Creekside Elementary Schoolhttp://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Creekside Elementary School3740 Martin Drive Boulder, CO 80305http://schools.bvsd.org/p12/creekside720.561.3800Phase 11956<img alt="" src="/projects/Project%20Profile%20Images/CreeksideES-photo-300x300.JPG" style="BORDER:0px solid;" />$22,189,123N/A

Latest Updates

 

 

Creekside Construction Update | January 2017http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=25http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=25{28e838a4-8015-4177-ac17-2576b5d1e514}Creekside Construction Update | January 2017Crews made great progress in December installing exterior masonry around the entire building and completing the roof construction. The mechanical, electrical & plumbing systems have filled up the space that will be hidden by ceilings. Window framing is underway but plastic will stay in place until it’s time to install glass. In the two-story wing on the south side of the school, drywall is being installed and so now, solid walls define the size and shape of the learning spaces. In the Early Childhood Learning Community, metal wall studs and door frames are being installed. Rough-in of the electrical system will follow. In the coming weeks, the exterior masonry will be completed and the exterior metal panels will be delivered. Expect to see all of the exterior finishes completed over the next few months.
New Creekside building goes big on energy efficiencyhttp://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=24http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=24{28e838a4-8015-4177-ac17-2576b5d1e514}New Creekside building goes big on energy efficiencyAt Creekside, the project team’s hard work to maximize the energy efficiency of the new building is predicted to reduce energy use by nearly 70 percent! This energy savings will translate to an approximate annual utility cost savings of $30,377, a reduction of 50 percent of the current expenditure. Creekside's solar panels will be reinstalled on the building post construction and will provide most of the building's energy.https://sway.com/ylmZgnavFtQJXAb4, https://sway.com/ylmZgnavFtQJXAb4
Read more about BVSD's energy efficiency improvements in the Daily Camerahttp://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=23http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}Read more about BVSD's energy efficiency improvements in the Daily Camerahttp://www.dailycamera.com/boulder-county-schools/ci_30615910/boulder-valley-predicts-170k-annual-energy-savings-from, http://www.dailycamera.com/boulder-county-schools/ci_30615910/boulder-valley-predicts-170k-annual-energy-savings-from

 

 

