Alicia Sanchez International Schoolhttp://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=13http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}Alicia Sanchez International School655 Sir Galahad Drive Lafayette, CO 80026http://schools.bvsd.org/p12/Sanchez720.561.7300Phase 11986<img alt="" src="/projects/Project%20Profile%20Images/AliciaSanchezES-photo-300x300.JPG" style="BORDER:0px solid;" />$5,654,328$200,000 included in budget

Latest Updates

 

 

Construction Update http://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=14http://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update Construction is substantially complete.

 

 

Últimas noticias sobre la construcción #7http://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=12http://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}Últimas noticias sobre la construcción #7Se ha completado una enorme cantidad de trabajo hasta ahora en la Escuela Internacional Alicia Sánchez…con muchas más tareas por completar durante el siguiente mes. Casi todas las áreas de la escuela han sido y serán incluidas en este proyecto y la presión durante el próximo mes de julio será para tener lista la escuela para el personal y los estudiantes para principios de agosto. A continuación se encuentran detalles específicos sobre el trabajo que se realizará en las próximas semanas:http://bond.bvsd.org/projects/Sanchez-International/Documents/Sanchez%20Elementary_Bond%20Update%207_SPANISH.pdf, http://bond.bvsd.org/projects/Sanchez-International/Documents/Sanchez%20Elementary_Bond%20Update%207_SPANISH.pdf
December Updatehttp://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=1http://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}December UpdateThe design team is working on design development drawings. http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf#page=6, More information about design development
Construction Update June 2016http://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=10http://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update June 2016The contents of the classrooms were removed/stored on Memorial Day weekend and full summer construction activity has now begun at Alicia Sanchez International! Please note that there will be a great deal of activity on the school site over the summer and we ask that you avoid coming onto the school site whenever possible. Please see below for specific work that will be completed in the month of June, both inside and outside of the school: JUNE – 2016 Construction Activity: 1. Continue installation of concrete pit ramp/curb by chiller 2. Complete installation of duct work in classrooms 3. Demo ceilings (corridors), framing, louvre openings, etc. 4. Install Lintel, rough controls 5. Reframing, drywall covering of louvre openings. 6. Set AC units and install controls 7. Install grid in corridor ceilings 8. Install windows in various areas of the school 9. Finish chiller enclosure 10. Set new boiler and equipment (controls, etc.) 11. Install new transformer unit and run electrical lines 12. Install new piping throughout the school 13. New Entry: Demo, structure work, framing, roofing, mech/electrical install, install new ceiling & entry doors, begin stucco 14. New Pre – K Classrooms: Demo area, relocate plumbing, framing, drywall/tape, mech/electrical install, paint 15. Roof/Penthouse: Remove louvre, remove AHU’s, install new AHU’s, demo electric, terminate piping, duct, electrical 16. Restrooms: Selective demo, plumbing rough-in, framing, CMU work on walls, install drywall/tape, finish & paint http://bond.bvsd.org/projects/Sanchez-International/Documents/Sanchez%20Elementary_Bond%20Update%206_SPANISH.pdf, http://bond.bvsd.org/projects/Sanchez-International/Documents/Sanchez%20Elementary_Bond%20Update%206_SPANISH.pdf
Construction Update July 2016http://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=11http://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update July 2016An enormous amount of work has been completed so far here at Alicia Sanchez International Elementary School….with plenty of tasks to complete in the month ahead. Almost every area of the school has been/will be touched by this project and the push over the coming month of July is to have the school ready for staff and students come early August. Follow this link for details about the upcoming work: http://bond.bvsd.org/projects/Sanchez-International/Documents/Sanchez%20Elementary%20-%20Bond%20Update%207.pdf, http://bond.bvsd.org/projects/Sanchez-International/Documents/Sanchez%20Elementary%20-%20Bond%20Update%207.pdf
Construction Update | September 2016http://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=13http://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update | September 2016The project is substantially complete with just construction of the main entry on-going until mid-September.
March 2016 Updatehttp://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=3http://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}March 2016 UpdateThe project team is working on construction documents. Construction is anticipated to begin over Spring Break.
