Emerald Elementary Schoolhttp://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=9http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}Emerald Elementary School755 West Elmhurst Place Broomfield, CO 80020http://schools.bvsd.org/p12/emerald720.561.8500Phase 11958<img alt="" src="/projects/Project%20Profile%20Images/EmeraldES-photo-300x300.JPG" style="BORDER:0px solid;" />$22,309,504N/A

Latest Updates

 

 

Spring Break Asbestos Work - Letter to Families [SPANISH]http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=20http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=20{28e838a4-8015-4177-ac17-2576b5d1e514}Spring Break Asbestos Work - Letter to Families [SPANISH]https://docs.google.com/document/d/1JGkpvTiz-35W04BtSMVKevQ5lz9cMDYpg6I_isBvs58/edit?usp=sharing, https://docs.google.com/document/d/1JGkpvTiz-35W04BtSMVKevQ5lz9cMDYpg6I_isBvs58/edit?usp=sharing
Spring Break Asbestos Work - Letter to Familieshttp://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=21http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=21{28e838a4-8015-4177-ac17-2576b5d1e514}Spring Break Asbestos Work - Letter to Familieshttps://docs.google.com/document/d/1k0I4ZaQq0tCz2iurI7bKBw-DihdmoD_iwFCmCcq-pZg/edit?usp=sharing, https://docs.google.com/document/d/1k0I4ZaQq0tCz2iurI7bKBw-DihdmoD_iwFCmCcq-pZg/edit?usp=sharing
March 2017http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=22http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=22{28e838a4-8015-4177-ac17-2576b5d1e514}March 2017Swinerton Builders are busily working to complete the brick veneer on the exterior envelope of the building. The roof will be complete in the next few weeks. On the interior of the building, crews are working to rough-in electrical and plumbing and mechanical controls. In the coming weeks, drywall and ceiling grid will be installed in Area A (west side - kitchen, cafeteria, music and art). Windows will be installed in Area B (middle - learning communities Gr.1-5). In Area C (east side - PK, Kindergarten and administration offices), crews will focus on completing the interior framing. We have been working with Fielding Nair International (FNI) and Boulder Commercial Interiors (BCI) to complete the new furniture design. Over the past month, some teachers have taken tours of the construction site for a sneak peek at the new building. Construction is on schedule to be ready for students in August!


Take a tour of the new school

 


​ Check out the full presenTation of the design of the new school ​​


 

 

