Broomfield Heights Middle Schoolhttp://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=7http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}Broomfield Heights Middle School1555 Daphne Street Broomfield, CO 80020http://schools.bvsd.org/p12/broomfieldheights720.561.8400Phase 11983<img alt="" src="/projects/Project%20Profile%20Images/BroomfieldHeightsMS-photo-300x300.JPG" style="BORDER:0px solid;" />$14,375,337$400,000 included in budget

Latest Updates

 

 

Construction Update | September 2016http://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=12http://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update | September 2016Construction is complete. Students and staff are enjoying their new and renovated spaces!

 

 

December Updatehttp://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=1http://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}December UpdateThe design team is working on design development.
Neighbor Introduction Letterhttp://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=10http://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}Neighbor Introduction Letterhttp://bond.bvsd.org/projects/BroomfieldHeights/Documents/BHMS%20neighbor%20introduction%20letter.pdf, http://bond.bvsd.org/projects/BroomfieldHeights/Documents/BHMS%20neighbor%20introduction%20letter.pdf
Construction Update July 2016http://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=11http://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update July 2016Construction is progressing on schedule with anticipated substantial completion by August.
January Updatehttp://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=3http://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}January UpdateBidding is underway. Construction is scheduled to begin in February.
March Updatehttp://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=4http://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}March UpdateConstruction is underway. Day work has started in the 3rd Pod of classroom. Move back into 2nd Pod happened as planned on 3/12/16. Night shift work is expected to start the week of 3/13/16. Work on the new turf field and track is scheduled to start 4/1/16.
Construction Kick-off E-blast to Familieshttp://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=5http://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Kick-off E-blast to Familieshttp://bond.bvsd.org/projects/BroomfieldHeights/Documents/BHMS%20Construction%20Kick-off%20E-blast%20to%20Families.pdf, http://bond.bvsd.org/projects/BroomfieldHeights/Documents/BHMS%20Construction%20Kick-off%20E-blast%20to%20Families.pdf
Field Construction Notification to Neighborshttp://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=6http://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}Field Construction Notification to Neighborshttp://bond.bvsd.org/projects/BroomfieldHeights/Documents/BHMSfieldconstpostcardneighborsweb.pdf, http://bond.bvsd.org/projects/BroomfieldHeights/Documents/BHMSfieldconstpostcardneighborsweb.pdf
May 2016 Updatehttp://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=7http://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}May 2016 UpdateConstruction continues on schedule.
June 2016 Updatehttp://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=8http://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}June 2016 UpdateConstruction continues on schedule. Most of the school is fully engulfed in construction with dozens of workers onsite. See new photos of the work in the images section below.
Construction Notification to Neighborshttp://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=9http://bond.bvsd.org/projects/BroomfieldHeights/Lists/Latest Updates/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Notification to Neighborshttp://bond.bvsd.org/projects/BroomfieldHeights/Documents/BHMS%20Construction%20Kick-off%20Postcard%20to%20Neighborsweb.pdf, http://bond.bvsd.org/projects/BroomfieldHeights/Documents/BHMS%20Construction%20Kick-off%20Postcard%20to%20Neighborsweb.pdf

Project Details

Project Team
Project Manager

 

 

Mark Schlindweinhttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}Mark Schlindweinmark.schlindwein@bvsd.org720-561-5953mailto:mark.schlindwein@bvsd.org, mailto:mark.schlindwein@bvsd.org

Architect

 

 

Wold Architects and Engineershttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=31{28e838a4-8015-4177-ac17-2576b5d1e514}Wold Architects and Engineershttp://www.woldae.com/, http://www.woldae.com/

Contractor

 

 

Nunn Constructionhttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=32{28e838a4-8015-4177-ac17-2576b5d1e514}Nunn Constructionhttp://www.nunnconstruction.com/, http://www.nunnconstruction.com/

Related Resources

 

 

Educational Facilities Master Planhttp://bond.bvsd.org/projects/BroomfieldHeights/Lists/Related Resources/DispForm.aspx?ID=5http://bond.bvsd.org/projects/BroomfieldHeights/Lists/Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttp://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=30, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=30page

Details
Project Budget

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=7http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}$14,375,337

Innovation Budget

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=7http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}$400,000 included in budget

Bond Expenditures

 

 

Broomfield Heights Middle Schoolhttp://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=7http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}Broomfield Heights Middle Schoolhttp://bond.bvsd.org/financial/Documents/CurrentProgramExpenditures.pdf, Bond Program Expenditures

