Angevine Middle Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=18https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}Angevine Middle School1150 West South Boulder Road Lafayette, CO 80026http://anm.bvsd.org720.561.7100Phase 31989<img alt="" src="/projects/Project%20Profile%20Images/AngevineMS-photo-300x300.JPG" style="BORDER:0px solid;" />$9,356,993$400,000 included in budget

Latest Updates

​Construction of the new track and synthetic field is complete!

 

 

June 2019https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=30https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=30{28e838a4-8015-4177-ac17-2576b5d1e514}June 2019The summer is upon us, with the students and staff now off enjoying their summer break! With the building empty, the BVSD Bond construction project for Angevine Middle School is in high gear, with a LOT of construction activity taking place already. As you will note below, work will be taking place throughout the school and around the campus. If you need to talk to someone at the school, the AMS front office staff has been relocated to Centaurus HS and can be reached by phone at the normal school number. Reminder: For everyone’s safety, the entire AMS campus (except the track and open space area to the north) will be off-limits to the public Saturday, May 25 through approximately Aug. 1. We ask that you not come to the site during this time.https://docs.google.com/document/d/1nyy2QjQb2j0EPeYGu16nOdmA5TWSjCdvspig9ztrXeo/edit?usp=sharing, https://docs.google.com/document/d/1nyy2QjQb2j0EPeYGu16nOdmA5TWSjCdvspig9ztrXeo/edit?usp=sharing
Junio 2019https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=29https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=29{28e838a4-8015-4177-ac17-2576b5d1e514}Junio 2019Ahora que ha llegado el verano, ¡los estudiantes y empleados están disfrutando sus vacaciones! Con el edificio vacío, el proyecto de construcción del bono del BVSD está en plena marcha en la Escuela Secundaria Angevine y ya se está haciendo MUCHO trabajo. Como podrán notar a continuación, se está realizando mucho trabajo a través de la escuela y en torno a las instalaciones. Si necesitan hablar con alguien en la escuela, tengan en cuenta que el personal de la oficina de Angevine está trabajando desde la Preparatoria Centaurus y los pueden llamar al número de teléfono normal de la escuela. Recordatorio: Para la seguridad de todos, el campus entero de Angevine (menos el espacio libre al norte) estará cerrado al público desde el sábado 25 de mayo hasta el comienzo de agosto. Pedimos que no visiten a la escuela durante este tiempo. https://docs.google.com/document/d/1tK8pHM0oN04cSNGliO0TGzPD9QpF6RauPW2jmvSizfs/edit?usp=sharing, https://docs.google.com/document/d/1tK8pHM0oN04cSNGliO0TGzPD9QpF6RauPW2jmvSizfs/edit?usp=sharing
Construction Kick-off Postcard to Neighborshttps://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=25https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=25{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Postcard to Neighborshttps://docs.google.com/document/d/1CsASUUtl8UhEX4zm6ZeQQvnKvSwrj_WlhX_anW-4YC8/edit?usp=sharing, https://docs.google.com/document/d/1CsASUUtl8UhEX4zm6ZeQQvnKvSwrj_WlhX_anW-4YC8/edit?usp=sharing
Construction Kick-off Letter to Families and Staffhttps://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=22https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=22{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Letter to Families and Staffhttps://drive.google.com/open?id=1L21fUme6WGbtGq9gIYJfKlEs7F16u9e8bahpgN3sAhw, https://drive.google.com/open?id=1L21fUme6WGbtGq9gIYJfKlEs7F16u9e8bahpgN3sAhw
Carta de inicio de construcciónhttps://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=21https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=21{28e838a4-8015-4177-ac17-2576b5d1e514}Carta de inicio de construcciónhttps://docs.google.com/document/d/1g8SwqTd5yC1NSeTptwlr-Af7_pBD5I50fA5howOHbmw/edit?usp=sharing, https://docs.google.com/document/d/1g8SwqTd5yC1NSeTptwlr-Af7_pBD5I50fA5howOHbmw/edit?usp=sharing

​     

 

 