Noticias sobre la construcción en Emerald para el regreso a la escuelahttp://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=11http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}Noticias sobre la construcción en Emerald para el regreso a la escuela¡Los equipos de construcción están haciendo grandes progresos en la nueva escuela! Será emocionante y educativo ver cómo se materializa la nueva escuela durante el ciclo escolar. Esperamos ofrecer algunas actividades educativas y visitas a los estudiantes durante el transcurso del proyecto. A lo largo del año, publicaremos noticias sobre lo que está ocurriendo con la construcción y detalles específicos que ustedes necesiten saber acerca de los cambios en la rutina regular.http://bond.bvsd.org/projects/Emerald/Documents/SPANISHVersionofEmeraldConstructionUpdateBacktoSchool.pdf, http://bond.bvsd.org/projects/Emerald/Documents/SPANISHVersionofEmeraldConstructionUpdateBacktoSchool.pdf
February 2017http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=19http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}February 2017Through the cold month of January, construction crews have been busy installing exterior insulation and brick veneer on Area A (west side - music, art and cafeteria) and Area B (middle - academic area). They have also completed the roofing in Area A and are moving to Area B. In the interior, metal framing for walls is going up and electrical and plumbing rough-ins are on-going. In the coming weeks, Swinerton is scheduled to complete the exterior insulation and brick veneer installation in Area B and C (east side - PK-1 area and administration). They will also be completing the roofing in Area A, B and C of the building. The interior portion of Area A and B will see continued wall framing, electrical and plumbing rough-ins completed and the start of drywall installation towards the end of February.
September Updatehttp://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=1http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}September UpdateOn August 31 and September 1, members of the Emerald Elementary School community including teachers, parents, students and community members, engaged in a Discovery Visit with educators and architects from Fielding Nair International to develop a vision for the new school. Through interviews and workshops, the design team got to know the school, learned what makes Emerald Elementary unique and began to imagine what the new school will be. Check out the Discovery Report.http://bond.bvsd.org/projects/Emerald/DATMeetingDocs/Emerald%20Discovery%20Report%20-%20Sept2015.pdf, http://bond.bvsd.org/projects/Emerald/DATMeetingDocs/Emerald%20Discovery%20Report%20-%20Sept2015.pdf
Back to School Construction Updatehttp://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=10http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}Back to School Construction UpdateConstruction crews are making great progress on the new school! It will be exciting and educational to watch the new school materialize over the next year. We are hoping to offer some educational activities and tours for students over the course of the project. Throughout the year, we will provide regular updates about what is happening with construction and specific details you need to know about changes to the regular routine. Follow the link for important information you need to know. http://bond.bvsd.org/projects/Emerald/Documents/Emerald%20Construction%20Update%20Back%20to%20School.pdf, http://bond.bvsd.org/projects/Emerald/Documents/Emerald%20Construction%20Update%20Back%20to%20School.pdf
Construction Update | September 2016http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=12http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update | September 2016Swinerton Builders are moving forward with the school construction. They continue to work on below grade plumbing and electrical work installation with planned completion by late October. They have completed all caisson pours and foundation work with final inspections to follow. The week of Sept. 12, Swinerton will begin to pour the concrete slab on the west 1/3 (Area A) of the new building. Contractors are starting to build scaffolding for the placement of the concrete block wall (CMU). Follow the "Images" link to see construction photos.
Construction Update | October 2016http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=13http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update | October 2016Construction on the new building continues to move along at a steady pace. During October, Swinerton Builders completed all underground plumbing and electrical work and poured the final slab on grade concrete. They started installing exterior insulation and brick masonry on the outside walls. In November, they will continue to install concrete blocks walls (CMU), and will begin erecting steel and installing exterior door framing. Click the images link below for project photos. http://bond.bvsd.org/projects/Emerald/Pages/default.aspx#images, http://bond.bvsd.org/projects/Emerald/Pages/default.aspx#images
Community Visioning Workshop - August 31 & September 1http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=2http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Community Visioning Workshop - August 31 & September 1The construction of the new Emerald Elementary School building provides the opportunity to rethink how we build schools to support student success in the 21st Century. BVSD has developed Innovation Guidelines to guide instructional practice and design of learning environments. At the Community Visioning Workshop on August 31, the design team shared some of these ideas with the community and gathered their hopes and wishes for the new school. You can see the presentation from the meeting on the Discovery Visit Dashboard​.http://designemerald.splashthat.com/, http://designemerald.splashthat.com/
January 2016 Updatehttp://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=3http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}January 2016 UpdateThe design team is working on schematic design.
March 2016 Updatehttp://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=4http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}March 2016 UpdateThe design team is working on design development drawings. Construction is planned to start in June.
June 2016 Updatehttp://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}June 2016 UpdateConstruction is underway! The contractor has mobilized to the site and is starting earthwork.
Construction Kick-off Letter to Parentshttp://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=6http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Letter to Parentshttp://bond.bvsd.org/projects/Emerald/Documents/Emerald%20construction%20start%20letter%20to%20parents.pdf, http://bond.bvsd.org/projects/Emerald/Documents/Emerald%20construction%20start%20letter%20to%20parents.pdf
Construction Kick-off Letter to Parents - Spanishhttp://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=7http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Letter to Parents - Spanishhttp://bond.bvsd.org/projects/Emerald/Documents/Emerald%20construction%20start%20letter%20to%20parents_SPANISH.pdf, http://bond.bvsd.org/projects/Emerald/Documents/Emerald%20construction%20start%20letter%20to%20parents_SPANISH.pdf
Construction Update | July 2016http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=8http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update | July 2016Swinerton Builders are making positive progress on the Emerald construction site. The site has been scraped and graded. Work anticipated for early July includes installing caissons and preparing for the solid footings of the building. http://bond.bvsd.org/projects/Emerald/Documents/Emerald%20Construction%20Update%206-28-16.pdf, http://bond.bvsd.org/projects/Emerald/Documents/Emerald%20Construction%20Update%206-28-16.pdf
Construction Notice to Neighborshttp://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=9http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Notice to Neighborshttp://bond.bvsd.org/_layouts/15/loadingcirclests16.gif, http://bond.bvsd.org/_layouts/15/loadingcirclests16.gif
Emerald Construction Update | January 2017http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=18http://bond.bvsd.org/projects/Emerald/Lists/Latest Updates/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}Emerald Construction Update | January 2017The Emerald community celebrated the placement of the final steel beam on the building at a Topping Out Ceremony in December, marking the halfway point of the construction project. Students and staff signed the beam before it was lifted into place, making their permanent mark on the new building. In addition to the final steel placement, Swinerton has been busy installing roof decking on Area A (kitchen,cafeteria, music, art) of the building and will move east as the final concrete walls (CMU) are installed in Area C (preschool, kindergarten, curiosity center and administration). Final roof decking will be complete by the end of January. Also in January, Swinerton will continue to install metal framing, insulation and brick veneer on the exterior portion of the building. Interior work will begin with finishes work, hanging drywall and painting in Area A.

