Southern Hills Middle​ Schoolhttp://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=14http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}Southern Hills Middle​ School1500 Knox Drive Boulder, CO 80305http://shm.bvsd.org/720.561.3400Phase 11963<img alt="" src="/projects/Project%20Profile%20Images/SouthernHillsMS-photo-300x300.JPG" style="BORDER:0px solid;" />$9,012,183$400,000 included in budget

Latest Updates

 

 

Construction Update | January 2017http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=26http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=26{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update | January 2017Construction is substantially complete.

 

 

Construction Update April 18-22http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=10http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update April 18-22Inside and outside work continues this week at Southern Hills. Small construction crews will continue work in two shifts, approximately 7 a.m. to 3:00 p.m. and 4 p.m. to midnight. Daytime work will continue on the foundation for the air conditioning unit enclosure. Interior work will continue in the classrooms (north side of school) and commons areas. Please see below for specific details about the upcoming work this week: (1) Continue to remove/install lights in Art, Cafeteria Tech/Shop rooms (2) Continue to install chilled water lines (4”) in shop and cafeteria area. (3) Rough in & inspection of chiller unit foundation. (4) Pour slab-on-grade at the AC unit enclosure. (5) Masonry mobilization later in the week or early in the week of April 25th. (6) Pressure testing installed chilled water system. http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%209.pdf, http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%209.pdf
Construction Update April 25-29http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=11http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update April 25-29Per usual, inside and outside will continue during the course of the week at Southern Hills. Small construction crews will continue work in two shifts, approximately 7 a.m. to 3:00 p.m. and 4 p.m. to midnight. Daytime work will continue on the foundation for the air conditioning unit enclosure. Interior work will expand to multiple areas in the school and commons areas. Please see below for specific details about the upcoming work this week: (1) Continue to remove/install lights in Art, Cafeteria Tech/Shop rooms (2) Continue to install chilled water lines (4”) in shop/art/food lab areas. (3) Install chilled water lines in select corridor areas. (4) Install erosion control by the new AC unit construction area. (5) Begin insulation of chilled water lines. (6) Continue masonry mobilization for AC enclosure. More equipment will be on site in the new AC unit area over the next few weeks. (7) Begin erecting CMU block enclosure for AC unit http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%2010.pdf, http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%2010.pdf
Construction Update May 2-6http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=12http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update May 2-6While both inside and outside will continue during the course of the week at Southern Hills, this coming week will see demolition work added to the slate. Small construction crews will continue work in two shifts, approximately 7 a.m. to 3:00 p.m. and 4 p.m. to midnight. Daytime work will continue on the foundation for the air conditioning unit enclosure. Interior work will continue in multiple areas in the school and commons areas. The most noticeable impact will be the closure of the small gym and locker rooms for the remainder of the school year. For this, and other items, please see the details listed below: 1. Continue to remove/install lights in cafeteria and Art areas. 2. Continue to install chilled water lines (4”) in shop/art/food lab areas as well as cafeteria. 3. Continue installation of insulation of chilled water lines in corridor areas. 4. Continue installation/erecting of CMU block for the AC unit enclosure. 5. Renew limited core drilling in various rooms (for chilled water lines). 6. Mobilize and begin demolition of boys and girls locker rooms next to small gym. http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%2011.pdf, http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%2011.pdf
Construction Update May 9-12http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=13http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update May 9-12Demolition (in the locker room areas) and constructing (AC unit enclosure) are the major activities in the coming week at SHMS. Small construction crews will continue work in two shifts, approximately 7 a.m. to 3:00 p.m. and 4 p.m. to midnight. Daytime work will continue on the foundation for the air conditioning unit enclosure as they continue to construct the walls and lay brick exterior. Interior work will continue in multiple areas in the school and commons areas. For this, and other items, please see the details listed below: 1. Continue to remove/install lights in cafeteria and art areas. 2. Continue installation of chilled water lines in choir and weight rooms. 3. Install conduit homeruns in first floor. 4. Continue installation of CMU block for the AC unit enclosure. 5. Begin laying brick at the AC unit enclosure. 6. Renew limited core drilling in various rooms (for chilled water lines). 7. Continue demolition of boys and girls locker rooms next to small gym. 8. Begin installation of conduit for control wiring (various areas of the school). http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%2012.pdf, http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%2012.pdf
