Boulder High Schoolhttp://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=6http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}Boulder High School1604 Arapahoe Avenue Boulder, CO 80302https://boh.bvsd.org/720.561.2200Phase 11937<img alt="" src="/projects/Project%20Profile%20Images/BoulderHS-photo-300x300.JPG" style="BORDER:0px solid;" />$20,266,449$800,000 included in budget

Latest Updates

 

 

Turner Construction Progress Report June 6, 2017http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=41http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=41{28e838a4-8015-4177-ac17-2576b5d1e514}Turner Construction Progress Report June 6, 2017http://bond.bvsd.org/projects/Boulder/Documents/Progress%20Report%206-9-17.pdf, http://bond.bvsd.org/projects/Boulder/Documents/Progress%20Report%206-9-17.pdf
June 5, 2017http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=40http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=40{28e838a4-8015-4177-ac17-2576b5d1e514}June 5, 2017Boulder High School minus the gymnasium area will be closed for the summer. It is important school personnel other than pre-approved employees stay out of the building this summer. If by chance you need to see the treasurer, registrar or principal’s assistant this summer, please call first to be sure they are in the building. Major work is continuing in the cafeteria and kitchen area of Boulder High. http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%2018.pdf, http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%2018.pdf
5 de junio de 2017http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=39http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=39{28e838a4-8015-4177-ac17-2576b5d1e514}5 de junio de 2017Con la excepción del gimnasio, la escuela Boulder High estará cerrada por el verano. Es importante que el personal de la escuela no está en el edificio, con la excepción de empleos pre-aprobados. Si se necesita hablar con la tesorera, la registradora, o la asistente del director este verano, por favor, llame de antemano para asegurar que están en el edificio. http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%2018%20SP.pdf, http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%2018%20SP.pdf

 

 