16 de mayo, 2019https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=28https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=28{28e838a4-8015-4177-ac17-2576b5d1e514}16 de mayo, 2019¡El proyecto de construcción en la secundaria Angevine, fundado por el bono del BVSD, se está preparando para la gran cantidad de trabajo que se hará durante este verano! Aunque el contratista, Roche Construction, solo ha estado presente de vez en cuando desde las vacaciones de primavera, lo notarán en la escuela más durante las próximas semanas mientras transporta equipo de almacenamiento, materiales y un tráiler. Como verán a continuación, hay trabajo programado durante las próximas semanas (la mayoría durante la tarde), incluyendo trabajo fuera del edificio que será el más visible para la comunidad. Tengan presente que para la seguridad de todos el campus entero de Angevine (menos la cancha de béisbol y la pista para correr al lado norte) estará cerrada a la comunidad desde el sábado 25 de mayo hasta el comienzo de agosto. El personal de oficina y los administradores de la escuela se trasladarán a la Escuela Preparatoria Centaurus durante el verano, pero estarán disponibles usando el mismo número de teléfono y dirección de correo electrónico.https://docs.google.com/document/d/1g288P81Gklb-CiaenHxB5KhjEBAuoguC87j92P4Vn1A/edit?usp=sharing, https://docs.google.com/document/d/1g288P81Gklb-CiaenHxB5KhjEBAuoguC87j92P4Vn1A/edit?usp=sharing
Noticias de construcción | 20 de marzo al 4 de abril, 2019https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=24https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=24{28e838a4-8015-4177-ac17-2576b5d1e514}Noticias de construcción | 20 de marzo al 4 de abril, 2019La construcción comenzará durante las vacaciones de primavera cuando se completarán varios proyectos discretos alrededor de la escuela. No habrá actividad de construcción entre las vacaciones de primavera y el final del año escolar. Una vez que termine la escuela, la actividad de construcción se expandirá a todo el edificio y el sitio, que estará cerrado al público durante el verano.https://docs.google.com/document/d/1_NVjhG36l6JMk8kwOQw0MJ_C5DufmvHDxOMTjP77fFM/edit?usp=sharing, https://docs.google.com/document/d/1_NVjhG36l6JMk8kwOQw0MJ_C5DufmvHDxOMTjP77fFM/edit?usp=sharing
February 2019https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=20https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=20{28e838a4-8015-4177-ac17-2576b5d1e514}February 2019The project team is preparing for construction to start in March. Check back for more information about what to expect.
June 2018https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=16https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}June 2018The Design Advisory Team (DAT) is working with the architect to develop the schematic design. Follow the DAT link for the meeting dates and minutes.
May 2019https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=27https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=27{28e838a4-8015-4177-ac17-2576b5d1e514}May 2019The BVSD Bond construction project for Angevine Middle School is ramping up for the large amount of work taking place over the summer! While the contractor, Roche Constructors, has been on site intermittently since Spring Break, you may notice an increased presence as they bring storage units, a trailer, and materials to the site in the coming weeks. Moving forward, there will be work taking place in the evenings, with the site work being the most visible. Please note, for everyone’s safety, the entire AMS campus (except the track/baseball field to the north) will be off-limits to the public Saturday, May 25 through Aug. 1. The AMS office staff and administration will relocate to Centaurus High School during the summer but can be reached via the regular phone number and email. http://https://docs.google.com/document/d/1hbuFTbebbreAOFXapfF_66opYCcgHFBMadrMZVeqa5o/edit?usp=sharing, http://https://docs.google.com/document/d/1hbuFTbebbreAOFXapfF_66opYCcgHFBMadrMZVeqa5o/edit?usp=sharing
September 2018https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=18https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}September 2018The project team is working on design development. Follow the DAT link for design advisory team meeting minutes.
April 2019https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=26https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=26{28e838a4-8015-4177-ac17-2576b5d1e514}April 2019Several discrete projects were completed over Spring Break. There will be no construction activity between now and the end of the school year. Once school is out, construction activity will expand to the entire building and site which will be closed to the public for the summer.
November 2018https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=19https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}November 2018The project team is working on construction documents. Follow the DAT (Design Advisory Team) link for meeting minutes.
Construction Update | March 20, 2019https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=23https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update | March 20, 2019Construction will begin over Spring Break when several discrete projects will be completed around the school. There will be no construction activity between Spring Break and the end of the school year. Once school is out, construction activity will expand to the entire building and site which will be closed to the public for the summer. https://docs.google.com/document/d/1oqZ2Qa1fTcaf_Wae8O1laAq3-ILps9JZNjgQjkq5iGg/edit?usp=sharing, https://docs.google.com/document/d/1oqZ2Qa1fTcaf_Wae8O1laAq3-ILps9JZNjgQjkq5iGg/edit?usp=sharing
August 2018https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=17https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}August 2018The project team is working with the Design Advisory Team (DAT) to develop the schematic design. Follow the DAT link for meeting dates and minutes.
July 2016 Updatehttps://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=10https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}July 2016 UpdateInstallation of the synthetic field and track is underway. See construction photos below. The rest of the project will occur in phase 3.
Field Construction Kick-off Letter to Familieshttps://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=11https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}Field Construction Kick-off Letter to Familieshttps://bond.bvsd.org/projects/Angevine/Documents/AngevineFieldConstructionKick-offLettertoFamilies.pdf, http://bond.bvsd.org/projects/Angevine/Documents/AngevineFieldConstructionKick-offLettertoFamilies.pdf
Field Construction Kick-off Notice to Neighborshttps://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=12https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}Field Construction Kick-off Notice to Neighborshttps://bond.bvsd.org/projects/Angevine/Documents/Angevine%20Field%20Construction%20Kick-off%20Postcard%20to%20Neighbors%20web.pdf, http://bond.bvsd.org/projects/Angevine/Documents/Angevine%20Field%20Construction%20Kick-off%20Postcard%20to%20Neighbors%20web.pdf
Project Kick-off Postcard to Neighborshttps://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=13https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}Project Kick-off Postcard to Neighborshttps://bond.bvsd.org/projects/Angevine/Documents/Angevine%20Neighbor%20DAT%20Start%20Notification%20Postcard%20Web.pdf, http://bond.bvsd.org/projects/Angevine/Documents/Angevine%20Neighbor%20DAT%20Start%20Notification%20Postcard%20Web.pdf
Project Kick-off Letter to Parentshttps://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=14https://bond.bvsd.org/projects/Angevine/Lists/Latest Updates/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}Project Kick-off Letter to Parentshttps://docs.google.com/document/d/1QxK88zYYxIjujBUJLGUnTziCO4BmIIhlpdnZR_Y3V78/edit?usp=sharing, https://docs.google.com/document/d/1QxK88zYYxIjujBUJLGUnTziCO4BmIIhlpdnZR_Y3V78/edit?usp=sharing