Construction Update May 16-20http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=14http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update May 16-20The week of May 16th will see a continuation of many of the same tasks that began here at SHMS during the week of May 9th. There are very few changes in the work being done, both inside and outside the school, and staff and visitors will notice little change in activity. Please see below for a list of construction activity and other changes under the “What you need to know” section: 1. Install security conduit to the doors. 2. Continue installation of chilled water lines in choir and weight rooms. 3. Continue installation of CMU block for the AC unit enclosure. 4. Begin laying brick at the AC unit enclosure. 5. Continue demolition of boys and girls locker rooms next to small gym. 6. Continue installation of conduit for control wiring (various areas of the school). http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%2013.pdf, http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%2013.pdf
Construction Update May 21-27http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=15http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=15{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update May 21-27The week of May 23rd will see a continuation of many of the same tasks that began here at SHMS during the past few weeks. There are very few changes in the work being done, both inside and outside the school, and staff and visitors will not notice many changes to the current activity. Please see below for a list of construction activity and other changes under the “What you need to know” section: 1. Continue install security conduit to the doors. 2. Complete installation of chilled water lines in choir and weight rooms. 3. Remove bleachers in small gym (near the end of the week). 4. Complete demolition of boys and girls locker rooms next to small gym. 5. Continue installation of conduit for control wiring (various areas of the school). 6. Begin asbestos abatement (end of the week – 5/27). 7. Vacuum of roof during the upcoming weekend. This process will occur during the day from approximately 7 am to 7 pm. Everything possible will be done to minimize the noise with this process but the vacuum truck may have to be placed at several areas around the school to access the various roof areas.
Construction Update May 30-June 3http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=16http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update May 30-June 3The school year is over and FULL construction activities will begin for the duration of the summer! The site will be off limits to the general public as the construction activity will be both inside and outside of the school property. The scope of the work will expand significantly, and the number of personnel on site will grow from the current dozen to approximately 60 people. There is a lot to report, so please see below for a list of construction activity and other changes under the “What you need to know” section: 1. Install electrical conduit in multiple areas of the school. 2. Demo existing cabinet unit hears. 3. Demo existing air handling units (AHU’s) 4. Disconnect power to AHU’s, Food room units and boilers. 5. Continue locker room demolition. 6. Excavate at chilled water unit for underground piping 7. Continuous roof demo and install (complete work area each day). 8. Demo roof “dog houses” 9. Asbestos abatement in various areas, mainly roof units. 10. Concrete demo in the interior courtyard. 11. Install plumbing fixtures in various areas. 12. Remove VCT flooring in cafeteria. 13. Install chilled water lines in second floor classroom areas. 14. Occasional mechanical system shutdowns. http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%2015.pdf, http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%2015.pdf
Construction Update June 6-10http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=17http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update June 6-10As with last week, extensive construction activities continue this week at Southern Hills. Beginning last week, the school property will be off limits to the general public as the construction activity continues both inside and outside of the school property. The scope of the work has expanded significantly, and the number of personnel on site is now approximately 55 - 60 people. Many of last week’s activities continue this coming week, along with a LOT added tasks, so please below, and the “What you need to know” section, for specific details:. 1. Demo existing cabinet unit hears. 2. Demo existing air handling units (AHU’s) 3. Install coils to existing AHU’s 4. Disconnect power to AHU’s, Food room units and boilers. 5. Excavate at chilled water unit for underground piping (including sawcutting) 6. Install Chiller Units 7. Install underground chilled water lines to school 8. Continuous roof demo and install (complete work area each day). 9. Demo roof “dog houses” 10. Asbestos abatement in various areas, mainly roof units. 11. Concrete demo in the interior courtyard. 12. Install plumbing fixtures in various areas. 13. Remove VCT flooring in cafeteria. 14. Install chilled water lines in second floor classroom areas. 15. Occasional mechanical system shutdowns. 16. Begin underground plumbing in locker rooms 17. Continue to remove Hall lockers and doors 18. Install ductwork on second floor 19. Install AHU’s in second floor classrooms 20. Set boilers http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%2016.pdf, http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%2016.pdf