March 14-25 Updatehttp://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=4http://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}March 14-25 UpdateMarch 21 – 25: Staging for construction will begin on the north side of the school, just west of the faculty parking lot, with fencing and trailers being put in place over Spring Break (next week). In addition, work will begin on the inside of the school. The primary area of focus will be on the installation of ductwork in the cafeteria and gymnasium. Construction will take place during the daytime this week as students and staff are gone for Spring Break. March 28 – April 1: Construction will be centered on the following classrooms: #123, 127, 128, 134, and 135. Installation of ductwork, chilled water lines and electrical is the primary focus for these areas. The work in each room is expected to take approximately 2 nights to complete. Construction will take place during the evening hours beginning this week and will continue at this time through the end of the school year. Note: The bulk of the work at Sanchez Elementary this spring will be done inside the school itself. The work shift will begin after school hours and into the evening (approximately 4 p.m. – 12 p.m.). During Spring Break, and after Memorial Day, construction work will be done during the day time, with a shift time of approximately (7 a.m. – 5:30 p.m.) http://bond.bvsd.org/projects/Sanchez-International/Documents/Sanchez%20Elementary%20-%20Bond%20Update%201.pdf, Get the details
Construction Kick-off Letter to Families - English and Spanishhttp://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Letter to Families - English and Spanishhttp://bond.bvsd.org/projects/Sanchez-International/Documents/Sanchez%20construction%20kick-off%20ltr%20to%20families%20both.pdf, http://bond.bvsd.org/projects/Sanchez-International/Documents/Sanchez%20construction%20kick-off%20ltr%20to%20families%20both.pdf
Construction Kick-off Notification to Neighborshttp://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=6http://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Notification to Neighborshttp://bond.bvsd.org/projects/Sanchez-International/Documents/SanchezConstKick-offNeighborsweb.pdf, http://bond.bvsd.org/projects/Sanchez-International/Documents/SanchezConstKick-offNeighborsweb.pdf
Construction Update April 11-22, 2016http://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=7http://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update April 11-22, 2016A lot of progress has been made inside the school as mechanical work continues in each room during the evening hours. Construction during the next two weeks will be focused on continuing the prep work for the air conditioning which will be brought into the school next year! Structural mounts, core holes, hangers for pipes and fittings for the new unit ventilators (which will be installed in each room) are being put in place in both the classrooms and corridor areas. The contractor is currently planning for the next phase of work (beginning approximately May 1). The following rooms & corridors will be worked on over the next three weeks  April 11 - 15: Rooms 117, 118, 121, 123, 122, 127, corridors 505, 506 & 507. Construction will take place during the daytime on Friday through Monday, April 15 – 18, as students and staff are off school on these days (enjoy the four day weekend!).  April 18 - 22: Rooms 114, 115, 116, complete work in rooms 117, 118, 121. Finally, work will take place in corridor 503. Reminder that construction will take place during the daytime on Monday, April 18th of this week. Note: The bulk of the work at Sanchez Elementary this spring will be done inside the school itself. The work shift will begin after school hours and into the evening (approximately 4 p.m. – 12 p.m.). Beginning approximately May 1, some outside work will begin on the north side of the school but plans have not been finalized at this point. We will keep you informed once a specific plan is put in place! http://bond.bvsd.org/projects/Sanchez-International/Documents/Sanchez%20Elementary%20-%20Bond%20Update%202.pdf, http://bond.bvsd.org/projects/Sanchez-International/Documents/Sanchez%20Elementary%20-%20Bond%20Update%202.pdf
Construction Update April 26- May 6http://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=8http://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update April 26- May 6Alliance Construction continues to make strong headway on the mechanical system preparation & installation in rooms throughout the school. Construction during the next two weeks will continue as it has over the past month with prep work (pipes, hangers, duct installation) for the air conditioning the primary focus. Structural mounts, core holes, hangers for pipes and fittings for the new unit ventilators (which will be installed in each room) are all being put in place in both the classrooms and corridor areas. http://bond.bvsd.org/projects/Sanchez-International/Documents/Sanchez%20Elementary%20-%20Bond%20Update%203.pdf, http://bond.bvsd.org/projects/Sanchez-International/Documents/Sanchez%20Elementary%20-%20Bond%20Update%203.pdf
Construction Update May 23 - 30http://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=9http://bond.bvsd.org/projects/Sanchez-International/Lists/Latest Updates/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update May 23 - 30Alliance Construction will continue in the outside area, primarily the chiller enclosure and items related items for that structure. Note that on May 27th and 28th, there will be a full move of the classroom items to either the gym area or to Conex containers. Full construction will begin on Tuesday, May 31st and the entire site will be off limits to students, staff and visitors (this includes the entire outside area and inside the school. Please see the information below for specific details regarding the work to be done each week:  May 23 - 27: Demo of sidewalk out by construction trailer, begin installation of chiller enclosure and installation of electrical run to chiller transformer. Note: Moving of school classrooms and offices on May 27 – 28.  May 30 – June 3: Full construction begins both inside and outside of school! Demo of ceilings, setting of the boiler and chiller as well as installation of transformer unit. http://bond.bvsd.org/projects/Sanchez-International/Documents/Sanchez%20Elementary%20-%20Bond%20Update%205.pdf, http://bond.bvsd.org/projects/Sanchez-International/Documents/Sanchez%20Elementary%20-%20Bond%20Update%205.pdf

