Whittier International​ Elementary Schoolhttp://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=16http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}Whittier International​ Elementary School2008 Pine Street Boulder, CO 80302http://schools.bvsd.org/p12/whittier720.561.5431Phase 11882<img alt="" src="/projects/Project%20Profile%20Images/WhittierES-photo-300x300.JPG" style="BORDER:0px solid;" />$8,191,139$200,000 included in budget

Latest Updates

 

 

January 2017http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=18http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}January 2017Construction is substantially complete. Students and staff are enjoying the renovations!

 

 

April 2016 Updatehttp://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=3http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}April 2016 UpdateConstruction is planned to begin in April.
January Updatehttp://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=1http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}January UpdateSchematic design is complete. The design team is working on design development. Construction is anticipated to start during Spring Break.
Construction Update July 2016http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=10http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update July 2016JHL Constructors continue to make progress on the Whittier International School. The roof repair on the historical building will be completed by the end of this week. Interior electrical and plumbing work, interior framing and ceiling replacement are all moving forward in classrooms. The building mechanical heating and cooling units are in place and connections are being made throughout the building. The basement flooring has been poured with concrete in older addition. http://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20Construction%20update%20-%20July_SPANISH.pdf, http://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20Construction%20update%20-%20July_SPANISH.pdf
Últimas noticias sobre la construcción en Whittier julio de 2016http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=11http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}Últimas noticias sobre la construcción en Whittier julio de 2016La constructora JHL Constructors continúa haciendo avances en la obra de la Escuela Internacional Whittier. La reparación del techo en el histórico edificio se completará a finales de esta semana. Ha habido avances en el trabajo de electricidad y tubería interior, armazón interior y reemplazo de techos en los salones. Las unidades mecánicas de calefacción y aire acondicionado ya han sido instaladas y se están haciendo las conexiones en todo el edificio. Se ha vertido de cemento el suelo del sótano en áreas que se habían añadido anteriormente.http://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20Construction%20update%20-%20July_SPANISH.pdf, http://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20Construction%20update%20-%20July_SPANISH.pdf
Escuela Primaria Internacional Whittier Últimas noticias sobre la construcciónhttp://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=12http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}Escuela Primaria Internacional Whittier Últimas noticias sobre la construcciónLa Constructora JHL sigue avanzando en la obra en la Escuela Primaria Internacional Whittier. La constructora planea tener la mayor parte del edificio completada para el 13 de agosto cuando los maestros regresen al plantel, con la excepción de porciones del edificio histórico, incluyendo todos los salones de 5º grado y dos de 2º grado. Los estudiantes de esos salones tendrán salones temporales en los edificios modulares ubicados en el patio de juegos. Tendrán aire acondicionado y estarán listos para los estudiantes el 18 de agosto. La escuela hará planes para permitir el traslado de estudiantes de los edificios modulares al edificio principal. Además, la señora Oswick y su personal de oficina estarán alojados temporalmente en un edificio modular ubicado en el patio de recreo a partir del 8 de agosto La oficina será accesible sólo desde la calle Spruce por la entrada de puerta trasera del 8 al 17 de agosto. A partir del 18 de agosto, la oficina y salones temporales serán accesibles desde el edificio principal a través del área de juegos. Los padres podrán dejar y recoger a sus hijos en la calle Pine St., y como de costumbre, la zona para autobuses escolares para dejar y recoger a los estudiantes será en la calle Spruce. Durante los próximos meses, la Constructora JHL seguirá trabajando en el edificio de completar las oficinas de administración, los salones en el nivel inferior, y los salones en el 1er piso en la parte histórica del edificio. Los contratistas trabajarán durante el horario escolar y proporcionarán acceso y cercado controlado para la seguridad del personal y de los estudiantes. http://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20Construction%20Update-%20Summer%20Spanish.pdf, http://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20Construction%20Update-%20Summer%20Spanish.pdf
Construction Update - Back to Schoolhttp://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=13http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update - Back to SchoolJHL Constructors are making progress on Whittier International Elementary School. JHL plans to have a majority of the school building complete by August 13 when the teaching staff returns to the building, with the exception of portions of the historic building, including all 5th grade classrooms and two 2nd grade. The students in these classrooms will have temporary classrooms in the modular buildings located on the playground. They will be air conditioned and ready for students on August 18. The school will make plans to allow for student movement between the modular buildings and the main building. In addition, Mrs. Oswick and her office staff will be temporarily housed in a modular building located on the playground starting August 8. The office will be accessible only from Spruce Street through the back gate entrance August 8-17. Beginning August 18, the temporary office and classrooms will be accessible from the main building via the playground. Parents will be able to drop-off/pick-up on Pine St., and Spruce Street will be the bus loading/unloading zone as usual. During the next few months, JHL Constructors will continue to work in the building completing the administration offices, lower level classrooms, and 1st floor classrooms in the historic portion of the building. The contractors will work during school hours and will provide controlled access and fencing for staff and student safety. We expect construction to be substantially complete in October and all students and staff will return to the main building. http://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20Construction%20Update%20-Summer%20%20English.pdf, http://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20Construction%20Update%20-Summer%20%20English.pdf