Noticias sobre la construcción en Creekside para el regreso a la escuelahttp://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=18http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=18{28e838a4-8015-4177-ac17-2576b5d1e514}Noticias sobre la construcción en Creekside para el regreso a la escuela¡Los equipos de construcción están haciendo grandes progresos en la nueva escuela! Será emocionante y educativo ver cómo se materializa la nueva escuela durante el ciclo escolar. Esperamos ofrecer algunas actividades educativas y visitas a los estudiantes durante el transcurso del proyecto. A lo largo del año, publicaremos noticias sobre lo que está ocurriendo con la construcción y detalles específicos que ustedes necesiten saber acerca de los cambios en la rutina regular.http://bond.bvsd.org/projects/Creekside/Documents/SPANISHVersionofCreeksideConstructionUpdateBacktoSchool.pdf, http://bond.bvsd.org/projects/Creekside/Documents/SPANISHVersionofCreeksideConstructionUpdateBacktoSchool.pdf
January 2016 Updatehttp://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=10http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}January 2016 UpdateSchematic design is complete. The design team is working on design development.
March 2016 Updatehttp://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=12http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}March 2016 UpdateThe project team is working on construction drawings.
April 2016 Updatehttp://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=13http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}April 2016 UpdatePreliminary construction work will begin this month, and the project is on schedule to open the new building August 2017. To make room for the new school, part of the southwest wing of the existing building will be demolished. Before demolition can occur, asbestos containing materials need to be removed from this area of the building. This work will begin later this month and will be conducted according to BVSD, state and Federal regulations. After abatement is complete in May, the construction contractor will mobilize to the site. Until the end of the school year, construction activity will be limited to the southwest corner of the school and the exterior area immediately adjacent to it. Over the summer, the construction area will expand to include the entire southern part of the site and will include onsite parking for workers.
May 2016 Updatehttp://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=14http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}May 2016 UpdateAsbestos abatement is completed. Until the end of the school year, construction activity will be limited to the southwest corner of the school and the exterior area immediately adjacent to it. Over the summer, the construction area will expand to include the entire southern part of the site. ​
June 2016 Updatehttp://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=15http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=15{28e838a4-8015-4177-ac17-2576b5d1e514}June 2016 UpdateAbatement, earthwork and demolition of the six classrooms is complete. Upcoming work includes pouring concrete foundation footers and staging for underground utilities. See project photos below.
Construction Update July 2016http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=16http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=16{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update July 2016GE Johnson contractors are making great progress on the building site. A portion of the foundation has been poured with concrete, and other portions are being compacted and graded for future foundation work (follow link for photos). http://bond.bvsd.org/projects/Creekside/Documents/Creekside%20Construction%20Update%206-30-16.pdf, http://bond.bvsd.org/projects/Creekside/Documents/Creekside%20Construction%20Update%206-30-16.pdf
Creekside Back to School Construction Updatehttp://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=17http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}Creekside Back to School Construction UpdateConstruction crews are making great progress on the new school! It will be exciting and educational to watch the new school materialize over the next year. We are hoping to create some construction related lessons and possibly tours of the construction site for students. Throughout the year, we will provide regular updates about what is happening with construction and specific details you need to know about changes to our regular routine. Follow the link for more information. http://bond.bvsd.org/projects/Creekside/Documents/Creekside%20Construction%20Update%20Back%20to%20School.pdf, http://bond.bvsd.org/projects/Creekside/Documents/Creekside%20Construction%20Update%20Back%20to%20School.pdf
Construction Update | September 2016http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=19http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update | September 2016The building is starting to come out of the ground! The building foundation has been set and concrete block walls and steel are going up. Check out construction photos below.
Construction Update | October 2016http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=20http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=20{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update | October 2016Construction crews met a significant milestone in October—placing the last beam on the steel structure of the new building. The project team commemorated the event with a “Topping Out” ceremony. Students and staff were invited to sign their names on the final beam and then watched and cheered as the beam was lowered into place. Workers are now installing roof decking along with exterior and interior wall framing. In store for November is completion of the underground plumbing and electrical work as well as the final slab on grade concrete pour. Crews will then begin installing brick masonry on the exterior of the building with the goal of getting it fully enclosed for the winter months. Follow the Images link below for photos of the ceremony and construction. http://bond.bvsd.org/projects/Creekside/Pages/default.aspx#images, http://bond.bvsd.org/projects/Creekside/Pages/default.aspx#images
September Updatehttp://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=8http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}September UpdateOn September 8 & 9, members of the Creekside Elementary School community including teachers, parents, students and community members, engaged in a Discovery Visit with educators and architects from Fielding Nair International to develop a vision for the new school. Through interviews and workshops, the design team got to know the school, learned what makes Creekside Elementary unique and began to imagine what the new school will be. The construction of the new Creekside Elementary School building provides the opportunity to rethink how we build schools to support student success in the 21st Century. BVSD has developed Innovation Guidelines to guide instructional practice and design of learning environments. At the Community Visioning Workshop​ on September 9, the design team shared some of these ideas with the community and gathered their hopes and wishes for the new school. You can see the presentation from the meeting on the Discovery Visit Dashboard linked below​.https://docs.google.com/presentation/d/1C6Azs-c2iE743Yoy-JpliQLcqq_MT_tYkOO3_b4M164/edit?usp=sharing, Creekside Discovery Report
October Updatehttp://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=9http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}October UpdateThe design team is working with the DAT to develop a schematic design. http://www.bvsd.org/CapitalImprovements/Documents/DAT%20Guidelines%20%20Revised%202015.pdf#page=6, Learn more about schematic design
Construction Update | December 2016http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=21http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=21{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update | December 2016Crews made significant strides in November toward getting the building enclosed before Winter Break. Most of the south wing has been enclosed with sheet insulation. They have completed a majority of the exterior structural framing and are currently insulating the outside of the building and adding brick veneer. The roofing is moving along quickly with the second story and gym location completed, the remainder should be complete in the coming weeks. Contractors will soon have completed the interior framing on the first level of the building and the interior drywall and taping will follow. The contractors are on schedule for summer 2017 completion. Scroll to the Images section of this page for construction photos. http://bond.bvsd.org/projects/Creekside/Pages/default.aspx#images, http://bond.bvsd.org/projects/Creekside/Pages/default.aspx#images
New Creekside building goes big on energy efficiencyhttp://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=22http://bond.bvsd.org/projects/Creekside/Lists/Latest Updates/DispForm.aspx?ID=22{28e838a4-8015-4177-ac17-2576b5d1e514}New Creekside building goes big on energy efficiencyAt Creekside, the project team’s hard work to maximize the energy efficiency of the new building is predicted to reduce energy use by nearly 70 percent! This energy savings will translate to an approximate annual utility cost savings of $30,377, a reduction of 50 percent of the current expenditure. Creekside's solar panels will be reinstalled on the building post construction and will provide most of the building's energy. https://sway.com/ylmZgnavFtQJXAb4, https://sway.com/ylmZgnavFtQJXAb4