Project Details

Project Team
Project Manager

 

 

Marion Hammondhttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=15{28e838a4-8015-4177-ac17-2576b5d1e514}Marion Hammondmarion.hammond@bvsd.org720-561-5081mailto:marion.hammond@bvsd.org, mailto:marion.hammond@bvsd.org

Architect

 

 

Coover Clark http://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=22{28e838a4-8015-4177-ac17-2576b5d1e514}Coover Clark http://www.cooverclark.com/, http://www.cooverclark.com/

Contractor

 

 

Alliance Construction Solutionshttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}Alliance Construction Solutionshttp://www.allianceconstruction.com/, http://www.allianceconstruction.com/

Related Resources

 

 

Educational Facilities Master Planhttp://bond.bvsd.org/projects/Sanchez-International/Lists/Related Resources/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Sanchez-International/Lists/Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttp://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=72, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=72page

Details
Project Budget

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=13http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}$5,654,328

Innovation Budget

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=13http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}$200,000 included in budget

Bond Expenditures

 

 

Alicia Sanchez International Schoolhttp://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=13http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}Alicia Sanchez International Schoolhttp://bond.bvsd.org/financial/Documents/CurrentProgramExpenditures.pdf, Bond Program Expenditures

Project Expenditures

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=13http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}http://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=13http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClassB98B8F67A74B4AC393DC78E01C0C9703"><div>Under development</div></div>

Energy Efficiency/Green Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=13http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClassD8625823B5B648F6ACDBE40147D02E6A"><div>Under development</div></div>

Educational Innovation Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=13http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClass255A48D918544B06B35652C5BD6DA1D7">The school's library (Inquiry Center) was upgraded to create a 21st Century Learning Environment for digital learning and literacy, complete with flexible furniture, docking stations for computers, a maker's space, and creative library, media, technology, and community centers. </div><div class="ExternalClass255A48D918544B06B35652C5BD6DA1D7"><br></div><div class="ExternalClass255A48D918544B06B35652C5BD6DA1D7"><a href="/educational-innovation/Pages/SanchezInnovation.aspx"><strong style="color:#0066cc;"><span style="color:#0066cc;">Click here for photos and more information </span></strong></a><br></div><div class="ExternalClass255A48D918544B06B35652C5BD6DA1D7"><br></div><p><a href="/educational-innovation/Pages/SanchezInnovation.aspx"><img src="/projects/Sanchez-International/PublishingImages/InnovationSwayLink.JPG" alt="" style="margin:5px;width:233px;height:175px;" /></a><br></p>

Design Advisory Team

​The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.​

Staff 

Lora De La Cruz, Principal
Kristy Krause, Asst. Principal
Soco Franco, Principal's Assistant
Nichole Villa, Preschool Teacher
Rachelle Weigold5th Gr. Teacher
Terri Mitchell, IB Teacher
Jennifer Motolenich​, Music Teacher
Erin Brennan, SpEd
Retta Kelly, Library/Media

Parents

Raven Chunig
Annette Thull​
Corinne Fresquez

​Community​

Doris Candelarie, Past Principal
Fran Ryan, Impact on Education
Gustavo Reyna, Mayor Pro-tem Lafayette​​

Related Resources

 

 

Design Advisory Team Guidelineshttp://bond.bvsd.org/projects/Sanchez-International/Lists/DAT Related Resources/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Sanchez-International/Lists/DAT Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Design Advisory Team Guidelineshttp://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf, http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdfpage

DAT Meeting Schedule

DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting. ​​

 

 

