Eldorado K-8 Schoolhttp://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=31http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=31{28e838a4-8015-4177-ac17-2576b5d1e514}Eldorado K-8 School3351 Indiana Street Superior, CO 80027http://schools.bvsd.org/p12/eldorado720.561.4400Phase 22000<img alt="" src="/projects/Project%20Profile%20Images/EldoradoK8-photo-300x300.JPG" style="BORDER:0px solid;" />$10,542,307$600,000 included in budget

Latest Updates

 

 

January 11, 2018http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=51http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=51{28e838a4-8015-4177-ac17-2576b5d1e514}January 11, 2018On the new addition, the first-floor concrete pour is complete and a pour for the second floor will take place next week. Installation of structural steel, exterior framing, first-floor interior framing (later next week) and waterproofing work will begin in this area as well and will continue over the coming weeks. Roof drain sleeves have been installed and Sampson will be completing some minor roof edge/parapet repairs also. Finally, dirt will be “coming and going” into the new area as well with the backfilling of the foundation and the ongoing removal of the stockpile. Inside the school, the bulk of the work is focused on the Early Childhood classrooms. Rough-in for mechanical and plumbing is mostly complete but electrical rough-in work continues currently and has several weeks to go for completion. Punch list items also are being addressed in various areas. We hope that all of the Eldorado community had a fantastic Winter Break and that your students, and you, are excited for the resumption of school…...Go Eagles! Note: The building will be shut down completely (no power) on the weekend of February 17 - 19, Presidents weekend. As such, nobody will be allowed in the building on this weekend.https://docs.google.com/document/d/1h6HNs58RnnJKCgDYee1D60Lk7vjiuyApOl5JSRNW3nQ/edit?usp=sharing, https://docs.google.com/document/d/1h6HNs58RnnJKCgDYee1D60Lk7vjiuyApOl5JSRNW3nQ/edit?usp=sharing
Get Exclusive Updateshttp://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=36http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=36{28e838a4-8015-4177-ac17-2576b5d1e514}Get Exclusive UpdatesFollow Principal Hamasaki for additional updates and exclusive photos on Twitter @hamasaki_r or on Instagram at eldorado_k8_school.
Construction Kick-off Postcard to Neighborshttp://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=18http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Postcard to Neighborshttp://bond.bvsd.org/projects/Eldorado/Documents/Eldorado%20construction%20start%20notification%20postcard%20text%20-%20neighbor%20revised%20web.pdf, http://bond.bvsd.org/projects/Eldorado/Documents/Eldorado%20construction%20start%20notification%20postcard%20text%20-%20neighbor%20revised%20web.pdf
Construction Kick-off Letter to Parentshttp://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=16http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off Letter to Parentshttps://docs.google.com/document/d/1-tnSy7gTBvQLVgBG6gTDwWe0jQ8x8PxXhzQ5Ei7qa74/edit?usp=sharing, https://docs.google.com/document/d/1-tnSy7gTBvQLVgBG6gTDwWe0jQ8x8PxXhzQ5Ei7qa74/edit?usp=sharing

 

 

