Arapahoe Campushttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=19https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}Arapahoe Campus6600 East Arapahoe Avenue Boulder, CO 80303http://schools.bvsd.org/p12/arapahoe720.561.5220Phase 21965<img alt="" src="/projects/Project%20Profile%20Images/ArapahoeCampus-photo-300x300.JPG" style="BORDER:0px solid;" />$ 14,637,776$800,000 included in budget

Latest Updates

 

 

July 2020https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=25https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=25{28e838a4-8015-4177-ac17-2576b5d1e514}July 2020Arapahoe Campus is a busy place these days! FCI Constructors is making good progress all around the building and site. Parking lot paving and roof replacement are nearly complete. In the auto shop, masonry work for the new tool storage room and restrooms is complete. A new doorway has been installed to connect with the collision shop next door. In the coming weeks, electrical work will get underway along with flooring installation and painting. Next door in collision repair, renovations are approximately 50% complete with construction of concrete block walls and mechanical and electrical work on-going. In the welding classroom, structural supports have been constructed for the new HVAC system which will be installed this month along with flooring and paint. Work in the new Science lab is moving into the final stages–the room is painted and casework and countertops have been installed. The main office has been painted and the secure entry vestibule is ready for casework and windows. Renovation of the first-floor staff and student restrooms is moving into the final stages with walls in place and wall tile and flooring installation up next.https://docs.google.com/document/d/1-Auw2R_fzDWbfE3mfdkrJw_dRwcz2MRV8vHdbZ3qV7Y/edit?usp=sharing, https://docs.google.com/document/d/1-Auw2R_fzDWbfE3mfdkrJw_dRwcz2MRV8vHdbZ3qV7Y/edit?usp=sharing
Julio 2020https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=24https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=24{28e838a4-8015-4177-ac17-2576b5d1e514}Julio 2020¡El Campus de Arapahoe es un lugar muy ocupado en estos días! FCI Constructors ha progresado mucho dentro del edificio y en los sitios exteriores. Casi han terminado de pavimentar el área de estacionamiento y reemplazar el techo. En el taller de autos se completaron los baños y la albañilería del nuevo almacenamiento de herramientas. Se instaló la nueva puerta para conectar el taller de autos con el taller de colisión. En las próximas semanas comenzará el trabajo eléctrico, junto con la instalación del piso y la pintura. En la sala de reparación de colisión, las renovaciones están alrededor de 50 % completas. Falta terminar de construir las paredes de bloques de concreto y hacer trabajo mecánico y eléctrico. En el salón de soldadura se construyeron soportes estructurales para el nuevo sistema de calefacción, ventilación y aire acondicionado que se instalará este mes junto con el piso y la pintura. El trabajo en el laboratorio de ciencias está en las últimas etapas. El salón tiene pintura nueva y se instalaron los mostradores y la ebanistería. La oficina principal tiene pintura nueva y el vestíbulo seguro está listo para instalar ventanas y ebanistería. La renovación de los baños para estudiantes y empleados en el primer piso está casi completa. Se instalaron las paredes y pronto se instalarán el piso y los mosaicos de cerámica de la pared. https://docs.google.com/document/d/1-nhm9PCFKBI37CnFM43Tew-tp4WGA38jJWvCvCbpAe8/edit?usp=sharing, https://docs.google.com/document/d/1-nhm9PCFKBI37CnFM43Tew-tp4WGA38jJWvCvCbpAe8/edit?usp=sharing
Carta de inicio de construcción a familiashttps://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=20https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=20{28e838a4-8015-4177-ac17-2576b5d1e514}Carta de inicio de construcción a familiashttps://docs.google.com/document/d/1aKpQ4tBdFUXNmYkPIHudEqm9RA6nqHtyO5H4Y0yVZ08/edit?usp=sharing, https://docs.google.com/document/d/1aKpQ4tBdFUXNmYkPIHudEqm9RA6nqHtyO5H4Y0yVZ08/edit?usp=sharing
Construction Kick-off Letter to Familieshttps://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=19https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Letter to Familieshttps://docs.google.com/document/d/1jMSERMzXVIfgQQ9-WyFpupUq5M6pxdR-uESdE1obtJU/edit?usp=sharing, https://docs.google.com/document/d/1jMSERMzXVIfgQQ9-WyFpupUq5M6pxdR-uESdE1obtJU/edit?usp=sharing

 

 