Construction Update June 13-17http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=18http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update June 13-17It is a remarkably busy place here at Southern Hills, with construction activity impacting just about every area of the school property. As with last week, extensive construction activities continue this week at Southern Hills. Beginning last week, the school property will be off limits to the general public as the construction activity continues both inside and outside of the school property. The scope of the work has expanded significantly, and the number of personnel on site is now approximately 55 - 60 people. Many of last week’s activities continue this coming week, along with a LOT added tasks, so please below, and the “What you need to know” section, for specific details:. 1. Demo and replace exterior concrete 2. Install coils to existing AHU’s 3. Roof Demo and replacement (ongoing during summer) 4. Install duct at the first floor 5. Install underground chilled water lines 6. Underground plumbing at the locker rooms 7. Painting (various areas) 8. Install conduit to food service equipment 9. Install water heaters 10. Install conduit to equipment 11. Set boilers 12. Install air handling units 13. Begin installation of pipe to chillers 14. Demo hall lockers and doors – second floor 15. Asbestos abatement in various areas of school http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%2017.pdf, http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%2017.pdf
Construction Update June 20-24, 2016http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=19http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update June 20-24, 2016Things are pretty beat up in and around the Southern Hills site these days….lots going on. Highly invasive and impactful construction projects happening throughout the school, with most of the demolition work completed and beginning to slowly put things back together. Similar to the past few weeks, the school property will be off limits to the general public for obvious safety and security reasons Again, most of last week’s activities continue this coming week so please see below, and the “What you need to know” section, for specific details: 1. Demo and replace exterior concrete 2. Install coils to existing AHU’s 3. Roof Demo and replacement (ongoing during summer thru the end of July) 4. Install duct at the first floor 5. Prep/pour slab on grade in locker rooms 6. Install pipe to chillers 7. Underground plumbing inspection in locker room areas 8. Painting (ongoing throughout the school thru the end of July) 9. Install emergency lighting circuit 10. Install water heaters 11. Install conduit at boiler room 12. Set boilers 13. Install air handling units 14. Begin installation of pipe to air handling units 15. Refeed elevators 16. Asbestos abatement completed 17. Begin removal of fencing & concrete at Manwaring field
January Updatehttp://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=2http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}January UpdateBidding is underway. Construction is anticipated to begin in February.
Construction Update June 27 - July 1http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=20http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=20{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update June 27 - July 1Most of the demolition/removal items have been completed and the contractor has “turned the corner”- beginning to put things back together both inside and outside the school. There has been a remarkable amount of progress made so far, especially inside the school, and the contractor will continue to work six days a week through the month of July (except the weekend of July 4th). Follow link for construction details. http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%2019.pdf, http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%2019.pdf
Construction Update July 25-29http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=21http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=21{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update July 25-29Construction inside the school has turned a big corner and will begin to taper down after this week of work. The one exception is in the library area which will continue to see work done into the middle/late August. Note that we hope to have the entire project completed, both inside and out, by the end of August. Roofing work is scheduled to be completed by early August. http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%2021.pdf, http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%2021.pdf
Construction Update Aug. 1-5http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=22http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=22{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update Aug. 1-5Construction continues to taper down this week at Southern Hills. There is still much to do, but the school is beginning to return the structure we knew before late spring! The project will be substantially complete by the start of school and entirely complete by the end of August. Roofing work is scheduled to be completed by early August. Follow the link for more details. http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%2022.pdf, http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMS%20Bond%20Update%2022.pdf
Construction Update - Back to School!http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=23http://bond.bvsd.org/projects/Southern-Hills/Lists/Latest Updates/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update - Back to School!Construction continues to taper down as crews finish up work to ready the building for the start of school. We will see a noticeable drop in equipment, traffic and personnel onsite over the next few weeks. Roofing work is scheduled to be completed by Aug 12. (Good-bye smelly tar kettles!) Furniture will be moved back into the building on Monday (8/8) and final inspections will occur Tuesday (8/9). Teachers and staff are asked not to return until Wednesday (8/10). Clean up of the north side of the site and removal of the Conex trailers will occur the week of Aug. 15. The project will be substantially complete for the start of school, and we will return to business as usual. However, there will be a few final tasks ongoing through August and September such as landscaping, delivery of new library furniture and casework, student center window installation and elevator renovation. This work will occur with minimal disruption to learning. http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMSBondUpdate231.docx.pdf, http://bond.bvsd.org/projects/Southern-Hills/Documents/SHMSBondUpdate231.docx.pdf