December 20, 2017http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=49http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=49{28e838a4-8015-4177-ac17-2576b5d1e514}December 20, 2017There is a lot of activity going on here at Eldorado K-8 as the crane is on site and the steel is going up for the new addition! The crane will return again over the break for some roof work (cooling tower removal) but it is exciting to see tangible progress being made in this area. Steel decking for the new addition will begin to be placed next week along with the ongoing removal of the dirt stockpile by the new addition (a very slow process unfortunately). New roof drain inserts will continue to be installed over the coming weeks as well. There is also a lot of work going inside the school over the next two weeks as the contractor takes advantage of an empty building. Carpet and tile is being replaced in the band/choir room and the existing scoreboard in the main gym will be removed/replaced. Door hardware will be replaced throughout the school to improve safety and security. In the Early Childhood area electrical and mechanical rough-in continues and should be wrapping up in the next 3 weeks. Finally, the ongoing punch-list is being addressed on a daily basis and will continue throughout the end of the project. Note I: Construction will not take place on 12/25/17 and 1/1/18 in celebration of the holidays. Note II: The weekly construction update will resume again on 1/3/18. https://docs.google.com/document/d/1h6HNs58RnnJKCgDYee1D60Lk7vjiuyApOl5JSRNW3nQ/edit?usp=sharing, https://docs.google.com/document/d/1h6HNs58RnnJKCgDYee1D60Lk7vjiuyApOl5JSRNW3nQ/edit?usp=sharing
May 17http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=25http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=25{28e838a4-8015-4177-ac17-2576b5d1e514}May 17Construction on the site will commence on May 30. Heavy equipment will be delivered for staging purposes on that day. Excel energy will be on site on May 30 and will be digging trenches in the NW corner of the property for line relocation. It is anticipated that this will take 2 days to prep the site for relocation and power will be shut down on June 1 to enable the new connection. Demolition on the front parking lot will start on Wednesday, May 31. No cars will be allowed to park in the front lot. In terms of work in the building, demolition, prep, and pulling carpet begins immediately on May 31.http://bond.bvsd.org/projects/Eldorado/Documents/Eldorado%20K-8%20Construction%20Update%205-17-17.pdf, http://bond.bvsd.org/projects/Eldorado/Documents/Eldorado%20K-8%20Construction%20Update%205-17-17.pdf
December 13, 2017http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=48http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=48{28e838a4-8015-4177-ac17-2576b5d1e514}December 13, 2017We are starting to see real progress in the new addition here at Eldorado K-8. Steel beams are now reaching out of the ground and the skeleton of the new addition is starting to take shape. The large stockpile of dirt continues to be removed along with prep work for the pouring of stairs/sidewalk at the bike rack area in the front of the school. Roof drain inserts will continue to be installed over the next few weeks with completion slated for early in the holiday break. Inside work continues on schedule as well. Demolition of the chiller will start on Monday and replacement of door hardware will begin later next week as well. Rough-in work on the electrical, mechanical and plumbing systems in the Early Childhood area is ongoing along with the installation of drywall in these new classrooms. Note I. There will be intermittent drilling sounds coming from the ECE area as they work to install hangers for plumbing in the ceiling. The contractor is doing their best to minimize this sound and the impact on classroom instruction. Basic punch list items continue to be addressed on an ongoing basis throughout the school. Note II. Welding will be taking place for several weeks in the new addition. With that knowledge, the contractor has put up a protective barrier to prevent people from looking directly at the light produced by this work. In the interest of safety for their eyes, we ask that students/staff not look directly at these lights while welding is taking place. Hope your holiday “run-up” is going well with you and your family! https://docs.google.com/document/d/1h6HNs58RnnJKCgDYee1D60Lk7vjiuyApOl5JSRNW3nQ/edit?usp=sharing, https://docs.google.com/document/d/1h6HNs58RnnJKCgDYee1D60Lk7vjiuyApOl5JSRNW3nQ/edit?usp=sharing
May 10, 2017http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=24http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=24{28e838a4-8015-4177-ac17-2576b5d1e514}May 10, 2017Construction trailer sits on the NW corner of the playground. Orange safety fence has been built around the trailer. Exterior painting has begun and will continue through the end of the school year. Two external canopies at the front entrance will also be painted the weekend of 5/13 (weather permitting) Parking lot demolition will begin after the school year ends. Project construction continues to be on hold pending the relocation of the underground primary power lines coordinated by Xcel Energy. There is no update on when this will happen.https://docs.google.com/document/d/1IAiGUhtuThB8uniMP4_IQLW3AGw_lD2PeSz11Sis2hQ/edit?usp=sharing, https://docs.google.com/document/d/1IAiGUhtuThB8uniMP4_IQLW3AGw_lD2PeSz11Sis2hQ/edit?usp=sharing
September 27, 2017http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=38http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=38{28e838a4-8015-4177-ac17-2576b5d1e514}September 27, 2017Work continues in earnest at Eldorado K-8, with projects big and small being worked on during the course of the coming week. Smaller items include site work in the bike rack area (concrete install, landscaping), hanging of tackboard in the corridors and completion of various punch-list items (paint touch-ups, etc.). Completion of the car charging station and landscaping in the east parking lot will also be completed. Larger items include ongoing stockpile removal, resurfacing of the tennis courts, framing and electrical rough-in of the classroom spaces in the new Early Childhood space. Work is also continuing on the new addition after a slight delay due to a drainage issue at the foundation. Overall the project is moving along smoothly and we are excited to see areas completed and others evolving on a weekly basis! https://docs.google.com/a/bvsd.org/document/d/1h6HNs58RnnJKCgDYee1D60Lk7vjiuyApOl5JSRNW3nQ/edit?usp=sharing_eil&ts=59cbcabc, https://docs.google.com/a/bvsd.org/document/d/1h6HNs58RnnJKCgDYee1D60Lk7vjiuyApOl5JSRNW3nQ/edit?usp=sharing_eil&ts=59cbcabc