Project Details

Project Team
Project Manager

 

 

Doug Hagenhttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}Doug Hagendoug.hagen@bvsd.org720-561-5952mailto:doug.hagen@bvsd.org, mailto:doug.hagen@bvsd.org

Architect

 

 

Bennett Wagner & Grody Architectshttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}Bennett Wagner & Grody Architectshttp://www.bwgarchitects.com/, http://www.bwgarchitects.com/
Fielding Nair Internationalhttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Fielding Nair Internationalhttp://www.fieldingnair.com, http://www.fieldingnair.com

Contractor

 

 

GE Johnsonhttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}GE Johnsonhttps://gejohnson.com/, https://gejohnson.com/

Related Resources

 

 

Educational Facilities Master Planhttp://bond.bvsd.org/projects/Creekside/Lists/Related Resources/DispForm.aspx?ID=4http://bond.bvsd.org/projects/Creekside/Lists/Related Resources/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttp://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=38, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=38page
Sign up to receive email updateshttp://bond.bvsd.org/projects/Creekside/Lists/Related Resources/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Creekside/Lists/Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Sign up to receive email updateshttps://docs.google.com/forms/d/1G-DuNpWbwh5LcBSwz7QHeRcJ4R7t8FCgq7qP9cNR890/viewform?usp=send_form, https://docs.google.com/forms/d/1G-DuNpWbwh5LcBSwz7QHeRcJ4R7t8FCgq7qP9cNR890/viewform?usp=send_formexternal
Share your thoughts about the new Creekside Elementary School buildinghttp://bond.bvsd.org/projects/Creekside/Lists/Related Resources/DispForm.aspx?ID=6http://bond.bvsd.org/projects/Creekside/Lists/Related Resources/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}Share your thoughts about the new Creekside Elementary School buildinghttps://docs.google.com/a/bvsd.org/forms/d/1_phV77gay15Ox4gCHpLUB0f8fBls6XaFu5oECX6EST8/viewform?usp=send_form, https://docs.google.com/a/bvsd.org/forms/d/1_phV77gay15Ox4gCHpLUB0f8fBls6XaFu5oECX6EST8/viewform?usp=send_formexternal

Details
Project Budget

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}$22,189,123

Innovation Budget

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}N/A

Bond Expenditures

 

 

http://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Project Expenditures

 

 

http://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Energy Efficiency/Green Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Educational Innovation Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}<div>Under development</div>