Trabajo del verano – 1 de Agosto, 2016 Puesta al día sobre la construcción #5http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=11http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}Trabajo del verano – 1 de Agosto, 2016 Puesta al día sobre la construcción #5La mayoridad del trabajo de Boulder High está ultimando este mes en preparación para el comienzo de clases el 18 de Agosto. Por favor, tome en cuento que el estacionamiento estará casi no disponible durante la carrera IRONMAN la primera semana de agosoto, les avisamos estacionarse en la calle. Pedimos que los alumnos y miembros del personal no vengan a la escuela durante este tiemo a menos que están participando en un campo de verano para los deportes. Solamente se pueden entrarse al gimnaso en EL LADO SUR DEL GIMNASIO. Además, el área de estacionamiento en la calle 17 será ocupado por el equipo de construcción y pore so no estará disponible. http://bond.bvsd.org/projects/Boulder/Documents/Construction%20update%205%20SPANISH.pdf, http://bond.bvsd.org/projects/Boulder/Documents/Construction%20update%205%20SPANISH.pdf
Trabajo del verano – 15 de Agosto, 2016http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=12http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}Trabajo del verano – 15 de Agosto, 2016La mayoridad de la construcción del verano está terminando en anticipación del primer día de clases el 18 de Agosto. La lista se vuelve más corta. La construcción continuará en los salones de clase 1153, 1151, 1149, y 1147 durante el año escolar. http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%206%20August%2015%202016%20SP.pdf, http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%206%20August%2015%202016%20SP.pdf
Trabajo del otoño – 7 de septiembre, 2016 Puesta al día sobre la construcción #7http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=15http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=15{28e838a4-8015-4177-ac17-2576b5d1e514}Trabajo del otoño – 7 de septiembre, 2016 Puesta al día sobre la construcción #7La construcción continua en loss alones de clase 1153, 1151, 1149, y 1147. El trabajo empieza en la instalación de nuevas unidades de manejo de volumen de aire variable (VAV) y pintura fresca en cada salón de clase. Este trabajo continuará para todo el otoño, empezando en salones 1154 y 1146. Los baños en el vestíbulo principal estarán cerrados por un rato después del 15 de septiembre para instalar encimeras nuevas. http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%207%20Sept%20%207%202016%20(SP).pdf, http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%207%20Sept%20%207%202016%20(SP).pdf
Trabajo del otoño – 20 de septiembre, 2016http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=17http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}Trabajo del otoño – 20 de septiembre, 2016La construcción continua en los salones de clase 1153, 1151, 1149, y 1147. El trabajo continúa en la instalación de las nuevas unidades de manejo de volumen de aire variable (VAV). Pintura fresca en cada salón de clase tomará lugar después de que entendemos más sobre la calidad de aire . Este trabajo continuará para todo el otoño. Otros salones de clase (salones 2219, 2223, 2224, 2225, y 2226) recibirán nuevas unidades de manejo de volumen de aire variable (VAV), con el trabajo empezando esta semana. Probamos las nuevas calderas en preparación para el otoño y el invierno. La mejoración del sistema de intercomunicadores va a pasar en las semanas entrantes.http://bond.bvsd.org/projects/Boulder/Documents/ConstructionUpdate8SP.pdf, http://bond.bvsd.org/projects/Boulder/Documents/ConstructionUpdate8SP.pdf
Trabajo del otoño – 27 de octubre, 2016http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=19http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=19{28e838a4-8015-4177-ac17-2576b5d1e514}Trabajo del otoño – 27 de octubre, 2016La construcción en los salones de clase 1153, 1151, 1149 y 1147 termina esta semana. El trabajo continua en la instalación de nuevas unidades de manejo de volumen de aire variable (VAV) y la balanza del aire continua. Estamos en las etapas 6 y 7 de este proceso, afectando salones de clase 2244, 2246, 2247, 2251, 2253, y 2254. Empezando el 4 de noviembre, la construcción empieza en los salones de clase de matemáticas. El mejoramiento del sistema de intercomunicadores termina en los fines de octubre. El personal de la oficina principal recibió entrenamiento sobre el sistema nuevo. Baños 1125 y 1123 todavía están cerrados por la construcción. http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%209SP.pdf, http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%209SP.pdf
Perspectiva general de la construcciónhttp://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=24http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=24{28e838a4-8015-4177-ac17-2576b5d1e514}Perspectiva general de la construcciónDurante las vacaciones del invierno, el trabajo tomó lugar en la cafetería. La cafetería paracerá diferente para el resto del año escolar. Pintaremos algunos corredores durante la noche en el mes de enero. Los áreas serán ventilados durante la noche mientras que completamos este trabajo. El trabajo continúa en la instalación de nuevas unidades de manejo de volumen de aire variable (VAV) y la balanza del aire continua. El trabajo “VAV” mueve al segundo piso en el área de ciencias y al tercer piso durante el mes de enero. http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%2012%20SP.pdf, http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%2012%20SP.pdf
Trabajo del otoño | 22 de noviembre de 2016http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=20http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=20{28e838a4-8015-4177-ac17-2576b5d1e514}Trabajo del otoño | 22 de noviembre de 2016La construcción en los salones de clase 1153, 1151, 1149 y 1147 ha terminado y estamos instalando los muebles esta semana. El trabajo continúa en la instalación de nuevas unidades de manejo de volumen de aire variable (VAV) y la balanza del aire continúa. Estamos en las etapas 9 y 10 de este proceso, afectando los salones de clase 2260 - 2285, y 2228B. Las renovaciones del Intercomunicador continúan y nuevos altavoces se están instalando en algunas zonas. Han acabado los baños 1125 y 1123 durante las vacaciones del Día de Acción de Gracias. Los baños del segundo piso 2203 y 2242 fueron derribados para poder poner nuevas instalaciones.http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%2010SP%20Revised.pdf, http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%2010SP%20Revised.pdf
Puesta al día sobre la construcción #11 | 8 de diciembre de 2016http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=23http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=23{28e838a4-8015-4177-ac17-2576b5d1e514}Puesta al día sobre la construcción #11 | 8 de diciembre de 2016Durante las vacaciones de invierno, las baldosas de techo en la cafetería serán eliminadas. Cables y tubería serán visibles cuando los estudiantes regresan en enero, pero el contenido del techo será seguro. El trabajo de la neutralización del asbesto será completado por un proveedor de servicio autorizado por el estado de Colorado según el protocolo del Distrito Escolar del Valle de Boulder (BVSD) y el Departamento de Salud Pública y Ambiente de Colorado (CDPHE). El trabajo continúa en la instalación de nuevas unidades de manejo de volumen de aire variable (VAV) y la balanza del aire continúa. Cambiamos el trabajo de “VAV” al área de ciencias en el primer piso durante las vacaciones en noviembre. Después de vacaciones de invierno cambiaremos con el trabajo en el tercer piso. Unidades en el techo (RTUs, por sus siglos en inglés) números 3 y 5 estarán cerradas y balanzadas. El mejoramiento del sistema de intercomunicadores continúa y estamos instalando nuevas altavoces en algunas áreas. Los baños 2203 y 2242 serán completados para el 15 de enero.http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%2011%20SP%20ed.pdf, http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%2011%20SP%20ed.pdf