June 2016 Updatehttp://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=10http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}June 2016 UpdateThe project design team is working with the design advisory team to develop the schematic design. See minutes from meetings in the DAT section below.
Project Kick-off Letter to Familieshttp://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=11http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}Project Kick-off Letter to Familieshttp://bond.bvsd.org/projects/Eldorado/Documents/Eldorado%20Parent%20Kick%20Off%20Letter2.pdf, http://bond.bvsd.org/projects/Eldorado/Documents/Eldorado%20Parent%20Kick%20Off%20Letter2.pdf
Project Kick-off Postcard to Neighborshttp://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=12http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}Project Kick-off Postcard to Neighborshttp://bond.bvsd.org/projects/Eldorado/Documents/Eldorado%20DAT%20Neighbor%20Notification%20Postcard%20web.pdf, http://bond.bvsd.org/projects/Eldorado/Documents/Eldorado%20DAT%20Neighbor%20Notification%20Postcard%20web.pdf
October 2016 Updatehttp://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=13http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}October 2016 UpdateSampson Construction has been selected as the contractor for the project. The project team is working with the Design Advisory Team (DAT) on Design Development. See meeting minutes in the DAT section below.
This project is scheduled to begin in Phase 2. http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=8http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}This project is scheduled to begin in Phase 2.
There are no previous updates.http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=9http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}There are no previous updates.
June 21, 2017http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=28http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=28{28e838a4-8015-4177-ac17-2576b5d1e514}June 21, 2017Power lines have been relocated by Excel so work can now commence on the new north wing addition. Demolition of the north basketball court will commence this week in preparation for excavation and the build of the new wing. Demolition continues on the interior of the building with removal of carpet, walls, and other appropriate items. Drywall patch, repair, and painting of interior walls has begun in the middle level wing and will continue throughout this week. Excavation continues in the East parking lot in preparation for the new design and laying of asphalt. West parking lot excavation will begin at the end of this week. Pre-construction meeting for roof repairs will happen on June 21. Roof repairs will commence next week. Eldorado K-8 continues to support BVSD’s recycling efforts to promote sustainability. Our district goal is to divert 75% of the construction materials from going to the landfill. Materials such as wood, glass, electronics, concrete, and metal continue to be recycled as part of the Bond project. https://docs.google.com/a/bvsd.org/document/d/16uOGpsCmVuBthqUYLAFICxApo99lKrLwpRaweTTr93E/edit?usp=sharing, https://docs.google.com/a/bvsd.org/document/d/16uOGpsCmVuBthqUYLAFICxApo99lKrLwpRaweTTr93E/edit?usp=sharing
Project Update | February 2017http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=19http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}Project Update | February 2017The project team is finalizing construction documents. Construction is scheduled to begin in March. Check back for construction updates and photos.
July 19http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=31http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=31{28e838a4-8015-4177-ac17-2576b5d1e514}July 19Demolition continues on the interior of the building with the focus on the renovation of the library heart space. Painting of the elective wings (including the music and art rooms) and the hallways continue. Roof repairs continue this week. New fire alarm system has been installed throughout the building. Carpet laying in the hallways is being finished up this week. New lighting, solar tubes, and new windows for the interior (adjacent to the hallway) middle level classrooms are being installed to provide more natural lighting. The laying of asphalt for both the West and East parking lot commenced. Striping of the parking lot is expected to occur at the end of this week. The work on the new wing has begun with the initial hole dig on the west side of the building where the original basketball court was located. https://docs.google.com/a/bvsd.org/document/d/1yAuDGLR1XP6SdRdzByeIs94Tk9RZ2MNVMYcY73nAsPM/edit?usp=sharing_eil&ts=5970ebcf, https://docs.google.com/a/bvsd.org/document/d/1yAuDGLR1XP6SdRdzByeIs94Tk9RZ2MNVMYcY73nAsPM/edit?usp=sharing_eil&ts=5970ebcf
January 3, 2018http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=50http://bond.bvsd.org/projects/Eldorado/Lists/Latest Updates/DispForm.aspx?ID=50{28e838a4-8015-4177-ac17-2576b5d1e514}January 3, 2018There has been a lot of work taking place while the school is empty and you will certainly notice some changes to specific areas when students return on January 9th. The new addition has seen a lot of steel put in place and and a major concrete pour will be taking place early next week (first floor being put in place). Hence, expect a lot of activity in the fenced off construction area for this part of the project. There was a delay in completing the site work around the new bike/scooter rack area but hopefully completion of this work will resume again in the coming days. The large dirt pile is slowly being removed over the coming weeks along with the ongoing installation of replacement roof drains. https://docs.google.com/document/d/1h6HNs58RnnJKCgDYee1D60Lk7vjiuyApOl5JSRNW3nQ/edit?usp=sharing, https://docs.google.com/document/d/1h6HNs58RnnJKCgDYee1D60Lk7vjiuyApOl5JSRNW3nQ/edit?usp=sharing