Project Details

Project Team
Project Manager

 

 

Rob Pricehttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=51{28e838a4-8015-4177-ac17-2576b5d1e514}Rob Pricerob.price@bvsd.org720-561-6425

Architect

 

 

Fielding Nair Internationalhttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Fielding Nair Internationalhttp://www.fieldingnair.com, http://www.fieldingnair.com
RB+Bhttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=38{28e838a4-8015-4177-ac17-2576b5d1e514}RB+Bhttp://www.rbbarchitects.com/, http://www.rbbarchitects.com/

Contractor

 

 

Swinerton Buildershttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=37{28e838a4-8015-4177-ac17-2576b5d1e514}Swinerton Buildershttp://www.swinerton.com/, http://www.swinerton.com/

Related Resources

 

 

Educational Facilities Master Planhttp://bond.bvsd.org/projects/Emerald/Lists/Related Resources/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Emerald/Lists/Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttp://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=43, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=43page
Sign up for email updateshttp://bond.bvsd.org/projects/Emerald/Lists/Related Resources/DispForm.aspx?ID=7http://bond.bvsd.org/projects/Emerald/Lists/Related Resources/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}Sign up for email updateshttps://docs.google.com/forms/d/172_Btf27glFnCcusSAYN3qg9GcSmdGe9DaeaA06gQBY/viewform?usp=send_form, https://docs.google.com/forms/d/172_Btf27glFnCcusSAYN3qg9GcSmdGe9DaeaA06gQBY/viewform?usp=send_formexternal

Details
Project Budget

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=9http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}$22,309,504

Innovation Budget

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=9http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}N/A

Bond Expenditures

 

 

Emerald Elementary Schoolhttp://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=9http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}Emerald Elementary Schoolhttp://bond.bvsd.org/financial/Documents/CurrentProgramExpenditures.pdf, Bond Program Expenditures

Project Expenditures

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=9http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}http://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=9http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Energy Efficiency/Green Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=9http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Educational Innovation Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=9http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}Under development

Design Advisory Team

​The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.​

Staff 

Samara Williams – Principal
Sara Goldberg - Principal’s Assistant 
Sharon Troxell – Emerald teacher
Miki Novaria – Emerald teacher
Dawn Ringenbach – Art teacher/Technology
Melissa Tingley – Emerald teacher
Diana Sorbo - Emerald teacher
Lynne Kirby – Emerald specialist
Jack Powers – Emerald head custodian 