18 de mayo de 2017http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=35http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=35{28e838a4-8015-4177-ac17-2576b5d1e514}18 de mayo de 2017Aunque el año escolar 2016-2017está terminando, el trabajo de la construcción está tomando un ritmo acelerado. Empezando la semana entrante, vamos a cerrar el sur de la cafetería, la oficina de la policía escolar, y el salon de conferencia en la oficina principal. Después de los exámenes finales, la cafetería estará cerrada los alumnos. El trabajo de la construcción empieza en la cocina el 27 de mayo. El gimnasio está cerrada durante las noches por el trabajo en el sistema de megafonía y luces de emergencia. Trabajo en los baños en el área de matemáticas continúa y empezará en el área de idiomas mundiales durante el verano. El reemplazo y adición de nuevas fuentes de agua continúa este mes. También estamos termindando la remodelación de los vestidores y los baños abajo del escenario en auditorio. Medidas de preparación en caso de emergencia empezarán en el auditorio la semana de 26 de mayo. La cabina de la prensa en el Campo Recht está tomando forma. ¡El edificio es casi completado! Con la excepción del gimnasio, la escuela Boulder High estará cerrada por el verano. Es importante que el personal de la escuela no está en el edificio, con la excepción de empleos pre-aprobados. http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%2017%20SP.pdf, http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%2017%20SP.pdf
Perspectiva general de la construcciónhttp://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=26http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=26{28e838a4-8015-4177-ac17-2576b5d1e514}Perspectiva general de la construcciónLes recordamos que la escuela Boulder High cierra cada día a las 4:00pm para la construcción. Recientamente hay demasiados estudiantes en la escuela donde la construcción está ocurriendo. Este mes, terminaremos el trabajo de pintar los corredores. El trabajo continúa en la instalación de nuevas unidades de manejo de volumen de aire variable (VAV) con el trabajo moviendo al área de idiomas mundiales y la oficina principal. La balanza del aire continúa después de la instalación de las nuevas unidades de manejo de volume de aire variable (VAV). Empezamos el trabajo de la seguridad de la escuela, con los trabajadores determinan ubicaciones para las cámaras. También estamos instalando el cabelado para los timbres en las puertas. El trabajo en la cabina de la prensa empieza el 27 de febrero en el campo Recht.
abril de 2017http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=30http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=30{28e838a4-8015-4177-ac17-2576b5d1e514}abril de 2017El trabajo continúa en los baños del tercer piso, con el trabajo termindando el 20 de abril. Después, trabajamos en el área de los salones de matemáticas al fin de abril. Estos baños recibirán nueva Fuente de agua en el pasillo. Trabajo en el techo de la cafetería empieza con la eliminación y reemplazo de las luces y los conductos. Trabajo en el sistema de seguridad y el sistema de luces de emergencia continúa en todo el edificio. Empezamos el trabajo en el Campo Recht, específicamente en la cabina de la prensa. http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%2015%20SP.pdf, http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%2015%20SP.pdf
mayo de 2017http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=33http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=33{28e838a4-8015-4177-ac17-2576b5d1e514}mayo de 2017En mayo habrán muchos cambios en la escuela debido del trabajo de la construcción. La mayoridad del trabajo será en la cafeteria, el auditorio, y la oficina principal. Trabajo en los baños en el área de matemáticas continuará en el primer parte de mayo. Después, los trabajadores empezarán con los baños en el área de idiomas mundiales. El reemplazo e instalación de nuevas fuentes de agua continua este mes, también. Trabajo en el sistema de seguridad y el sistema de luces de emergencia continúa en todo el edificio. Empezamos el trabajo en el Campo Recht, específicamente en la cabina de la prensa.http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%2016%20SP.pdf, http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%2016%20SP.pdf
March 2017http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=28http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=28{28e838a4-8015-4177-ac17-2576b5d1e514}March 2017Trabajo en en la instalación de nuevas unidades de manejo de volumen de aire variable (VAV) termina este mes. Unidades de tratamiento del aire (AHU) en los vestuarios del gimnasio serán instalados durante la semana de vacación de la primavera. El sistema será balanzado y probado durante las vacaciones. Nos quedan 5-7 VAVs para instalar durante el verano cuando trabajaremos en la cafetería. Trabajo del cabelado para sistemas de seguridad y emergencia continúa en el edificio. Empezamos el trabajo de la cerca en el campo Recht. Pintaremos los salones de clase en el tercer piso durante las vacaciones de la primavera. http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%2014%20SP.pdf, http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%2014%20SP.pdf
December Updatehttp://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=1http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}December UpdateThe design team is working on design development drawings. http://www.bvsd.org/CapitalImprovements/Documents/DAT%20Guidelines%20%20Revised%202015.pdf#page=6, http://www.bvsd.org/CapitalImprovements/Documents/DAT%20Guidelines%20%20Revised%202015.pdf#page=6
Construction Update August 2016http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=10http://bond.bvsd.org/projects/Boulder/Lists/Latest Updates/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}Construction Update August 2016The majority of the work for Boulder High is coming to a close this month right before school starts on August 18th. Please note that, parking will be at a minimum during the IRONMAN the week of August 1st, using street parking is advised. We ask that students and staff not come to the school during this time unless they are a part of a summer athletics camp. Entry to the gym area will be available only on the SOUTH SIDE OF THE GYM. Also, the 17th street parking lot will be occupied by the construction crew so parking in this lot will not be available. Follow the link for details. http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%205%20August%201%202016.pdf, http://bond.bvsd.org/projects/Boulder/Documents/Construction%20Update%205%20August%201%202016.pdf