Design Advisory Team

​The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.​​

Staff 

Francine Eufemia, Principal
Michele Leffler, Assistant to Principal
David Jackson, Custodian
Katie Webb, 2nd Grade
Kristen Lewis, Music
Ann Marie Jennings, Special Ed
Kristy Kowalczyk, 4th Grade
Jeanette Peters, Art​

Parents

Alissa Sims
Karen Gall-Urbanowski
Adam Galvin
Jakub Kostecki
Kendra Kimmel
Aaryn Kay
David Hughes
Hollie Sprague
Lori Schell​

​​Community

David Lorraine
Brent Fontana​

Related Resources
​​​Community Meetings

Sept. | Community Visioning Meeting
 View Presentation

Dec. 7 | Update to Community

 View Presentation​


Discovery Visit

Sept. 8 & 9
  ​​​View Dashboard​
​​  View Discovery Report

 

 

DAT Guidelines - Revised 2015http://bond.bvsd.org/projects/Creekside/Lists/DAT Related Resources/DispForm.aspx?ID=6http://bond.bvsd.org/projects/Creekside/Lists/DAT Related Resources/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}DAT Guidelines - Revised 2015http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf, http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdfpage

DAT Meeting Schedule

All meetings are 3-5 PM. DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting. ​​

 

 

March 8http://bond.bvsd.org/projects/Creekside/Lists/DAT Meetings List/DispForm.aspx?ID=15http://bond.bvsd.org/projects/Creekside/Lists/DAT Meetings List/DispForm.aspx?ID=15{28e838a4-8015-4177-ac17-2576b5d1e514}March 8http://bond.bvsd.org/projects/Creekside/DATMeetingDocs/CreeksideDAT6MtgMnts03.08.2016.pdf, http://bond.bvsd.org/projects/Creekside/DATMeetingDocs/CreeksideDAT6MtgMnts03.08.2016.pdfhttp://bond.bvsd.org/projects/Creekside/DATMeetingDocs/CreeksideDAT6Prsntweb.compressed.pdf, http://bond.bvsd.org/projects/Creekside/DATMeetingDocs/CreeksideDAT6Prsntweb.compressed.pdf
Dec. 7http://bond.bvsd.org/projects/Creekside/Lists/DAT Meetings List/DispForm.aspx?ID=14http://bond.bvsd.org/projects/Creekside/Lists/DAT Meetings List/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}Dec. 7http://bond.bvsd.org/projects/Creekside/DATMeetingDocs/2015-1207-CreeksideDAT5Mnts.pdf, http://bond.bvsd.org/projects/Creekside/DATMeetingDocs/CreeksideDAT5MtgMnts120715.pdfhttp://bond.bvsd.org/projects/Creekside/DATMeetingDocs/2015-1207-CreeksideDAT5Prsntweb.pdf, http://bond.bvsd.org/projects/Creekside/DATMeetingDocs/2015-1104-CreeksideDAT4Presentation.pdf
Nov. 4 http://bond.bvsd.org/projects/Creekside/Lists/DAT Meetings List/DispForm.aspx?ID=13http://bond.bvsd.org/projects/Creekside/Lists/DAT Meetings List/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}Nov. 4 http://www.bvsd.org/CapitalImprovements/Documents/Creekside/CreeksideDAT4MtgMnts11.04.15.pdf, http://www.bvsd.org/CapitalImprovements/Documents/Creekside/CreeksideDAT4MtgMnts11.04.15.pdfhttp://bond.bvsd.org/projects/Creekside/DATMeetingDocs/2015-1104-CreeksideDAT4Prsntweb.pdf, http://bond.bvsd.org/projects/Creekside/DATMeetingDocs/2015-1104-CreeksideDAT4Prsntweb.pdf
Oct. 7http://bond.bvsd.org/projects/Creekside/Lists/DAT Meetings List/DispForm.aspx?ID=12http://bond.bvsd.org/projects/Creekside/Lists/DAT Meetings List/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}Oct. 7http://www.bvsd.org/CapitalImprovements/Documents/Creekside/Creekside%20DAT%203%20Meeting%20Minutes%20by%20FNI.pdf, http://www.bvsd.org/CapitalImprovements/Documents/Creekside/Creekside%20DAT%203%20Meeting%20Minutes%20by%20FNI.pdfhttp://bond.bvsd.org/projects/Creekside/DATMeetingDocs/2015-1007-CreeksideDAT3Prsntweb.pdf, http://bond.bvsd.org/projects/Creekside/DATMeetingDocs/2015-1007-CreeksideDAT3Prsntweb.pdf
Sept. 23http://bond.bvsd.org/projects/Creekside/Lists/DAT Meetings List/DispForm.aspx?ID=11http://bond.bvsd.org/projects/Creekside/Lists/DAT Meetings List/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}Sept. 23http://www.bvsd.org/CapitalImprovements/Documents/Creekside/CSDAT2MtgMts92315.pdf, http://www.bvsd.org/CapitalImprovements/Documents/Creekside/CSDAT2MtgMts92315.pdfhttp://www.bvsd.org/CapitalImprovements/Documents/Creekside/CSDATMtg2Pres92315.pdf, http://www.bvsd.org/CapitalImprovements/Documents/Creekside/CSDATMtg2Pres92315.pdf
Sept. 9http://bond.bvsd.org/projects/Creekside/Lists/DAT Meetings List/DispForm.aspx?ID=10http://bond.bvsd.org/projects/Creekside/Lists/DAT Meetings List/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}Sept. 9http://www.bvsd.org/CapitalImprovements/Documents/Creekside/CSDAT1MtgMin9.9.15.pdf, http://www.bvsd.org/CapitalImprovements/Documents/Creekside/CSDAT1MtgMin9.9.15.pdfhttp://www.bvsd.org/CapitalImprovements/Documents/Creekside/CSDATMtg1Presentation.pdf, http://www.bvsd.org/CapitalImprovements/Documents/Creekside/CSDATMtg1Presentation.pdf