Project Details

Project Team
Project Manager

 

 

Mark Schlindweinhttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}Mark Schlindweinmark.schlindwein@bvsd.org720-561-5953mailto:mark.schlindwein@bvsd.org, mailto:mark.schlindwein@bvsd.org

Architect

 

 

Davis Partnershipshttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=33{28e838a4-8015-4177-ac17-2576b5d1e514}Davis Partnershipshttp://davispartnership.com/, http://davispartnership.com/

Contractor

 

 

Sampson http://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=34{28e838a4-8015-4177-ac17-2576b5d1e514}Sampson http://www.sampson-construction.com/, http://www.sampson-construction.com/

Related Resources

 

 

Educational Facilities Master Planhttp://bond.bvsd.org/projects/Southern-Hills/Lists/Related Resources/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Southern-Hills/Lists/Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttp://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=74, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=74page

Details
Project Budget

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=14http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}$9,012,183

Innovation Budget

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=14http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}$400,000 included in budget

Bond Expenditures

 

 

Southern Hills Middle​ Schoolhttp://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=14http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}Southern Hills Middle​ Schoolhttp://bond.bvsd.org/financial/Documents/CurrentProgramExpenditures.pdf, Bond Program Expenditures

Project Expenditures

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=14http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}http://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=14http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClassCA007787F7E4498399C28FD7532688E6"><div>Under development</div></div>

Energy Efficiency/Green Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=14http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClass69981F1AE4874487A7CA3891D76DAB41"><div>Under development</div></div>

Educational Innovation Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=14http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClassA42C55AF16774EFCA9B14F6FEC3A3C29">Southern Hills' innovation project will renovate the library space to include flexible learning spaces, collaborative areas, a creation space and a presentation area. <div><br></div><div>Read more and see photos of <a href="http://bvsdsuccesseffect.org/wp-content/uploads/2016/06/SouthernHilllsMS-InnovationProject.pdf"><strong style="color:#0072c6;">Southern Hills' Innovation Project</strong></a><strong>. </strong></div></div>

Design Advisory Team

​The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.​

Staff
Chavonne Gloster, Principal
Laurie Carter, Language Arts
Jeff Sanders,  8th Grade
Chris Congedo, Conselor
Tony Novak, Physical Education
Peter Kingsley, Physical Education
Parents
Meredith Bacus
Community

Related Resources

 

 

Sign up to receive email updateshttp://bond.bvsd.org/projects/Southern-Hills/Lists/DAT Related Resources/DispForm.aspx?ID=6http://bond.bvsd.org/projects/Southern-Hills/Lists/DAT Related Resources/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}Sign up to receive email updateshttps://docs.google.com/forms/d/1jjQn5aKSmazvR1ms9EVUpdiLPnL3EQ9E-pRmjPKsQ0E/viewform?usp=send_form, https://docs.google.com/forms/d/1jjQn5aKSmazvR1ms9EVUpdiLPnL3EQ9E-pRmjPKsQ0E/viewform?usp=send_formexternal
Design Advisory Team Guidelineshttp://bond.bvsd.org/projects/Southern-Hills/Lists/DAT Related Resources/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Southern-Hills/Lists/DAT Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Design Advisory Team Guidelineshttp://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf, http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdfpage

Neighborhood Meetings RE: Air Conditioning

Sept. 9 | Presentation | Summary & Next Steps

Oct. 22 | Presentation

DAT Meeting Schedule

DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting. ​​

 

 