Project Details

Project Team
Project Manager

 

 

Tom Blahakhttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}Tom Blahaktom.blahak@bvsd.org720-561-5791mailto:tom.blahak@bvsd.org, mailto:tom.blahak@bvsd.org

Architect

 

 

Hord Coplan Machthttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=20{28e838a4-8015-4177-ac17-2576b5d1e514}Hord Coplan Machthttp://www.slaterpaull.com/, http://www.slaterpaull.com/

Contractor

 

 

Turnerhttp://bond.bvsd.org/projects/Lists/Master Contacts/DispForm.aspx?ID=40{28e838a4-8015-4177-ac17-2576b5d1e514}Turner

Related Resources

 

 

Educational Facilities Master Planhttp://bond.bvsd.org/projects/Boulder/Lists/Related Resources/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Boulder/Lists/Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Educational Facilities Master Planhttp://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=28, http://bond.bvsd.org/masterplan/Documents/EdFacilityMasterPlan.pdf#page=28page

Details
Project Budget

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=6http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}$20,266,449

Innovation Budget

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=6http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}$800,000 included in budget

Bond Expenditures

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=6http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}http://bond.bvsd.org/financial/Documents/CurrentProgramExpenditures.pdf, Bond Program Expenditures

Project Expenditures

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}http://bond.bvsd.org/financial/Documents/CurrentProjectExpenditures.pdf, Project Expenditures

Sustainability Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=6http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClass86B72B8AEFE34D18940A78D1D470FBA1"><div>Under development</div></div>

Energy Efficiency/Green Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=6http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClassB66A3610A48743459E4059C73B518BC5"><div>Under development</div></div>

