org/projects/BCSIS-HP/DATMeetingDocs/DAT5%20CR%202016%2011%2001%20215PMweb.pdf, http://bond.bvsd.org/projects/BCSIS-HP/DATMeetingDocs/DAT5%20CR%202016%2011%2001%20215PMweb.pdf

Timeline

 

 

Schematic Designhttps://bond.bvsd.org/projects/BCSIS-HP/Lists/Project Timeline/DispForm.aspx?ID=1https://bond.bvsd.org/projects/BCSIS-HP/Lists/Project Timeline/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}Schematic DesignNov. 2016Completeinfo
Design Developmenthttps://bond.bvsd.org/projects/BCSIS-HP/Lists/Project Timeline/DispForm.aspx?ID=2https://bond.bvsd.org/projects/BCSIS-HP/Lists/Project Timeline/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Design DevelopmentDec. 2016Completeinfo
Construction Documentshttps://bond.bvsd.org/projects/BCSIS-HP/Lists/Project Timeline/DispForm.aspx?ID=3https://bond.bvsd.org/projects/BCSIS-HP/Lists/Project Timeline/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Construction DocumentsFeb. 2017Completeinfo
Constructionhttps://bond.bvsd.org/projects/BCSIS-HP/Lists/Project Timeline/DispForm.aspx?ID=4https://bond.bvsd.org/projects/BCSIS-HP/Lists/Project Timeline/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}ConstructionSummer 2018In Progresssuccess

Images

    There are no items to show in this view of the "Construction Images" list.

    Scope of Work

    Facility Condition

    • Roof repair/replacement
    • Repair/replace exterior windows and doors
    • Improvements to interior finishes such as ceilings, wall tile and paint
    • HVAC improvements
    • Plumbing  improvements
    • Fire alarm and communications upgrades
    • Repair/replace fixtures such as casework and countertops
    • Site improvements such as drainage, fencing, paving irrigation, landscaping and playfield renovation
    • Asbestos abatement
    • Improve preschool drop-off
    • Audio enhancement in every classroom
    • Install building-wide air conditioning (amended December 20, 2017)

    Program Compatibility Assessment

    • Provide teacher lounge/workroom
    • Provide additional storage
    • Provide adequate space for full-day kindergarten
    • Provide adequate space for preschool

    Health and Physical Development

    • Upgrade playground equipment and surface materials
    • Renovate preschool playground

    Safety and Security

    • Install camera/intercom security system
    • Install electronic security controls
    • Install security partitions

    Sustainability

    • Conduct retro-commissioning and repairs
    • Upgrade HVAC controls
    • Replace aged boilers with more efficient condensing type

    Innovation

    BCSIS/High Peaks are eligible to receive up to $200,000 each in additional funds to implement facility improvements that support innovative teaching methods.