Project Expenditures

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=7http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}http://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=7http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClass4A10DE3B093F4169A20A74CF5D673020"><div>Under development</div></div>

Energy Efficiency/Green Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=7http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClass4D13028809364A80B97337340F189AE3"><div>Broomfield Heights' project team worked hard to maximize energy efficiency in the building renovations and reduced overall energy consumption by 30 percent.  <strong style="color:#006984;text-decoration:underline;"></strong><a href="https://sway.com/ylmZgnavFtQJXAb4"><span style="color:#0072c6;text-decoration:underline;"><strong style="text-decoration:underline;">Click here to learn more</strong> </span></a><br></div></div>

Educational Innovation Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=7http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClassA27932C037934722AB0E249935C21D2E">Broomfield Heights' innovation project created a flexible learning space in a central and open area of the building. This space expands from the current library into academic areas and the corridor. The space includes large group and small group collaborative learning areas with flexible arrangement of open learning environments, as well as technology integration in the form of multi-modal presentation capabilities. There is also a staff collaboration area. </div><div class="ExternalClassA27932C037934722AB0E249935C21D2E"><br></div><div class="ExternalClassA27932C037934722AB0E249935C21D2E"><strong>Click on the photo below to get more information and see photos. </strong><br></div><div class="ExternalClassA27932C037934722AB0E249935C21D2E"><br></div><div class="ExternalClassA27932C037934722AB0E249935C21D2E"><a href="/educational-innovation/Pages/Broomfield%20Heights%20Middle%20School-Innovation-Project.aspx"><img src="/educational-innovation/PublishingImages/BHMSInnovationSwayLink.JPG" alt="" style="margin:5px;width:300px;height:227px;" /></a><br></div>

Design Advisory Team

​The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.​

Staff 

Chris Meyer, Principal
Jeff VanIwarden, AP
Kris Lucic, PE/LA Teacher
Jack Mcloud, Science Teacher
Christian Adams, Special Education Teacher
Scott Miller, Science Teacher and Ed. Tech. Liaison
Tom Graham, Head Custodian

Parents
Carrie Pepperdine, Parent
Kevin O'Brien, Parent

​​Community​

Wendy Fiedler, Community Member
Kirk Oglesby, Community Member​

Related Resources

 

 

Design Advisory Team Guidelineshttp://bond.bvsd.org/projects/BroomfieldHeights/Lists/DAT Related Resources/DispForm.aspx?ID=5http://bond.bvsd.org/projects/BroomfieldHeights/Lists/DAT Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Design Advisory Team Guidelineshttp://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf, http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdfpage

DAT Meeting Schedule

DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting. ​​

 

 

Oct. 6http://bond.bvsd.org/projects/BroomfieldHeights/Lists/DAT Meetings List/DispForm.aspx?ID=5http://bond.bvsd.org/projects/BroomfieldHeights/Lists/DAT Meetings List/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Oct. 6http://www.bvsd.org/CapitalImprovements/Documents/BHMS%20DAT%20Meeting%20Minutes/BHMSDAT5MtgMnts10615.pdf, http://www.bvsd.org/CapitalImprovements/Documents/BHMS%20DAT%20Meeting%20Minutes/BHMSDAT5MtgMnts10615.pdf
Sept. 8http://bond.bvsd.org/projects/BroomfieldHeights/Lists/DAT Meetings List/DispForm.aspx?ID=4http://bond.bvsd.org/projects/BroomfieldHeights/Lists/DAT Meetings List/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}Sept. 8http://www.bvsd.org/CapitalImprovements/Documents/BHMS%20DAT%20Meeting%20Minutes/BHMSDAT4MtgMinutes9815.pdf, http://www.bvsd.org/CapitalImprovements/Documents/BHMS%20DAT%20Meeting%20Minutes/BHMSDAT4MtgMinutes9815.pdfhttp://www.bvsd.org/CapitalImprovements/Documents/Intro%20to%20Innovative%20Spaces%20BVSD.pdf, http://www.bvsd.org/CapitalImprovements/Documents/Intro%20to%20Innovative%20Spaces%20BVSD.pdf
Aug. 25http://bond.bvsd.org/projects/BroomfieldHeights/Lists/DAT Meetings List/DispForm.aspx?ID=3http://bond.bvsd.org/projects/BroomfieldHeights/Lists/DAT Meetings List/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Aug. 25http://www.bvsd.org/CapitalImprovements/Documents/BHMS%20DAT%20Meeting%20Minutes/BHMS%20DAT%203%20Meeting%20Minutes%208-25-15.pdf, http://www.bvsd.org/CapitalImprovements/Documents/BHMS%20DAT%20Meeting%20Minutes/BHMS%20DAT%203%20Meeting%20Minutes%208-25-15.pdf
Aug. 10http://bond.bvsd.org/projects/BroomfieldHeights/Lists/DAT Meetings List/DispForm.aspx?ID=2http://bond.bvsd.org/projects/BroomfieldHeights/Lists/DAT Meetings List/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Aug. 10http://www.bvsd.org/CapitalImprovements/Documents/BHMS%20DAT%20Meeting%20Minutes/BHMS%20DAT%202%20Meeting%20Minutes%208-10-2015.pdf, http://www.bvsd.org/CapitalImprovements/Documents/BHMS%20DAT%20Meeting%20Minutes/BHMS%20DAT%202%20Meeting%20Minutes%208-10-2015.pdf
May 20http://bond.bvsd.org/projects/BroomfieldHeights/Lists/DAT Meetings List/DispForm.aspx?ID=1http://bond.bvsd.org/projects/BroomfieldHeights/Lists/DAT Meetings List/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}May 20http://www.bvsd.org/CapitalImprovements/Documents/BHMS%20DAT%20Meeting%20Minutes/BHMS%20DAT%201%20Meeting%20Minutes%2005-20-2015.pdf, http://www.bvsd.org/CapitalImprovements/Documents/BHMS%20DAT%20Meeting%20Minutes/BHMS%20DAT%201%20Meeting%20Minutes%2005-20-2015.pdf