Educational Innovation Features

 

 

http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=6http://bond.bvsd.org/projects/Lists/ProjectsProfiles/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}<div class="ExternalClass4C8BEF4AD30D4EBB8DCC9DBE51DB8A03">BHS used its innovation funds to remodel the library into a Curiosity Center that will benefit the entire school and potentially community. <span style="color:#212121;font-family:calibri, arial, sans-serif;white-space:pre-wrap;background-color:#ffffff;font-size:14.6667px;">The goal is to create a space that is appealing to and used by all members of the student body. </span>The Curiosity Center will combine with the cafeteria to create a heart space for the school. <br><div><br></div><div><a href="/educational-innovation/Pages/Boulder-High-Innovation-Project.aspx" style="text-decoration:underline;"><strong style="color:#0072c6;">Read more</strong></a><strong> </strong>and see photos of the project.<br><br></div></div>

Design Advisory Team

​The Design Advisory Team (DAT) team includes teachers, staff, parents and community members who will work with the architects to develop the design for the project.​

NOTE:  Other staff may be brought in, as needed, for specific aspects of the project which relate directly to their area/discipline.

DAT Members - Building

Staff 
Dan Snook, Math Teacher
Beau Bryson, Band Teacher
Chris Sweeney, Theatre Sponsor/Teacher
Mariah Garcia, SpEd Teacher
Monique Guidry, PE Teacher
Beau Bryson, Music Teacher
Virginia Schick, Art Teacher
Richard Trinkner, Social Studies Teacher
Tony Jiron, Computers/Technology
Rebecca Vancura, Library

Mary Shelton-Kelly, Head Cook
Mark Loftesness, Head Custodian

BVSD Staff

Tom Blahak - BVSD
Terry Gillach - Admin Support
Kiffany Lychock - Innovation
David Eggen - Innovation

Parents

Elizabeth Smith
Jude Wolpert   
Roman Martinez

DAT Members - Athletics: RECHT FIELD

Boulder High School
Eddie Hartnett, Athletic Director
Shannon Aberton, Athletic Trainer
Ryan Bishop, Teacher/Coach
Janice Hughes, Parent
Maria Trysla, Parent

Fairview High School
Don Stensrud, Principal - Fairview
Terrin Kelly, Athletic Director
Tom McCartney, Head Football Coach
Aaron Hickman, Assistant Football Coach
Tim McWilliams, Coach/Parent
Scott Anderson, Parent
  
​​Community​
Related Resources

 

 

Design Advisory Team Guidelineshttp://bond.bvsd.org/projects/Boulder/Lists/DAT Related Resources/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Boulder/Lists/DAT Related Resources/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Design Advisory Team Guidelineshttp://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdf, http://bond.bvsd.org/projects/Documents/DATGuidelines-Revised2015.pdfpage

DAT Meeting Schedule

DAT meetings are open for the public to observe, and there is an opportunity for public comment at each meeting. ​​

 

 