Project Details

Project Team
Project Manager

 

 

Mark Schlindweinhttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}Mark Schlindweinmark.schlindwein@bvsd.org720-561-5953mailto:mark.schlindwein@bvsd.org, mailto:mark.schlindwein@bvsd.org

Architect

 

 

MOA Architecturehttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=43{28e838a4-8015-4177-ac17-2576b5d1e514}MOA Architecture303-308-1190http://www.moaarch.com, http://www.moaarch.com

Contractor

 

 

Sampson http://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=34{28e838a4-8015-4177-ac17-2576b5d1e514}Sampson http://www.sampson-construction.com/, http://www.sampson-construction.com/

Related Resources

 

 

Educational Facilities Master Planhttp://bond.bvsd.org/projects/Eldorado/Lists/Related Resources/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Eldorado/Lists/Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttp://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=42, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=42page

Details
Project Budget

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=31http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=31{28e838a4-8015-4177-ac17-2576b5d1e514}$10,542,307

Innovation Budget

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=31http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=31{28e838a4-8015-4177-ac17-2576b5d1e514}$600,000 included in budget

Bond Expenditures

 

 

Eldorado K-8 Schoolhttp://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=31http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=31{28e838a4-8015-4177-ac17-2576b5d1e514}Eldorado K-8 Schoolhttp://bond.bvsd.org/financial/Documents/CurrentProgramExpenditures.pdf, Bond Program Expenditures

Project Expenditures

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=31http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=31{28e838a4-8015-4177-ac17-2576b5d1e514}http://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=31http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=31{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Energy Efficiency/Green Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=31http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=31{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Educational Innovation Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=31http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=31{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClass7DAC2271C1244C4E9D58356D85ED930E"><div><div>Eldorado K-8 will invest its Innovation Funds to the middle-level computer lab into a flexible learning space. In addition, the original elementary computer lab space will also be redesigned to create a “core learning space” for all students across our K-8 that will invite large group presentations, small group work teams and a warm “heart center” in the midst of the library space. </div><div><br></div><div><strong class="ms-rteThemeForeColor-5-0"><a href="/educational-innovation/Pages/Eldorado-K-8-School.aspx">Learn more</a></strong><br><br><br></div></div></div>

Design Advisory Team

​The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.​ The design advisory team will be created when the project begins. 

Staff 

Cathy Queen -- Registrar
Gregg Cruger – 7th Grade Science Teacher
Jennifer Korb – Assistant Principal
Karen Fox – 4th Grade Teacher
Kelly Saalwachter – 6th Grade Science Teacher
​Megan McDonald – Counselor
Nick Vanderpol – Assistant Principal
Robyn Hamasaki - Principal


Parents

Lisa Byther – Parent
Lori Ogbuji – Parent
Matt Finnigan – Parent
Ross Maxwell – Parent

  
​​Community​
Related Resources

 

 

Design Advisory Team Guidelineshttp://bond.bvsd.org/projects/Eldorado/Lists/DAT Related Resources/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Eldorado/Lists/DAT Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Design Advisory Team Guidelineshttp://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf, http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdfpage

DAT Meeting Schedule

DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting. ​​
​​

 

 