Parents

Chad Pfitzer – Parent
Heather Wilson – Parent
Brittani Fernandez - Parent
Kate Gardenghi - Parent
Josh Crutcher, Parent
Sharon Tessier, Parent

Rachel O’Hayre, Parent & BVSD Employee
Andrea Laser, Parent & Emerald Teacher

  
​​Community​
Neil Allaire, Neighbor
Paul Eberhart, Neighbor
Linda Bealer, Neighbor

Wendy Fiedler, Community member 
Jean Paxton, Community member 

Fran Ryan - Impact on Education 
Kevin Standbridge - City of Broomfield 

Related Resources

 

 

Go to Discovery Visit Dashboard - Meeting on Aug. 31 & Sept 1http://bond.bvsd.org/projects/Emerald/Lists/DAT Related Resources/DispForm.aspx?ID=7http://bond.bvsd.org/projects/Emerald/Lists/DAT Related Resources/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}Go to Discovery Visit Dashboard - Meeting on Aug. 31 & Sept 1http://designemerald.splashthat.com/, http://designemerald.splashthat.com/external
View Discovery Visit Reporthttp://bond.bvsd.org/projects/Emerald/Lists/DAT Related Resources/DispForm.aspx?ID=6http://bond.bvsd.org/projects/Emerald/Lists/DAT Related Resources/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}View Discovery Visit Reporthttp://bond.bvsd.org/projects/Emerald/DATMeetingDocs/Emerald%20Discovery%20Report%20-%20Sept2015.pdf, http://bond.bvsd.org/projects/Emerald/DATMeetingDocs/Emerald%20Discovery%20Report%20-%20Sept2015.pdfpage
Design Advisory Team Guidelineshttp://bond.bvsd.org/projects/Emerald/Lists/DAT Related Resources/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Emerald/Lists/DAT Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Design Advisory Team Guidelineshttp://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf, http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdfpage

DAT Meeting Schedule

DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting. ​​ All DAT meetings are held 4-5:30 p.m. DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting.

 

 