May 16, 2016 | Recht Fieldhttp://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=17http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=17{28e838a4-8015-4177-ac17-2576b5d1e514}May 16, 2016 | Recht Fieldhttp://bond.bvsd.org/projects/Boulder/DATMeetingDocs/DAT%20Recht%20Field%20Meeting%20Summary_04.pdf, http://bond.bvsd.org/projects/Boulder/DATMeetingDocs/DAT%20Recht%20Field%20Meeting%20Summary_04.pdf
May 25, 2016 | Field Househttp://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=13http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=13{28e838a4-8015-4177-ac17-2576b5d1e514}May 25, 2016 | Field Househttp://bond.bvsd.org/projects/Boulder/DATMeetingDocs/DAT%20BHS%20Field%20House%20Meeting%20Summary_03.pdf, http://bond.bvsd.org/projects/Boulder/DATMeetingDocs/DAT%20BHS%20Field%20House%20Meeting%20Summary_03.pdf
April 12, 2016 | Recht Fieldhttp://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=12http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=12{28e838a4-8015-4177-ac17-2576b5d1e514}April 12, 2016 | Recht Field
Mar. 16, 2016http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=11http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=11{28e838a4-8015-4177-ac17-2576b5d1e514}Mar. 16, 2016http://bond.bvsd.org/projects/Boulder/DATMeetingDocs/DAT%20Meeting%20Summary_08.pdf, http://bond.bvsd.org/projects/Boulder/DATMeetingDocs/DAT%20Meeting%20Summary_08.pdf
February 9, 2016http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=10http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=10{28e838a4-8015-4177-ac17-2576b5d1e514}February 9, 2016http://bond.bvsd.org/projects/Boulder/DATMeetingDocs/2016-0207-BHSDATMtgSummary_07.pdf, http://bond.bvsd.org/projects/Boulder/DATMeetingDocs/2016-0207-BHSDATMtgSummary_07.pdf
Jan. 12, 2016http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=9http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=9{28e838a4-8015-4177-ac17-2576b5d1e514}Jan. 12, 2016http://bond.bvsd.org/projects/Boulder/DATMeetingDocs/BHS%20DAT%20Meeting%20Summary_06.pdf, http://bond.bvsd.org/projects/Boulder/DATMeetingDocs/BHS%20DAT%20Meeting%20Summary_06.pdf
Dec. 10, 2015http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=8http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=8{28e838a4-8015-4177-ac17-2576b5d1e514}Dec. 10, 2015http://bond.bvsd.org/projects/Boulder/DATMeetingDocs/2015-1210-BHSDAT5Minutes.pdf, http://bond.bvsd.org/projects/Boulder/DATMeetingDocs/2015-1210-BHSDAT5Minutes.pdf
December 4, 2015 | Field Househttp://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=15http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=15{28e838a4-8015-4177-ac17-2576b5d1e514}December 4, 2015 | Field Househttp://bond.bvsd.org/projects/Boulder/DATMeetingDocs/DAT%20BHS%20Field%20House%20Meeting%20Summary_02.pdf, http://bond.bvsd.org/projects/Boulder/DATMeetingDocs/DAT%20BHS%20Field%20House%20Meeting%20Summary_02.pdf
November 5, 2015 | Field Househttp://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=14http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=14{28e838a4-8015-4177-ac17-2576b5d1e514}November 5, 2015 | Field Househttp://bond.bvsd.org/projects/Boulder/DATMeetingDocs/DAT%20BHS%20Field%20House%20Meeting%20Summary_01.pdf, http://bond.bvsd.org/projects/Boulder/DATMeetingDocs/DAT%20BHS%20Field%20House%20Meeting%20Summary_01.pdf
Oct. 26, 2015 | Recht Fieldhttp://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=7http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=7{28e838a4-8015-4177-ac17-2576b5d1e514}Oct. 26, 2015 | Recht Fieldhttp://www.bvsd.org/CapitalImprovements/Documents/Boulder%20High/DAT%20Recht%20Field%20Meeting%20Summary_03.pdf, http://www.bvsd.org/CapitalImprovements/Documents/Boulder%20High/DAT%20Recht%20Field%20Meeting%20Summary_03.pdf
Oct. 12, 2015 | Recht Fieldhttp://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=6http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=6{28e838a4-8015-4177-ac17-2576b5d1e514}Oct. 12, 2015 | Recht Fieldhttp://www.bvsd.org/CapitalImprovements/Documents/Boulder%20High/Recht%20Field%20DAT%202%20Minutes%2010-12-15.pdf, http://www.bvsd.org/CapitalImprovements/Documents/Boulder%20High/Recht%20Field%20DAT%202%20Minutes%2010-12-15.pdf
Oct. 6, 2015http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=5http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=5{28e838a4-8015-4177-ac17-2576b5d1e514}Oct. 6, 2015http://www.bvsd.org/CapitalImprovements/Documents/Boulder%20High/DAT%20Meeting%20Summary_04.pdf, http://www.bvsd.org/CapitalImprovements/Documents/Boulder%20High/DAT%20Meeting%20Summary_04.pdf
Sept. 28, 2015 | Recht Fieldhttp://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=4http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}Sept. 28, 2015 | Recht Fieldhttp://www.bvsd.org/CapitalImprovements/Documents/Boulder%20High/RechtFieldDAT1Mnts092815.pdf, http://www.bvsd.org/CapitalImprovements/Documents/Boulder%20High/RechtFieldDAT1Mnts092815.pdf
Sept. 22, 2015http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=3http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Sept. 22, 2015http://www.bvsd.org/CapitalImprovements/Documents/Boulder%20High/DATMtgSumm03.pdf, http://www.bvsd.org/CapitalImprovements/Documents/Boulder%20High/DATMtgSumm03.pdf
Sept. 8, 2015http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=2http://bond.bvsd.org/projects/Boulder/Lists/DAT Meetings List/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Sept. 8, 2015http://www.bvsd.org/CapitalImprovements/Documents/Boulder%20High/BHSDATMtgSummary02.pdf, http://www.bvsd.org/CapitalImprovements/Documents/Boulder%20High/BHSDATMtgSummary02.pdf