Últimas noticias sobre las obras Septiembre de 2016http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=14http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}Últimas noticias sobre las obras Septiembre de 2016La empresa JHL Constructors está dedicando mucho esfuerzo para finalizar las obras de Whittier para finales de septiembre. En estos momentos, sus esfuerzos están dirigidos a terminar la renovación del sótano y el primer piso del edificio histórico, así como a finalizar las oficinas administrativas añadidas y a asegurar el vestíbulo de entrada en el lado norte del edificio. Además, las cuadrillas de obreros están dando los últimos toques en otras áreas del edificio durante las tardes y fines de semana. En las próximas semanas, veremos bastidores y piletas en los salones, nuevos dispositivos de aire acondicionado, nuevas puertas y cerrajería en las aulas, mobiliario suplementario nuevo, ventanas nuevas y zonas ajardinadas en el exterior.http://bond.bvsd.org/projects/Whittier-International/Documents/SPANISHVersionofWhittierConstructionUpdate-September.pdf, http://bond.bvsd.org/projects/Whittier-International/Documents/SPANISHVersionofWhittierConstructionUpdate-September.pdf
Construction Update | September 2016http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=15http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=15{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update | September 2016JHL Constructors are busily working to complete construction at Whittier by the close of September. Currently, they are focused on completing renovations in the basement and first floor of the historical building, as well as completing the addition of the administration offices and secure entry vestibule on the north side of the building. Crews also are completing finishing touches on other areas of the building in the evenings and on weekends. In the coming few weeks, we will see new casework and sinks in classrooms, new air conditioned ventilation, new classroom doors and hardware, additional new furniture, new windows and exterior landscaping. http://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20Construction%20Update-%20September.pdf, http://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20Construction%20Update-%20September.pdf
Construction Update | October 2016http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=16http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update | October 2016Construction is substantially complete! All classes have moved back into the building and the portable classrooms have been removed. Installation of the artificial turf field is underway and is expected to be complete in November. http://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20Construction%20Update-%20October%20English%20Spanish.pdf, http://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20Construction%20Update-%20October.pdf
Construction Update | November 2016http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=17http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update | November 2016Construction of building improvements and the new turf field is substatially complete. Students and staff are enjoying their new renovated spaces.
May 2016 Updatehttp://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=4http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}May 2016 UpdateThe contractor has mobilized to the site and construction is underway on the administrative offices. Crews have excavated the site and will begin to form the foundation with steel rebar and poured concrete. Structural steel will be erected later in the month of May. Front door access has been moved to the east side of the building.http://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20Construction%20Update%20-%20May%2016-20.pdf, http://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20Construction%20Update%20-%20May%2016-20.pdf
Construction Kick-off Letter to Familieshttp://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Letter to Familieshttp://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20construction%20start%20letter%20to%20parents.pdf, http://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20construction%20start%20letter%20to%20parents.pdf
Construction Kick-off Letter to Families - Spanishhttp://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=6http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Letter to Families - Spanishhttp://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20construction%20start%20ltr%20to%20parents_SPANISH.pdf, http://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20construction%20start%20ltr%20to%20parents_SPANISH.pdf
Summer Updatehttp://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=7http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}Summer UpdateIt is a very busy place here at Whittier International, with construction activity occurring in just about every area of the school property. Many workers are onsite to accomplish a significant amount of work over the next couple of months. During the summer, Whittier will be closed to all students, staff and parents. The Garden-to-Table volunteers can access the gardens through the south fence. In July, eight modular classrooms will be installed on the playground to house some classrooms for grades 2-5. The temporary classrooms will be air conditioned and ready for students in August. A detailed plan will be in place to allow for student movement between the modulars and the main building. JHL plans to have a majority of the school building complete by August 8th when staff return to the building. Portions of the historic building will not be accessible, including all 2nd and 5th grade classrooms and two 3rd grade classrooms. We expect all students and staff to be able to return to their renovated classrooms in October. We want to thank you for your patience and support and we look forward to great, newly renovated learning spaces for our students. http://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20construction%20update%20June%202016.pdf, http://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20Construction%20Update%20-Summer%20Update.pdf
June Construction Updatehttp://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=8http://bond.bvsd.org/projects/Whittier-International/Lists/Latest Updates/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}June Construction UpdateIt is a very busy place here at Whittier International, with construction activity occurring in just about every area of the school property. Many workers are onsite to accomplish a significant amount of work over the next couple of months. Access to the school property, including the field and playground, is limited to authorized construction personnel only. For your safety, please respect all boundaries and posted signs. Arrangements for maintenance of the garden during construction have been made with Garden to Table. http://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20construction%20update%20June%202016.pdf, http://bond.bvsd.org/projects/Whittier-International/Documents/Whittier%20construction%20update%20June%202016.pdf