Project Details

Project Team
Project Manager

 

 

Mandy Redfieldhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=57{28e838a4-8015-4177-ac17-2576b5d1e514}Mandy Redfieldmandy.redfield@bvsd.org720-561-5953

Architect

 

 

OZ Architecturehttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=25{28e838a4-8015-4177-ac17-2576b5d1e514}OZ Architecturehttp://ozarch.com/, http://ozarch.com/

Contractor

 

 

Roche Constructionhttps://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=50{28e838a4-8015-4177-ac17-2576b5d1e514}Roche Construction303-920-5555

Related Resources

 

 

Educational Facilities Master Planhttps://bond.bvsd.org/projects/Angevine/Lists/Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Angevine/Lists/Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttps://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=22, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=22page

Details
Project Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=18https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}$9,356,993

Innovation Budget

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=18https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}$400,000 included in budget

Bond Expenditures

 

 

Angevine Middle Schoolhttps://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=18https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}Angevine Middle Schoolhttps://bond.bvsd.org/financial/Documents/CurrentProgramExpenditures.pdf, Bond Program Expenditures

Project Expenditures

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=18https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}https://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=18https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Energy Efficiency/Green Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=18https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Educational Innovation Features

 

 

https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=18https://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}Under development

Design Advisory Team

​The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.​ The design advisory team will be created when the project begins. 