January 2020https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=17https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}January 2020The project team is finalizing construction documents and bids. Construction is planned to occur in 2020. See the DAT meeting minutes for more information about the planned renovations. ​
September 2019https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=15https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=15{28e838a4-8015-4177-ac17-2576b5d1e514}September 2019The project team is working on construction documents.
April 2019https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=10https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}April 2019Design for the project will kick-off later this month. Follow the Design Advisory Team (DAT) link for meeting dates and minutes. Check back here for updates.
August 2019https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=14https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}August 2019The professional project team is working on design development. Follow the DAT link for more information.
May 2020https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=22https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=22{28e838a4-8015-4177-ac17-2576b5d1e514}May 2020The Arapahoe Campus is a busy place these days! With construction underway since March, FCI has made great progress so far. In the auto shop, the floors have been cut through and areas excavated to install new lifts. The welding shop walls have been demolished and new ones framed in to expand the learning area. The walls in the new Science classroom are framed in. Old carpet in the administration area and the Cosmetology shop has been stripped out. Above ceiling work such as electrical improvements and HVAC renovations is taking place throughout the building. Outside the builiding, the east parking lot is being repaved and roof replacement is underway. In the next month, the project will approach 50% completion. Work will begin on the cafeteria renovations which include constructing an elevated presentation space and acoustic treatments.
December 2019https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=16https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}December 2019The project team is finalizing construction documents and bids. Construction is planned to occur in 2020. See the DAT meeting minutes for more information about the planned renovations.
May 2019https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=13https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}May 2019The project team is working with the Design Advisory Team (DAT) to develop the plans for the renovations. Follow the DAT link for the meeting schedule and minutes.
April 2020https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=21https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=21{28e838a4-8015-4177-ac17-2576b5d1e514}April 2020Construction is an exempted activity under the current Stay-at-Home order. Renovations are underway in the Science lab and the auto shop. Crews are making good progress while staff and students are out of school. Check back for updates.
Project Kick-off Letter to Families https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=11https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}Project Kick-off Letter to Families https://docs.google.com/document/d/1XailbYptvDc0UntqyDqbHJkJk-VV6BsER3TmSZQoXjA/edit?usp=sharing, https://docs.google.com/document/d/1XailbYptvDc0UntqyDqbHJkJk-VV6BsER3TmSZQoXjA/edit?usp=sharing
Project Kick-off Letter to Families | en espanol https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=12https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}Project Kick-off Letter to Families | en espanol https://docs.google.com/document/d/1S3dWxPcZTCFMY9uR9QwO1TeIs9Rv33I5iWWddZoklXY/edit?usp=sharing, https://docs.google.com/document/d/1S3dWxPcZTCFMY9uR9QwO1TeIs9Rv33I5iWWddZoklXY/edit?usp=sharing
This project is scheduled to begin in Phase 2. https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=8https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}This project is scheduled to begin in Phase 2.
There are no previsous updates. https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=9https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}There are no previsous updates.
June 2020https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=23https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}June 2020FCI Constructors is making great progress, with work occurring throughout the building. In the auto shop, construction of walls for the new tool storage room is underway, as well as the new replacement restrooms and janitor’s closet. In the coming weeks, ductwork for the new exhaust system will be installed. Next door in collision repair, walls are being reconfigured to create new paint booths and connect to the auto shop tool room. New overhead doors will be installed as well as a new HVAC system. Work continues on the mechanical, electrical, and plumbing, (MEP) systems in the welding classrooms as well as reconfiguring walls to enlarge the space. Drywall has been installed in the new Science suite—up next is painting and casework installation along with MEP work for gas and water lines as well as the exhaust system. The main office is prepped for new carpet, and construction of a secure entry vestibule is underway. Renovation of the first-floor staff and student restrooms to make them ADA accessible continues. Outside the building, roof repair/replacement is on-going. Single-pane windows have been removed and will be replaced with double-pane. In the coming weeks, work will begin in the cafeteria. The project is on track to be ready for occupancy in August. https://docs.google.com/document/d/19n3nrkc9RLzmUIY03BNMYkGc-HWBXA_sab9PlMqdf3E/edit?usp=sharing, https://docs.google.com/document/d/19n3nrkc9RLzmUIY03BNMYkGc-HWBXA_sab9PlMqdf3E/edit?usp=sharing
March 2020https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=18https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Latest Updates/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}March 2020Construction will begin over Spring Break and will be substantially complete by September. Read the construction kick-off letter for more information about what to expect during construction.

Project Details

Project Team
Project Manager

 

 

Charles Zachemskyhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}Charles Zachemskycharles.zachemsky@bvsd.org720-561-5954mailto:charles.zachemsky@bvsd.org, mailto:charles.zachemsky@bvsd.org

Architect

 

 

DLR Grouphttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=41{28e838a4-8015-4177-ac17-2576b5d1e514}DLR Grouphttp://www.dlrgroup.com/home/, http://www.dlrgroup.com/home/

Contractor

 

 

FCI Constructors, Inc.https://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}FCI Constructors, Inc.http://www.fciol.com, http://www.fciol.com

Related Resources

 

 

Educational Facilities Master Planhttps://bond.bvsd.org/projects/ArapahoeCampus/Lists/Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttps://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=23, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=23page

Details
Project Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=19https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}$ 14,637,776

Innovation Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=19https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}$800,000 included in budget

Bond Expenditures

 

 

Arapahoe Campushttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=19https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}Arapahoe Campushttps://bond.bvsd.org/financial/Documents/CurrentProgramExpenditures.pdf, Bond Program Expenditures

Project Expenditures

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=19https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}https://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=19https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClassB7F25F9A30AB439683A65AD905A5A6A6"><div>Under development</div></div>

Energy Efficiency/Green Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=19https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClass9FF9CCDE3C254434B075C505306F72EF"><div>Under development</div></div>

Educational Innovation Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=19https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClass3D44E9FB20A8481F93FC22DA981932DD"><div>Under development</div></div>

Design Advisory Team

​The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.​ The design advisory team will be created when the project begins. 