Timeline

 

 

Schematic Designhttp://bond.bvsd.org/projects/Creekside/Lists/Project Timeline/DispForm.aspx?ID=10http://bond.bvsd.org/projects/Creekside/Lists/Project Timeline/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}Schematic DesignNov. 2015Completesuccess
Design Developmenthttp://bond.bvsd.org/projects/Creekside/Lists/Project Timeline/DispForm.aspx?ID=9http://bond.bvsd.org/projects/Creekside/Lists/Project Timeline/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}Design DevelopmentFeb. 2016Completesuccess
Construction Documentshttp://bond.bvsd.org/projects/Creekside/Lists/Project Timeline/DispForm.aspx?ID=8http://bond.bvsd.org/projects/Creekside/Lists/Project Timeline/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}Construction DocumentsMarch 2016Completesuccess
Construction http://bond.bvsd.org/projects/Creekside/Lists/Project Timeline/DispForm.aspx?ID=7http://bond.bvsd.org/projects/Creekside/Lists/Project Timeline/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}Construction May 2016 - Aug. 2017In Progressinfo

Images

expand + Yr/Month : August 2016 ‎(4)
expand + Yr/Month : June 2016 ‎(12)
expand + Yr/Month : September 2016 ‎(6)

Scope of Work

The Creekside Elementary School building will be replaced with one of similar size to serve the current enrollment area of Creekside. When district staff assessed the needs of the building, it was determined that it makes more financial sense to replace the building rather than make significant investments in repairs and maintenance. 

New construction provides the opportunity to create innovative, 21st Century learning spaces that support modern curriculum delivery in a building that is safe, comfortable and energy efficient. Using BVSD’s green building principles as a guide, the school can be built green from the ground up.​​