Staff 
Mike Medina, Principal
Megan Weir, Assistant Principal
Kathy Castle/Sara Bryan
Dana Langer/Dana Smith
Elizabeth Barcheck
Heather Murphy
Parents

​​Community​
Susan Montoya
Related Resources

 

 

Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/Angevine/Lists/DAT Related Resources/DispForm.aspx?ID=5https://bond.bvsd.org/projects/Angevine/Lists/DAT Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Design Advisory Team Guidelineshttps://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf, http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdfpage

DAT Meeting Schedule

DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting. ​​

 

 

May 16, 2018 | 4-5:30 p.m.https://bond.bvsd.org/projects/Angevine/Lists/DAT Meetings List/DispForm.aspx?ID=1https://bond.bvsd.org/projects/Angevine/Lists/DAT Meetings List/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}May 16, 2018 | 4-5:30 p.m.Angevine Middle Schoolhttps://bond.bvsd.org/projects/Angevine/DATMeetingDocs/2018%200516%20Angevine%20DAT%201.pdf, https://bond.bvsd.org/projects/Angevine/DATMeetingDocs/2018%200516%20Angevine%20DAT%201.pdf
August 29, 2018 | 3:50 - 5:30 p.m.https://bond.bvsd.org/projects/Angevine/Lists/DAT Meetings List/DispForm.aspx?ID=2https://bond.bvsd.org/projects/Angevine/Lists/DAT Meetings List/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}August 29, 2018 | 3:50 - 5:30 p.m.https://bond.bvsd.org/projects/Angevine/DATMeetingDocs/2018%200829%20Angevine%20DAT%202%20web.pdf, https://bond.bvsd.org/projects/Angevine/DATMeetingDocs/2018%200829%20Angevine%20DAT%202%20web.pdf
October 24, 2018 | 8 - 9:30 a.m.https://bond.bvsd.org/projects/Angevine/Lists/DAT Meetings List/DispForm.aspx?ID=3https://bond.bvsd.org/projects/Angevine/Lists/DAT Meetings List/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}October 24, 2018 | 8 - 9:30 a.m.https://bond.bvsd.org/projects/Angevine/DATMeetingDocs/2018%201024%20Angevine%20DAT%203.pdf, https://bond.bvsd.org/projects/Angevine/DATMeetingDocs/2018%201024%20Angevine%20DAT%203.pdf

Timeline

 

 

Schematic Design | July 2018https://bond.bvsd.org/projects/Angevine/Lists/Project Timeline/DispForm.aspx?ID=1https://bond.bvsd.org/projects/Angevine/Lists/Project Timeline/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}Schematic Design | July 2018Completesuccess
Design Development | September 2018https://bond.bvsd.org/projects/Angevine/Lists/Project Timeline/DispForm.aspx?ID=2https://bond.bvsd.org/projects/Angevine/Lists/Project Timeline/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Design Development | September 2018Completesuccess
Construction Documents | October 2018https://bond.bvsd.org/projects/Angevine/Lists/Project Timeline/DispForm.aspx?ID=3https://bond.bvsd.org/projects/Angevine/Lists/Project Timeline/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Documents | October 2018Completesuccess
Construction | March - August 2019https://bond.bvsd.org/projects/Angevine/Lists/Project Timeline/DispForm.aspx?ID=4https://bond.bvsd.org/projects/Angevine/Lists/Project Timeline/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}Construction | March - August 2019In Progressinfo

Images

Scope of Work

Facility Condition

  • Exterior wall improvements such as caulking, painting and masonry repairs
  • Improvements to interior and exterior doors
  • Improvements to interior finishes such as curtains, flooring, carpet, ceiling tiles  and painting  
  • Plumbing improvements
  • HVAC improvements
  • Fire protection improvements
  • Electrical system improvements including emergency generator
  • Repair/replace fixtures such as lockers, bleachers, counter tops
  • Repair/replace operable walls
  • Restroom renovations
  • Site improvements including fencing, paving, sidewalks, drainage, landscape and irrigation
  • Audio enhancement in every classroom

Program Compatibility

  • Provide Special Education classrooms
  • Provide ADA work stations in labs

Health and Physical Development

  • Provide synthetic turf field and track
  • Replace athletic equipment

Safety and Security

  • Install electronic security controls
  • Install security partitions
  • Install exterior cameras
  • Install camera/intercom security system

Sustainability

  • Upgrade HVAC controls
  • Upgrade lighting
  • Replace aged boilers with efficient condensing type

Innovation

Angevine Middle School is eligible to receive up to $400,000 in additional funds to implement facility improvements that support innovative teaching methods.