Timeline

 

 

Construction http://bond.bvsd.org/projects/BroomfieldHeights/Lists/Project Timeline/DispForm.aspx?ID=2http://bond.bvsd.org/projects/BroomfieldHeights/Lists/Project Timeline/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Feb. - Aug. 2016Completeinfo
Biddinghttp://bond.bvsd.org/projects/BroomfieldHeights/Lists/Project Timeline/DispForm.aspx?ID=3http://bond.bvsd.org/projects/BroomfieldHeights/Lists/Project Timeline/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}BiddingDec. 2015Completewarning
Permittinghttp://bond.bvsd.org/projects/BroomfieldHeights/Lists/Project Timeline/DispForm.aspx?ID=4http://bond.bvsd.org/projects/BroomfieldHeights/Lists/Project Timeline/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}PermittingNov. 9 - Jan. 4, 2016Completeinfo
Construction Documentshttp://bond.bvsd.org/projects/BroomfieldHeights/Lists/Project Timeline/DispForm.aspx?ID=5http://bond.bvsd.org/projects/BroomfieldHeights/Lists/Project Timeline/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Construction DocumentsSept. 21 - Nov. 20Completesuccess
Design Developmenthttp://bond.bvsd.org/projects/BroomfieldHeights/Lists/Project Timeline/DispForm.aspx?ID=6http://bond.bvsd.org/projects/BroomfieldHeights/Lists/Project Timeline/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}Design DevelopmentAug. 10 - Oct. 2Completesuccess
Schematic Designhttp://bond.bvsd.org/projects/BroomfieldHeights/Lists/Project Timeline/DispForm.aspx?ID=7http://bond.bvsd.org/projects/BroomfieldHeights/Lists/Project Timeline/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}Schematic DesignJuly 1 - Aug. 28Completesuccess

Images

expand + Yr/Month : June 2016 ‎(10)

Scope of Work

​Facility Condition

  • Exterior building improvements such as replace/repair doors and windows, repair masonry and painting
  • Replace roof
  • Replace operable walls
  • Replace interior doors
  • Improvements to interior finishes such as carpet, flooring, tile and paint
  • Restroom renovations
  • Plumbing repair/replacement
  • HVAC repair/replacement
  • Install building-wide air conditioning
  • Electrical system improvements
  • Fire protection system improvements
  • Repair/replace fixtures and equipment such as lockers, stage curtains, bleachers and casework
  • Site improvements such as paving and irrigation
  • Audio enhancement in every classroom**

Program Compatibility Assessment

  • Provide adequate Special Education space
  • Provide additional seating in cafetorium

Health and Physical Development

  • Athletic field improvements
  • Provide track and synthetic field

Safety and Security

  • Install electronic security controls
  • Install security partitions
  • Redesign main entry to provide more control over visitor access
  • Install camera/intercom security system
  • Install exterior security cameras

Sustainability​

  • Upgrade lighting
  • Upgrade HVAC controls

Innovation​

Broomfield Heights Middle School is eligible to receive up to $400,000 in additional funds to implement facility improvements that support innovative teaching methods. ​

** Not included in project budget​