Project Details

Project Team
Project Manager

 

 

Charles Zachemskyhttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}Charles Zachemskycharles.zachemsky@bvsd.org720-561-5954mailto:charles.zachemsky@bvsd.org, mailto:charles.zachemsky@bvsd.org

Architect

 

 

Humphries Polihttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=27{28e838a4-8015-4177-ac17-2576b5d1e514}Humphries Polihttp://hparch.com/, http://hparch.com/

Contractor

 

 

JHLhttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=39{28e838a4-8015-4177-ac17-2576b5d1e514}JHLhttp://www.jhlconstructors.com/, http://www.jhlconstructors.com/

Related Resources

 

 

Educational Facilities Master Planhttp://bond.bvsd.org/projects/Whittier-International/Lists/Related Resources/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Whittier-International/Lists/Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttp://bond.bvsd.org/masterplan/Documents/EdFhttp://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=78acilityMasterPlan.pdf#page=63, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=78page

Details
Project Budget

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=16http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}$8,191,139

Innovation Budget

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=16http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}$200,000 included in budget

Bond Expenditures

 

 

Whittier International​ Elementary Schoolhttp://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=16http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}Whittier International​ Elementary Schoolhttp://bond.bvsd.org/financial/Documents/CurrentProgramExpenditures.pdf, Bond Program Expenditures

Project Expenditures

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=16http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}http://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=16http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClass9BAB9BE3675A43608DA0BF955E490271">Under Development</div>

Energy Efficiency/Green Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=16http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClass2EF7DEAB974A422EB231B0E6D6398289"><a href="/projects">Under development</a></div>

Educational Innovation Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=16http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClass0936CADE3D844091AECFF19626F0B48A">Flexibility and variety of classroom furniture is the main focus of Whittier's innovation project. For flexibility, this means different types of learning spaces according to Thornburg's research on the need for cave, campfires, life and watering hole spaces. Specifically, the project will add more cave spaces and more moveable furniture that can flex into different arrangements. <div><br></div><div>Read more and see photos of <a href="http://bvsdsuccesseffect.org/wp-content/uploads/2016/06/WhittierElementary-InnovationProject.pdf"><strong style="color:#0072c6;">Whittier's Innovation Project</strong></a>. <br></div></div>