NOV. 5 - DAT#3 MEETINGhttp://bond.bvsd.org/projects/Southern-Hills/Lists/DAT Meetings List/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Southern-Hills/Lists/DAT Meetings List/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}NOV. 5 - DAT#3 MEETING
OCT. 22 - NEIGHBORHOOD MEETINGS RE: AIR CONDITIONINGhttp://bond.bvsd.org/projects/Southern-Hills/Lists/DAT Meetings List/DispForm.aspx?ID=4http://bond.bvsd.org/projects/Southern-Hills/Lists/DAT Meetings List/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}OCT. 22 - NEIGHBORHOOD MEETINGS RE: AIR CONDITIONINGhttp://bond.bvsd.org/projects/Southern-Hills/DATMeetingDocs/2015-1022-SHMSCommunityPresentation.pdf, http://bond.bvsd.org/projects/Southern-Hills/DATMeetingDocs/2015-1022-SHMSCommunityPresentation.pdf
SEPT. 9 - NEIGHBORHOOD MEETINGS RE: AIR CONDITIONINGhttp://bond.bvsd.org/projects/Southern-Hills/Lists/DAT Meetings List/DispForm.aspx?ID=3http://bond.bvsd.org/projects/Southern-Hills/Lists/DAT Meetings List/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}SEPT. 9 - NEIGHBORHOOD MEETINGS RE: AIR CONDITIONINGhttp://bond.bvsd.org/projects/Southern-Hills/DATMeetingDocs/2015-0909-SHMSCommunity-ACPresentation.pdf, http://bond.bvsd.org/projects/Southern-Hills/DATMeetingDocs/2015-0909-SHMSCommunity-ACPresentation.pdfhttp://bond.bvsd.org/projects/Southern-Hills/DATMeetingDocs/2015-0909-SHMS-AC-UpdateMemo.pdf, http://bond.bvsd.org/projects/Southern-Hills/DATMeetingDocs/2015-0909-SHMS-AC-UpdateMemo.pdf
AUG. 18 - DAT#2 MEETINGhttp://bond.bvsd.org/projects/Southern-Hills/Lists/DAT Meetings List/DispForm.aspx?ID=2http://bond.bvsd.org/projects/Southern-Hills/Lists/DAT Meetings List/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}AUG. 18 - DAT#2 MEETINGhttp://bond.bvsd.org/projects/Southern-Hills/DATMeetingDocs/2015-0818-SHMSDAT2Minutes.pdf, http://bond.bvsd.org/projects/Southern-Hills/DATMeetingDocs/2015-0818-SHMSDAT2Minutes.pdf
JUNE 2 - DAT#1 MEETINGhttp://bond.bvsd.org/projects/Southern-Hills/Lists/DAT Meetings List/DispForm.aspx?ID=1http://bond.bvsd.org/projects/Southern-Hills/Lists/DAT Meetings List/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}JUNE 2 - DAT#1 MEETINGhttp://bond.bvsd.org/projects/Southern-Hills/DATMeetingDocs/2015-0602-SHMSDAT1Minutes.pdf, http://bond.bvsd.org/projects/Southern-Hills/DATMeetingDocs/2015-0602-SHMSDAT1Minutes.pdf

Timeline

 

 

Constructionhttp://bond.bvsd.org/projects/Southern-Hills/Lists/Project Timeline/DispForm.aspx?ID=4http://bond.bvsd.org/projects/Southern-Hills/Lists/Project Timeline/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}ConstructionFeb. - Aug. 2016Completeinfo
Final Guaranteed Maximum Pricehttp://bond.bvsd.org/projects/Southern-Hills/Lists/Project Timeline/DispForm.aspx?ID=3http://bond.bvsd.org/projects/Southern-Hills/Lists/Project Timeline/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Final Guaranteed Maximum PriceDec. 18Completewarning
Construction Documentshttp://bond.bvsd.org/projects/Southern-Hills/Lists/Project Timeline/DispForm.aspx?ID=2http://bond.bvsd.org/projects/Southern-Hills/Lists/Project Timeline/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Construction DocumentsJan. 15, 2016Completesuccess
Initial Guaranteed Maximum Pricehttp://bond.bvsd.org/projects/Southern-Hills/Lists/Project Timeline/DispForm.aspx?ID=1http://bond.bvsd.org/projects/Southern-Hills/Lists/Project Timeline/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}Initial Guaranteed Maximum PriceSept. 21 - Oct. 16Completewarning

Images

expand + Yr/Month : June 2016 ‎(13)

Scope of Work

​Facility Condition

  • Exterior building improvements such as repair/replace windows and doors, repair masonry and paint
  • Replace roof
  • Restroom renovations including ADA
  • Replace interior doors
  • Improvements to interior finishes such as carpet, flooring, ceilings and paint
  • Asbestos abatement
  • Install building-wide air conditioning
  • Electrical system upgrades
  • Repair/replace intercom and communication systems
  • Replace fixtures and equipment such as bleachers, lockers and kitchen equipment
  • Site improvements such as drainage, paving and irrigation
  • Audio enhancement in every classroom**
Health and Physical Development
  • Renovate baseball field
Safety and Security
  • Install electronic security controls
  • Install camera/intercom security system
  • Install security partitions
  • Install exterior cameras

Sustainability​

  • Upgrade HVAC controls
  • Upgrade lighting
  • Conduct retro-commissioning and repairs
  • Replace aged boiler with more efficient condensing type

Innovation​

  • Southern Hills Middle School is eligible to receive up to $400,000 in additional funds to implement facility improvements that support innovative teaching methods.

** Not included in project budget​​​