Jan. 11, 2016http://bond.bvsd.org/projects/Sanchez-International/Lists/DAT Meetings List/DispForm.aspx?ID=6http://bond.bvsd.org/projects/Sanchez-International/Lists/DAT Meetings List/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}Jan. 11, 2016http://bond.bvsd.org/projects/Sanchez-International/DATMeetingDocs/201507%20Mtg%20_06%20Minutes.pdf, http://bond.bvsd.org/projects/Sanchez-International/DATMeetingDocs/201507%20Mtg%20_06%20Minutes.pdf
Dec. 8http://bond.bvsd.org/projects/Sanchez-International/Lists/DAT Meetings List/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Sanchez-International/Lists/DAT Meetings List/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Dec. 8http://bond.bvsd.org/projects/Sanchez-International/DATMeetingDocs/2015-1208-SanchezDAT5-Minutes.pdf, http://bond.bvsd.org/projects/Sanchez-International/DATMeetingDocs/201507%20Mtg%20_05%20Minutes.pdf
Oct. 19http://bond.bvsd.org/projects/Sanchez-International/Lists/DAT Meetings List/DispForm.aspx?ID=4http://bond.bvsd.org/projects/Sanchez-International/Lists/DAT Meetings List/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}Oct. 19http://bond.bvsd.org/projects/Sanchez-International/DATMeetingDocs/2015-1019-SanchezDAT4Minutes.pdf, http://bond.bvsd.org/projects/Sanchez-International/DATMeetingDocs/2015-1019-SanchezDAT4Minutes.pdf
Sept. 9http://bond.bvsd.org/projects/Sanchez-International/Lists/DAT Meetings List/DispForm.aspx?ID=3http://bond.bvsd.org/projects/Sanchez-International/Lists/DAT Meetings List/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Sept. 9http://bond.bvsd.org/projects/Sanchez-International/DATMeetingDocs/2015-0909-SanchezDAT3Minutes.pdf, http://bond.bvsd.org/projects/Sanchez-International/DATMeetingDocs/2015-0909-SanchezDAT3Minutes.pdf
June 12http://bond.bvsd.org/projects/Sanchez-International/Lists/DAT Meetings List/DispForm.aspx?ID=2http://bond.bvsd.org/projects/Sanchez-International/Lists/DAT Meetings List/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}June 12http://bond.bvsd.org/projects/Sanchez-International/DATMeetingDocs/2015-0612-SanchezDAT2Minutes.pdf, http://bond.bvsd.org/projects/Sanchez-International/DATMeetingDocs/2015-0612-SanchezDAT2Minutes.pdf
May 27http://bond.bvsd.org/projects/Sanchez-International/Lists/DAT Meetings List/DispForm.aspx?ID=1http://bond.bvsd.org/projects/Sanchez-International/Lists/DAT Meetings List/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}May 27http://bond.bvsd.org/projects/Sanchez-International/DATMeetingDocs/2015-0527-SanchezDAT1Minutes.pdf, http://bond.bvsd.org/projects/Sanchez-International/DATMeetingDocs/2015-0527-SanchezDAT1Minutes.pdf

Timeline

 

 

​​Construction is complete.  ​

Images

expand + Yr/Month : July 2016 ‎(4)
expand + Yr/Month : May 2016 ‎(1)

Scope of Work

​Facility Condition

  • Exterior building improvements such as repair/replace windows and doors, replace fascia and repair masonry
  • Repair/replace interior doors
  • Improvements to interior finishes such as flooring, ceiling tile, paint and casework
  • Restroom renovations
  • HVAC system improvements
  • Install building-wide air conditioning
  • Electrical system upgrades including emergency generator
  • Communications and clock system improvements
  • Repair/replace fixtures such as curtains and casework
  • Site improvements such as paving, landscaping and irrigation
  • Audio enhancement in every classroom**

Program Compatibility Assessment

  • Provide adequate space for full-day kindergarten
  • Provide adequate space for preschool​
  • Provide receiving/recycling area

Health and Physical Development

  • Upgrade playground equipment and surface material

Safety and Security

  • Install electronic security controls
  • Install camera/intercom security system
  • Install security partitions

Sustainability​

  • Conduct retro-commissioning and repairs
  • Upgrade HVAC controls
  • Upgrade lighting
  • Replace aged boiler with efficient condensing type

Innovation​

Sanchez Elementary School is eligible to receive up to $200,000 in additional funds to implement facility improvements that support innovative teaching methods. ​

** Not included in project budget​​