Staff 

Arlie Huffman, TEC Principal
Joan Bludorn, ARHS Principal
Rick Affleck, Boulder Universal Principal
Kathy Vance, Teacher
William Uttich, Teacher

Parents

  
​​Community​
Related Resources

 

 

Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/ArapahoeCampus/Lists/DAT Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/ArapahoeCampus/Lists/DAT Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf, http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdfpage

DAT Meeting Schedule

DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting. ​​

 

 

April 16, 2019 | 3:15 p.m. - 5 p.m.https://bond.bvsd.org/projects/ArapahoeCampus/Lists/DAT Meetings List/DispForm.aspx?ID=1https://bond.bvsd.org/projects/ArapahoeCampus/Lists/DAT Meetings List/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}April 16, 2019 | 3:15 p.m. - 5 p.m.https://bond.bvsd.org/projects/ArapahoeCampus/DATMeetingDocs/mtg_001_BVSDARHSDATMtg_20190416.pdf, https://bond.bvsd.org/projects/ArapahoeCampus/DATMeetingDocs/mtg_001_BVSDARHSDATMtg_20190416.pdf
April 30, 2019 | 3:15 p.m. - 5 p.m. https://bond.bvsd.org/projects/ArapahoeCampus/Lists/DAT Meetings List/DispForm.aspx?ID=2https://bond.bvsd.org/projects/ArapahoeCampus/Lists/DAT Meetings List/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}April 30, 2019 | 3:15 p.m. - 5 p.m. https://bond.bvsd.org/projects/ArapahoeCampus/DATMeetingDocs/mtg_002_BVSDARHSDATMtg_20190430.pdf, https://bond.bvsd.org/projects/ArapahoeCampus/DATMeetingDocs/mtg_002_BVSDARHSDATMtg_20190430.pdf
May 14, 2019 | 3:15 p.m. - 5 p.m. https://bond.bvsd.org/projects/ArapahoeCampus/Lists/DAT Meetings List/DispForm.aspx?ID=3https://bond.bvsd.org/projects/ArapahoeCampus/Lists/DAT Meetings List/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}May 14, 2019 | 3:15 p.m. - 5 p.m. https://bond.bvsd.org/projects/ArapahoeCampus/DATMeetingDocs/mtg_003_BVSDARHSDATMtg_20190514.pdf, https://bond.bvsd.org/projects/ArapahoeCampus/DATMeetingDocs/mtg_003_BVSDARHSDATMtg_20190514.pdf

Timeline

 

 

Schematic Designhttps://bond.bvsd.org/projects/ArapahoeCampus/Lists/Project Timeline/DispForm.aspx?ID=1https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Project Timeline/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}Schematic DesignJune 2019Completesuccess
Design Developmenthttps://bond.bvsd.org/projects/ArapahoeCampus/Lists/Project Timeline/DispForm.aspx?ID=2https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Project Timeline/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Design DevelopmentAugust 2019Completesuccess
Construction Documentshttps://bond.bvsd.org/projects/ArapahoeCampus/Lists/Project Timeline/DispForm.aspx?ID=3https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Project Timeline/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Construction DocumentsNovember 2019Completesuccess
Construction https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Project Timeline/DispForm.aspx?ID=4https://bond.bvsd.org/projects/ArapahoeCampus/Lists/Project Timeline/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Spring-Fall 2020In Progressinfo

Images

    There are no items to show in this view of the "Construction Images" list.

    Scope of Work

    ​Facility Condition

    • Exterior building improvements such as repair/replace windows and doors and repair masonry
    • Replace roof
    • Restroom renovations
    • Replace interior doors
    • Improvements to interior finishes such as ceilings, carpet, flooring, and paint
    • Asbestos abatement
    • Remodel auto shops
    • HVAC improvements
    • Upgrade fire protection systems
    • Electrical systems improvements
    • Repair/replace fixtures such as lockers and casework
    • Paving
    • Audio enhancement in every classroom

    Program Compatibility Assessment

    • Replace portables with permanent classrooms
    • Replace garage

    Safety and Security

    • Install camera/intercom security system
    • Replace/add exterior cameras
    • Install electronic security controls
    • Install security partitions
    • Install interior security cameras (amended May 8, 2018

    Sustainability​

    • Air distribution system improvements
    • Upgrade HVAC controls
    • Upgrade lighting
    • Conduct retro-commissioning and repairs
    • Replace aged boiler with more efficient condensing type

    Innovation​

    Arapahoe Campus is eligible to receive up to $800,000 in additional funds to implement facility improvements that support innovative teaching methods. ​The funding will be allocated among the programs that share the campus as follows: Arapahoe Ridge High School: $300,000, Boulder TEC: $300,000, Boulder Universal: $200,000.