March 28, 2016http://bond.bvsd.org/projects/Emerald/Lists/DAT Meetings List/DispForm.aspx?ID=7http://bond.bvsd.org/projects/Emerald/Lists/DAT Meetings List/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}March 28, 2016http://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2016%2003%2028_Emerald%20Elementary%20Meeting%20Minutes_DAT%206.pdf, http://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2016%2003%2028_Emerald%20Elementary%20Meeting%20Minutes_DAT%206.pdfhttp://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2016_03_28%20Emerald%20DAT%206%20Presentation.compressed.web.pdf, http://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2016_03_28%20Emerald%20DAT%206%20Presentation.compressed.web.pdf
Jan. 19, 2016http://bond.bvsd.org/projects/Emerald/Lists/DAT Meetings List/DispForm.aspx?ID=6http://bond.bvsd.org/projects/Emerald/Lists/DAT Meetings List/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}Jan. 19, 2016http://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2016%2001%2019_Emerald%20Elementary%20Meeting%20Minutes_DAT%205%20(2).pdf, http://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2016%2001%2019_Emerald%20Elementary%20Meeting%20Minutes_DAT%205%20(2).pdfhttp://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2016_01_19EmeraldDAT5Prsntweb.pdf, http://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2016_01_19EmeraldDAT5Prsntweb.pdf
NOV. 30, 2015http://bond.bvsd.org/projects/Emerald/Lists/DAT Meetings List/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Emerald/Lists/DAT Meetings List/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}NOV. 30, 2015http://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2015-1130-EmeraldDAT4Minutes.pdf, http://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2015-1130-EmeraldDAT4Minutes.pdfhttp://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2015_11_30EmeraldDAT4Prsntweb.pdf, http://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2015_11_30EmeraldDAT4Prsntweb.pdf
OCT. 12, 2015http://bond.bvsd.org/projects/Emerald/Lists/DAT Meetings List/DispForm.aspx?ID=4http://bond.bvsd.org/projects/Emerald/Lists/DAT Meetings List/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}OCT. 12, 2015http://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2015-1012-EmeraldDAT3Minutes.pdf, http://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2015-1012-EmeraldDAT3Minutes.pdfhttp://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2015-1012-EmeraldDAT3Presentation.pdf, http://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2015-1012-EmeraldDAT3Presentation.pdf
SEPT. 14, 2015http://bond.bvsd.org/projects/Emerald/Lists/DAT Meetings List/DispForm.aspx?ID=3http://bond.bvsd.org/projects/Emerald/Lists/DAT Meetings List/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}SEPT. 14, 2015http://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2015-0914-EmeraldDAT2Minutes.pdf, http://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2015-0914-EmeraldDAT2Minutes.pdfhttp://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2015-0914-EmeraldDAT2Presentation.pdf, http://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2015-0914-EmeraldDAT2Presentation.pdf
AUG. 31, 2015http://bond.bvsd.org/projects/Emerald/Lists/DAT Meetings List/DispForm.aspx?ID=2http://bond.bvsd.org/projects/Emerald/Lists/DAT Meetings List/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}AUG. 31, 2015http://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2015-0831-EmeraldDAT1Minutes.pdf, http://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2015-0831-EmeraldDAT1Minutes.pdfhttp://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2015-0831-EmeraldDAT1Presentation.pdf, http://bond.bvsd.org/projects/Emerald/DATMeetingDocs/2015-0831-EmeraldDAT1Presentation.pdf

Timeline

 

 

Constructionhttp://bond.bvsd.org/projects/Emerald/Lists/Project Timeline/DispForm.aspx?ID=4http://bond.bvsd.org/projects/Emerald/Lists/Project Timeline/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}ConstructionJune 2016 - Aug. 2017In Progressinfo
Design Developmenthttp://bond.bvsd.org/projects/Emerald/Lists/Project Timeline/DispForm.aspx?ID=3http://bond.bvsd.org/projects/Emerald/Lists/Project Timeline/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Design DevelopmentDec. 7 - Feb. 15, 2016Completesuccess
Schematic Designhttp://bond.bvsd.org/projects/Emerald/Lists/Project Timeline/DispForm.aspx?ID=2http://bond.bvsd.org/projects/Emerald/Lists/Project Timeline/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Schematic DesignOct. 13 - Dec. 7Completesuccess
Visioning and Programminghttp://bond.bvsd.org/projects/Emerald/Lists/Project Timeline/DispForm.aspx?ID=1http://bond.bvsd.org/projects/Emerald/Lists/Project Timeline/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}Visioning and ProgrammingAug. 4 - Oct. 13Completesuccess

Images

​Hover over image below and scroll down to see photos. 

expand + Yr/Month : July 2016 ‎(6)
expand + Yr/Month : May 2016 ‎(3)
expand + Yr/Month : September 2016 ‎(5)

Scope of Work

​Project Description

The Emerald Elementary School building will be replaced. When district staff assessed the needs of the building, it was determined that it makes more financial sense to replace the building rather than make significant investments in repairs and maintenance. 

New construction would provide the opportunity to create innovative, 21st Century learning spaces that support modern curriculum delivery in a building that is safe, comfortable and energy efficient. Using BVSD's green building principles as a guide, the school can be built green from the ground up.

The building would be replaced with one of similar size to serve the current enrollment of Emerald. The Emerald community would have the opportunity to participate in the design of the new building through the Design Advisory Team (DAT). The team would include representatives from Emerald staff, parents and neighbors who will work with the architect to develop the design. The construction timeline and plans for housing students during construction would be developed during the design process.