Timeline

 

 

Construction June 2015 - Aug. 2017http://bond.bvsd.org/projects/Boulder/Lists/Project Timeline/DispForm.aspx?ID=1http://bond.bvsd.org/projects/Boulder/Lists/Project Timeline/DispForm.aspx?ID=1{28e838a4-8015-4177-ac17-2576b5d1e514}Construction June 2015 - Aug. 2017In Progressinfo
Construction Documentshttp://bond.bvsd.org/projects/Boulder/Lists/Project Timeline/DispForm.aspx?ID=4http://bond.bvsd.org/projects/Boulder/Lists/Project Timeline/DispForm.aspx?ID=4{28e838a4-8015-4177-ac17-2576b5d1e514}Construction DocumentsMarch 2016Completesuccess
Design Developmenthttp://bond.bvsd.org/projects/Boulder/Lists/Project Timeline/DispForm.aspx?ID=2http://bond.bvsd.org/projects/Boulder/Lists/Project Timeline/DispForm.aspx?ID=2{28e838a4-8015-4177-ac17-2576b5d1e514}Design DevelopmentDecember 2015Completesuccess
Schematic Designhttp://bond.bvsd.org/projects/Boulder/Lists/Project Timeline/DispForm.aspx?ID=3http://bond.bvsd.org/projects/Boulder/Lists/Project Timeline/DispForm.aspx?ID=3{28e838a4-8015-4177-ac17-2576b5d1e514}Schematic DesignOct. 2015Completesuccess

Images

expand + Yr/Month : July 2016 ‎(9)
expand + Yr/Month : June 2016 ‎(6)
expand + Yr/Month : May 2016 ‎(4)

Scope of Work

​Facility Condition

  • Exterior building improvements such as repair/replace windows and doors, paint and repair stonework
  • Repair/replace roof
  • Renovate backstage area/dressing rooms/restrooms
  • Renovate band area
  • Renovate kitchen and cafeteria
  • Restroom renovations
  • Repair/replace interior doors
  • Improvements to interior finishes such as curtains, ceilings, carpet, flooring and paint
  • Asbestos abatement
  • Plumbing improvements including ADA
  • HVAC repair/replacement
  • Communications systems repair/replacement
  • Repair/replace  fixtures such as casework and stage rigging
  • Site improvements such as fencing, drainage and paving
  • Audio enhance​ment in all classrooms**​

Program Compatibility Assessment

  • Provide adequate Special Education space​​​​

Health and Physical Development

  • Stadium renovations including bleachers, track and turf
  • Provide new field house
  • Provide multi-purpose fitness room
  • Modernize weight room
  • Repair tennis courts​

Safety and Security

  • Redesign main entry to provide more control over visitor access
  • Install camera/intercom security system
  • Replace/add exterior cameras
  • Install electronic security controls
  • Install security partitions​

Sustainability​

  • Upgrade lighting
  • Upgrade HVAC controls
  • Replace aged boiler with more efficient condensing type

Innovation​

Boulder High School is eligible to receive up to $800,000 in additional funds to implement facility improvements that support innovative teaching methods​​.

** Not included in project budget