April 14, 2016http://bond.bvsd.org/projects/Eldorado/Lists/DAT Meetings List/DispForm.aspx?ID=1http://bond.bvsd.org/projects/Eldorado/Lists/DAT Meetings List/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}April 14, 2016http://bond.bvsd.org/projects/Eldorado/DATMeetingDocs/16107%2000%20%20Meeting%20Minutes%20DAT%201.pdf, http://bond.bvsd.org/projects/Eldorado/DATMeetingDocs/16107%2000%20%20Meeting%20Minutes%20DAT%201.pdf
April 28, 2016http://bond.bvsd.org/projects/Eldorado/Lists/DAT Meetings List/DispForm.aspx?ID=2http://bond.bvsd.org/projects/Eldorado/Lists/DAT Meetings List/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}April 28, 2016http://bond.bvsd.org/projects/Eldorado/DATMeetingDocs/16107%2000%20%20Meeting%20Minutes%20DAT%202.pdf, http://bond.bvsd.org/projects/Eldorado/DATMeetingDocs/16107%2000%20%20Meeting%20Minutes%20DAT%202.pdf
May 11, 2016http://bond.bvsd.org/projects/Eldorado/Lists/DAT Meetings List/DispForm.aspx?ID=3http://bond.bvsd.org/projects/Eldorado/Lists/DAT Meetings List/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}May 11, 2016http://bond.bvsd.org/projects/Eldorado/DATMeetingDocs/16107%2000%20%20Meeting%20Minutes%20DAT%203%202016-05-11%20(2).pdf, http://bond.bvsd.org/projects/Eldorado/DATMeetingDocs/16107%2000%20%20Meeting%20Minutes%20DAT%203%202016-05-11%20(2).pdf
May 31, 2016http://bond.bvsd.org/projects/Eldorado/Lists/DAT Meetings List/DispForm.aspx?ID=6http://bond.bvsd.org/projects/Eldorado/Lists/DAT Meetings List/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}May 31, 2016http://bond.bvsd.org/projects/Eldorado/DATMeetingDocs/16107%2000%20%20Meeting%20Minutes%20DAT%204-05-31-2016.pdf, http://bond.bvsd.org/projects/Eldorado/DATMeetingDocs/16107%2000%20%20Meeting%20Minutes%20DAT%204-05-31-2016.pdf
August 3, 2016http://bond.bvsd.org/projects/Eldorado/Lists/DAT Meetings List/DispForm.aspx?ID=7http://bond.bvsd.org/projects/Eldorado/Lists/DAT Meetings List/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}August 3, 2016http://bond.bvsd.org/projects/Eldorado/DATMeetingDocs/16107.00%20%20Meeting%20Minutes%20DAT%205%202016-08-03.pdf, http://bond.bvsd.org/projects/Eldorado/DATMeetingDocs/16107.00%20%20Meeting%20Minutes%20DAT%205%202016-08-03.pdf
December 13, 2016http://bond.bvsd.org/projects/Eldorado/Lists/DAT Meetings List/DispForm.aspx?ID=8http://bond.bvsd.org/projects/Eldorado/Lists/DAT Meetings List/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}December 13, 2016http://bond.bvsd.org/projects/Eldorado/DATMeetingDocs/16107.00%20%20Meeting%20Minutes%20DAT%2012.13.16.pdf, http://bond.bvsd.org/projects/Eldorado/DATMeetingDocs/16107.00%20%20Meeting%20Minutes%20DAT%2012.13.16.pdf

Timeline

 

 

Schematic Designhttp://bond.bvsd.org/projects/Eldorado/Lists/Project Timeline/DispForm.aspx?ID=1http://bond.bvsd.org/projects/Eldorado/Lists/Project Timeline/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}Schematic DesignJune 2016Completesuccess
Design Developmenthttp://bond.bvsd.org/projects/Eldorado/Lists/Project Timeline/DispForm.aspx?ID=2http://bond.bvsd.org/projects/Eldorado/Lists/Project Timeline/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Design DevelopmentSeptember 2016Completesuccess
Construction Documentshttp://bond.bvsd.org/projects/Eldorado/Lists/Project Timeline/DispForm.aspx?ID=3http://bond.bvsd.org/projects/Eldorado/Lists/Project Timeline/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Construction DocumentsDecember 2016Completesuccess
Constructionhttp://bond.bvsd.org/projects/Eldorado/Lists/Project Timeline/DispForm.aspx?ID=4http://bond.bvsd.org/projects/Eldorado/Lists/Project Timeline/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}ConstructionJanuary 2017-April 2018In Progressinfo

Images

    There are no items to show in this view of the "Construction Images" list.

    Scope of Work

    Facility Condition

    • Roof repairs
    • Repair/replace/upgrade interior doors
    • Site improvements such as paving, fencing, concrete work and irrigation
    • Improvements to interior finishes such as carpet, ceiling, and paint
    • Replace clock system
    • Improve drop-off lanes
    • Audio enhancement in every classroom

    Program Compatibility Assessment

    • Provide adequate space for full-day kindergarten
    • Provide adequate space for preschool
    • Replace portables with permanent classrooms
    • Provide adequate kitchen/cafeteria support space

    Health and Physical Development

    • Repair outdoor play surface material
    • Provide running path
    • Resurface tennis courts

    Safety and Security

    • Redesign main entry to provide more control over visitor access
    • Install electronic security controls
    • Install camera/intercom security system

    Sustainability

    • Upgrade HVAC controls
    • Upgrade lighting
    • Conduct retro-commissioning and repairs

    Innovation

    Eldorado K-8 School is eligible to receive up to $600,000 in additional funds to implement facility improvements that support innovative teaching methods.