Design Advisory Team

​The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.​

Staff
Sarah Oswick, Principal
Karen Wolny, Principal's Assistant
Maurie Marcil, Kindergarten
Loran Lattes, Media Center/Library
Jenn Shepherd, Art
Jenn Silberman, Special Education
Parents
Karen Sperry
Joan Haug

  
​​Community​
James Hewat (City of Boulder)

Related Resources

 

 

DAT Meeting Schedule

DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting. ​​

 

 

JULY 30http://bond.bvsd.org/projects/Whittier-International/Lists/DAT Meetings List/DispForm.aspx?ID=3http://bond.bvsd.org/projects/Whittier-International/Lists/DAT Meetings List/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}JULY 30http://bond.bvsd.org/projects/Whittier-International/DATMeetingDocs/2015-0730WhittierDAT3Minutes.pdf, http://bond.bvsd.org/projects/Whittier-International/DATMeetingDocs/2015-0730WhittierDAT3Minutes.pdf
MAY 20http://bond.bvsd.org/projects/Whittier-International/Lists/DAT Meetings List/DispForm.aspx?ID=2http://bond.bvsd.org/projects/Whittier-International/Lists/DAT Meetings List/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}MAY 20http://bond.bvsd.org/projects/Whittier-International/DATMeetingDocs/2015-0520WhittierDAT2Minutes.pdf, http://bond.bvsd.org/projects/Whittier-International/DATMeetingDocs/2015-0520WhittierDAT2Minutes.pdfhttp://bond.bvsd.org/projects/Whittier-International/DATMeetingDocs/2015-0520WhittierDAT2ScopeList.PDF, http://bond.bvsd.org/projects/Whittier-International/DATMeetingDocs/2015-0520WhittierDAT2ScopeList.PDF
MAY 11http://bond.bvsd.org/projects/Whittier-International/Lists/DAT Meetings List/DispForm.aspx?ID=1http://bond.bvsd.org/projects/Whittier-International/Lists/DAT Meetings List/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}MAY 11http://bond.bvsd.org/projects/Whittier-International/DATMeetingDocs/2015-0511WhittierDAT1Minutes.pdf, http://bond.bvsd.org/projects/Whittier-International/DATMeetingDocs/2015-0511WhittierDAT1Minutes.pdf

Timeline

 

 

Construction is planned to begin in March and be complete by September 2016.

Images

expand + Yr/Month : August 2016 ‎(6)
expand + Yr/Month : July 2016 ‎(7)
expand + Yr/Month : June 2016 ‎(7)

Scope of Work

​Facility Condition

  • Exterior building improvements such as repair/replace windows and doors, repair masonry and paint
  •  Replace roof
  • Replace interior doors
  • Improvements to interior finishes such as carpet, flooring, ceiling tile and paint
  • Asbestos abatement
  • HVAC system improvements
  • Install building-wide air conditioning
  • Electrical system improvements
  • Restroom renovations
  • Repair/replace equipment and fixtures such as casework
  • Site improvements such as drainage, paving and irrigation
  • Audio enhancement in every classroom

Program Compatibility Assessment

  • Provide adequate space for full-day kindergarten
  • ​Provide library support spaces
  • Provide additional storage
  • Provide adequate Special Education space

Health and Physical Development

  • Upgrade playground equipment and surface material

Safety and Security

  • Redesign main entry to provide control over visitor access
  • Install electronic security controls
  • Install camera/intercom security system
  • Install security partitions

Sustainability​

  • Upgrade lighting
  • Upgrade HVAC controls
  • Conduct retro-commissioning and repairs
  • Replace aged boiler with more efficient condensing type

Innovation​

Whittier International School is eligible to receive up to $200,000 in additional funds to implement facility improvements that support innovative teaching methods.